<table>
<tr>
<th>Published:</th>
<td>27.03.2024 12:54:26</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>03.04.2024 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>04.04.2024 14:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW. Due to diving works in Imatra HPP the maximum available capacity is approximately 150 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
5527eb13-4dc8-4afc-b9c1-73f4b0abea83_3Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32024-03-26T12:16:02Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.03.2024 13:16:02</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>04.03.2024 08:00</td>
<td>06.04.2024 06:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
2f6a8035-2e97-4444-9834-47a48f00902c_3Other market information2024-03-26T09:01:37Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.03.2024 10:01:37</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>26.03.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.03.2024 09:56</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event end time. - Oulujoki river. Installed production capacity 440 MW. Due to diving at the Utanen hpp the max available capacity is approximately 340 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
10a3082e-e42d-423d-8fd6-f1ef61167b4a_3Other market information2024-03-25T14:58:16Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>25.03.2024 15:58:16</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>25.03.2024 12:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>25.03.2024 16:15</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. - Oulujoki river. Installed production capacity 440 MW.
Due to diving at the Utanen hpp the max available capacity is approximately 340 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
6139a46d-b330-4735-807b-a4e1cf7062c0_3Planned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2024-03-25T14:14:23Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>25.03.2024 15:14:23</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Transformer maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>120 MW</td>
<td>260 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>25.03.2024 07:00</td>
<td>25.03.2024 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
eb298dc6-dcc6-49a2-8011-09754f149819_1Other market information2024-03-14T08:37:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.03.2024 09:37:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>21.03.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>21.03.2024 12:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Kemijoki river. Installed production capacity 800 MW. Due to maintenances at the Petäjäskoski HPP, the available capacity varies between 570 - 760 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
65e119a9-8e95-426f-b206-d40da818847a_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2024-03-13T13:25:05Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.03.2024 14:25:05</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Planned maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>18.03.2024 07:00</td>
<td>20.03.2024 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
ee995eaf-2461-4d8c-8b61-e32968f0bfd9_5Other market information2024-03-13T07:19:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.03.2024 08:19:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>11.03.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>15.03.2024 10:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW. Due to maintenances at the Ossauskoski HPP, the available maximum capacity varies between approximately 640 - 760 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
d3ca55f1-efeb-4dee-8ce6-f4984eef38c8_4Other market information2024-03-07T06:45:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.03.2024 07:45:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>06.03.2024 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>08.03.2024 13:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. - Kemijoki river. Installed production capacity 800 MW. Due to maintenances at the Ossauskoski HPP, the available maximum capacity varies between approximately 640 - 760 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
0398767b-352e-4313-afc5-ada3164b86b4_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2024-03-05T13:08:36Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.03.2024 14:08:36</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance on G2.
During start and end all units unavailable.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>0 MW</td>
<td>330 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>17.08.2024 08:00</td>
<td>17.08.2024 18:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>17.08.2024 18:00</td>
<td>18.08.2024 08:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>18.08.2024 08:00</td>
<td>18.08.2024 18:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>18.08.2024 18:00</td>
<td>27.11.2024 08:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>27.11.2024 08:00</td>
<td>27.11.2024 18:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>27.11.2024 18:00</td>
<td>28.11.2024 08:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>28.11.2024 08:00</td>
<td>28.11.2024 18:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>28.11.2024 18:00</td>
<td>29.11.2024 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
daed312b-341f-4a7e-9cca-2ec60e8d8b0c_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12024-03-04T11:37:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.03.2024 12:37:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Suomenoja 1 permanently shut down as of 28.04.2024, see other UMM: https://umm.nordpoolgroup.com/#/messages/81c20d84-841b-46d2-9e1a-283e0ffa3218/1</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>28.04.2024 23:00</td>
<td>16.06.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
81c20d84-841b-46d2-9e1a-283e0ffa3218_1Other market information2024-03-04T11:33:56Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.03.2024 12:33:56</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>28.04.2024 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Suomenoja 1</td>
</tr>
<tr>
<th>Remarks:</th>
<td>The coal-fired Suomenoja 1 CHP unit (EIC 44W-T-YT-100012E ) with installed power production capacity of 75 MW, will be permanently shut down as of 28.04.2024</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
0fa07306-62d8-46e5-a43f-78e785362262_23Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2024-03-02T20:16:33Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.03.2024 21:16:33</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Grid failure.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>240 MW</td>
<td>140 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>12.02.2024 06:15</td>
<td>15.02.2024 07:30</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>15.02.2024 07:30</td>
<td>15.02.2024 14:35</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>240 MW</td>
<td>140 MW</td>
<td></td>
<td></td>
<td>15.02.2024 14:35</td>
<td>21.02.2024 07:30</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>21.02.2024 07:30</td>
<td>22.02.2024 11:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>240 MW</td>
<td>140 MW</td>
<td></td>
<td></td>
<td>22.02.2024 11:00</td>
<td>27.02.2024 07:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>27.02.2024 07:00</td>
<td>27.02.2024 17:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>235 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>27.02.2024 17:00</td>
<td>27.02.2024 22:15</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>20 MW</td>
<td>360 MW</td>
<td></td>
<td></td>
<td>27.02.2024 22:15</td>
<td>28.02.2024 07:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>28.02.2024 07:00</td>
<td>28.02.2024 17:02</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>28.02.2024 17:02</td>
<td>28.02.2024 18:30</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>250 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>28.02.2024 18:30</td>
<td>29.02.2024 07:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>380 MW</td>
<td></td>
<td></td>
<td>29.02.2024 07:00</td>
<td>29.02.2024 14:42</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>250 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>29.02.2024 14:42</td>
<td>02.03.2024 21:11</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
f3a75611-79fa-4a4c-ba91-0c5c998da835_3Other market information2024-03-01T10:16:58Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.03.2024 11:16:58</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>23.02.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>01.03.2024 11:11</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW.
Due to maintenances at the Petäjäskoski HPP, the available maximum capacity varies between approximately 500 - 730 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
d09ec29d-46e3-4c8b-bd9a-c7308b2a3f96_2Other market information2024-02-28T08:17:16Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>28.02.2024 09:17:16</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>27.02.2024 23:52</td>
</tr>
<tr>
<th>Event stop:</th>
<td>28.02.2024 09:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Björnberget Vindkraft</td>
</tr>
<tr>
<th>Remarks:</th>
<td>updated the availability according to the following UMM.
https://umm.nordpoolgroup.com/#/messages/b9cc5721-4e52-4e10-9be0-e5745d82657d/1</td>
</tr>
</table>
<h3>Assets</h3>
<table>
<tr>
<td>46WPU0000000203V</td>
<td>:</td>
<td>Björnberget Vindkraft</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
013c1276-f778-4bd4-ad4d-dabb184b52ee_2Other market information2024-02-26T13:39:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.02.2024 14:39:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>01.04.2024 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>31.12.2026 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Meri-Pori</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event start.
Fortum and the Finnish National Emergency Supply Agency (NESA) has amended the agreement
regarding Meri-Pori coal power plant (44W-T-LV-000003N).
Per amended agreement, effective from 1.4.2024 to 31.12.2026, the full capacity of Meri-Pori (565 MW)
will not be available for the market, and only operated upon decision by relevant authorities.
More information about Meri-Pori’s operation in the period 1.4.2024–31.12.2026, NESA phone: +358 29 505 1015</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
4ff85005-2f6d-40b3-9935-3d9b722d9c3e_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2024-02-26T06:42:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.02.2024 07:42:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance cancelled.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>27.02.2024 09:00</td>
<td>27.02.2024 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
2ff38747-fe88-46ba-b21b-1143ebbecba3_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2024-02-26T06:42:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.02.2024 07:42:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance cancelled.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>27.02.2024 09:00</td>
<td>27.02.2024 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
b58ad9d2-8b2c-4c9d-932f-5935fb03aeca_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 62024-02-26T06:40:49Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.02.2024 07:40:49</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance cancelled.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 6</td>
<td>44W-T-YT-1000158</td>
<td></td>
<td>45 MW</td>
<td>0 MW</td>
<td>45 MW</td>
<td></td>
<td></td>
<td>27.02.2024 09:00</td>
<td>27.02.2024 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
4006f4c0-f817-47ba-80a4-427227212742_1Unplanned, Unavailability of electricity facilities: Production, FI, Naantali - Na4CHP2024-02-18T05:47:25Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.02.2024 06:47:25</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Biomass</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na4CHP</td>
<td>44W-00000000009F</td>
<td></td>
<td>145 MW</td>
<td>0 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>18.02.2024 06:40</td>
<td>18.02.2024 09:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
cdbd957f-2ea8-4a81-85da-1fb3cdfa1a3a_1Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2024-02-06T05:05:09Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>06.02.2024 06:05:09</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>06.02.2024 05:50</td>
<td>06.02.2024 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
1b2ec18b-b7f5-448a-b08b-d1bd61434183_1Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2024-02-06T05:05:07Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>06.02.2024 06:05:07</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>06.02.2024 05:50</td>
<td>06.02.2024 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
852c6954-388c-4e12-a076-dfa2578a8093_1Planned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2024-02-03T13:48:20Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>03.02.2024 14:48:20</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Unavailability due to technical issues.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Prolonging of the maintenance in the following UMM https://umm.nordpoolgroup.com/#/messages?publicationDate=all&eventDate=nextweek&units=46WPU0000000203V</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>235 MW</td>
<td>137 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>06.02.2024 12:01</td>
<td>18.02.2024 23:59</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<td>RES Renewable Norden AB</td>
</tr>
</table>
e8a7a8b8-438e-4eaf-9855-1552efc84c6f_3Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2024-02-01T05:37:58Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.02.2024 06:37:58</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Weather conditions is causing icing on wind park, which currenty gives approximately 0-60 MW.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time. - Installed capacity at the moment 347 MW</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>0 MW</td>
<td>380 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>31.01.2024 11:30</td>
<td>01.02.2024 06:25</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
bb4f5fce-0087-42dd-9755-235cc305a9bb_4Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12024-01-30T18:49:39Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>30.01.2024 19:49:39</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Planned maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>27.01.2024 11:00</td>
<td>30.01.2024 19:46</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
b34a8d73-9292-4cfb-b86e-2fb43bc6b323_1Other market information2024-01-23T15:16:37Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>23.01.2024 16:16:37</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>26.01.2024 13:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.01.2024 16:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE3</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Trängslet</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Testing capacities for the generator. Production will vary between min to max. Maximum available capacity 110 MW.</td>
</tr>
</table>
<h3>Assets</h3>
<table>
<tr>
<td>46WGU00000000046</td>
<td>:</td>
<td>Trängslet G3</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
0306cf70-7693-4a7a-a9ba-fb2ed02d84fe_1Other market information2024-01-23T15:11:55Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>23.01.2024 16:11:55</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>26.01.2024 09:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.01.2024 12:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE3</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Trängslet</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Testing capacities for the two generators. Production will vary between min to max. Maximum available capacity 160 MW.</td>
</tr>
</table>
<h3>Assets</h3>
<table>
<tr>
<td>46WGU0000000002A</td>
<td>:</td>
<td>Trängslet G1</td>
</tr>
<tr>
<td>46WGU00000000038</td>
<td>:</td>
<td>Trängslet G2</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
1ee11570-9734-4abe-ad59-04ea5448cc89_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22024-01-17T05:08:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.01.2024 06:08:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>17.01.2024 06:03</td>
<td>17.01.2024 08:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
00fef288-c645-4071-89df-351be4dba196_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2024-01-16T13:01:41Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.01.2024 14:01:41</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>01.09.2024 23:00</td>
<td>08.09.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
6ffca009-283a-478e-a91e-9430797f6d2b_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2024-01-16T13:00:40Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.01.2024 14:00:40</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>01.09.2024 23:00</td>
<td>08.09.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
22388d32-6990-40bd-8461-e4035ab5dd75_5Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 22024-01-15T20:12:40Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.01.2024 21:12:40</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Measurement failure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Plant is technically available and upon a decision to resume to full production approximately within 12 hours.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 2</td>
<td>44W-T-YV-0000018</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>14.01.2024 14:46</td>
<td>15.01.2024 11:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>280 MW</td>
<td>227 MW</td>
<td></td>
<td></td>
<td>15.01.2024 11:00</td>
<td>15.01.2024 20:58</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
c1ede0dd-81d8-4e28-8b04-b0b6b68087f3_2Planned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2024-01-10T13:09:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>10.01.2024 14:09:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Testing of the control system in the wind park.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time. The capacity of Pjelax wind farm is approximately 250 MW at the moment. Production will vary between 0-250 MW during the tests.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>0 MW</td>
<td>380 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>10.01.2024 07:00</td>
<td>10.01.2024 14:04</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
4d35e266-af35-4f83-a545-2b3e95019a74_6Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2024-01-09T06:48:04Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.01.2024 07:48:04</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems with the power plant regulation electronics.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>04.12.2023 06:51</td>
<td>09.01.2024 07:43</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
87787cb6-ab85-4a12-961f-9cb3ca4e66d6_5Unplanned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2024-01-08T10:19:57Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.01.2024 11:19:57</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Weather conditions give icing on wind park. The current icing level is uncertain.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>233 MW</td>
<td>139 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>02.01.2024 13:30</td>
<td>08.01.2024 11:13</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
2c8c3dab-6339-49bf-baf0-ba2262bd1a86_2Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2024-01-07T07:23:22Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.01.2024 08:23:22</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Icing problems</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. The capacity of Pjelax wind farm is approximately 230 MW at the moment. Available production capacity varies between 0 - 100 MW. Duration of the event is highly uncertain.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>0 MW</td>
<td>380 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>07.01.2024 01:00</td>
<td>07.01.2024 08:21</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
18793c3a-f1e7-472c-85b2-c0c9bb00cb23_1Unplanned, Unavailability of electricity facilities: Production, FI, Meri-Pori - B12024-01-05T06:11:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.01.2024 07:11:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problem with turbine measurement.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Meri-Pori</td>
<td>44W-T-LV-000003N</td>
<td>FI</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>Fossil HardCoal</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>B1</td>
<td>44W-T-LV-100005C</td>
<td></td>
<td>565 MW</td>
<td>0 MW</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>05.01.2024 06:58</td>
<td>05.01.2024 09:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
2c110a12-fbdf-4476-b505-4388987c14e0_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12024-01-05T00:07:15Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.01.2024 01:07:15</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure in stop sequence.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Available to market.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>04.01.2024 23:55</td>
<td>05.01.2024 01:03</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
2e99a3eb-66cd-418f-8a17-2ec3f87ab709_2Unplanned, Unavailability of electricity facilities: Production, FI, Meri-Pori - B12024-01-04T10:01:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.01.2024 11:01:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problem with turbine turning gear</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Meri-Pori</td>
<td>44W-T-LV-000003N</td>
<td>FI</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>Fossil HardCoal</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>B1</td>
<td>44W-T-LV-100005C</td>
<td></td>
<td>565 MW</td>
<td>0 MW</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>03.01.2024 10:11</td>
<td>04.01.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
eaa3663c-7eff-4fb9-98fa-7197693f11d9_1Other market information2023-12-22T13:54:21Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.12.2023 14:54:21</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>27.12.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>27.12.2023 17:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Meri-Pori</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Meri-Pori ( 44W-T-LV-000003N ) Reason: Test run period. Output varies between 0-565 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
cd14c46e-8528-42c2-aa4e-eea81e398822_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-12-20T12:19:20Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>20.12.2023 13:19:20</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time and capacity.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>0 MW</td>
<td>330 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>20.12.2023 09:00</td>
<td>20.12.2023 14:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>20.12.2023 14:00</td>
<td>20.12.2023 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
3d843332-4d43-47c0-b77b-6a6962704314_3Planned, Unavailability of electricity facilities: Production, SE2, Krångede - G12023-12-19T19:01:12Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.12.2023 20:01:12</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Available to the market</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Krångede</td>
<td>46WPU0000000085B</td>
<td>SE2</td>
<td>252 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU00000001887</td>
<td></td>
<td>42 MW</td>
<td>0 MW</td>
<td>42 MW</td>
<td></td>
<td></td>
<td>26.06.2023 08:00</td>
<td>19.12.2023 19:56</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<td>Sydkraft Hydropower AB</td>
</tr>
</table>
e7031981-8b3c-4451-b9e8-562995c62fb7_1Other market information2023-12-19T13:35:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.12.2023 14:35:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>20.12.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>20.12.2023 08:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Pjelax Windfarm</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Error in spot bid. Sold approximately 135 MW too much for PH01 - PH08.</td>
</tr>
</table>
<h3>Assets</h3>
<table>
<tr>
<td>44W-00000000027D</td>
<td>:</td>
<td>Pjelax Windfarm</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
7acde522-fe44-40f2-838f-7e84e03665e2_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-12-18T10:09:44Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.12.2023 11:09:44</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance postponed. New UMM will come with new information.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>19.12.2023 08:00</td>
<td>19.12.2023 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
7d1206e0-ec45-4465-bb40-aac43694a0d8_1Planned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2023-12-18T08:25:17Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.12.2023 09:25:17</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Grid work. This also affects Gubbaberget with 75 MW installed capacity, which will be unavailable during the time period.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>0 MW</td>
<td>372 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>19.12.2023 07:00</td>
<td>20.12.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
e74675f8-f266-457d-aa5e-418992e2cf99_2Unplanned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2023-12-15T21:01:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.12.2023 22:01:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Weather conditions give icing on wind park.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Event stopped.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>0 MW</td>
<td>372 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>15.12.2023 11:10</td>
<td>15.12.2023 21:57</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
a9e49b80-633c-4853-81e7-1cf81f270a3f_2Planned, Unavailability of electricity facilities: Production, FI, Naantali - Na4CHP2023-12-15T16:43:25Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.12.2023 17:43:25</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Political strike</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Biomass</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na4CHP</td>
<td>44W-00000000009F</td>
<td></td>
<td>145 MW</td>
<td>0 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>14.12.2023 02:00</td>
<td>15.12.2023 17:40</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
a0b3ef72-7c14-45be-98d7-1989f826bf62_5Unplanned, Unavailability of electricity facilities: Production, FI, Meri-Pori - B12023-12-15T16:00:31Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.12.2023 17:00:31</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems on the turbine side.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Meri-Pori</td>
<td>44W-T-LV-000003N</td>
<td>FI</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>Fossil HardCoal</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>B1</td>
<td>44W-T-LV-100005C</td>
<td></td>
<td>565 MW</td>
<td>0 MW</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>04.12.2023 03:00</td>
<td>22.12.2023 19:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
08c130c6-0fe8-46b1-8ad6-c9863a6f4e15_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-12-14T13:48:49Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 14:48:49</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Event stop</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>14.12.2023 09:00</td>
<td>14.12.2023 14:42</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
6bc967a2-ab37-47ea-8f9a-f96b27ca701a_1Planned, Unavailability of electricity facilities: Production, FI, Naantali - Na32023-12-14T12:44:55Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 13:44:55</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Fossil HardCoal</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na3</td>
<td>44W-T-YT-1000077</td>
<td></td>
<td>105 MW</td>
<td>0 MW</td>
<td>105 MW</td>
<td></td>
<td></td>
<td>08.09.2024 23:00</td>
<td>06.10.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
83c1de51-5970-4b26-828f-7030a126b837_1Planned, Unavailability of electricity facilities: Production, FI, Naantali2023-12-14T12:32:34Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 13:32:34</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td>0 MW</td>
<td>250 MW</td>
<td>Biomass</td>
<td></td>
<td>28.07.2024 23:00</td>
<td>11.08.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
4b1218b9-3f03-41a4-a1e1-702a4f2e6f41_1Planned, Unavailability of electricity facilities: Production, FI, Naantali - Na4CHP2023-12-14T12:25:48Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 13:25:48</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Biomass</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na4CHP</td>
<td>44W-00000000009F</td>
<td></td>
<td>145 MW</td>
<td>0 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>02.06.2024 23:00</td>
<td>25.08.2024 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
d4c7bf65-91f3-4351-af44-512a579c2536_2Unplanned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2023-12-14T09:09:15Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 10:09:15</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Weather conditions give icing on wind park. The production will vary between 0-50 MW.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Event stop</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>50 MW</td>
<td>322 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>11.12.2023 11:09</td>
<td>14.12.2023 10:06</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
ea4e64d5-43a5-40fb-a3ba-0c0201966a9a_3Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-12-14T08:30:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.12.2023 09:30:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Political strike</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>14.12.2023 03:00</td>
<td>15.12.2023 08:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
a698ec12-5265-4c1c-bf6a-c3773dfcf227_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2023-12-12T13:13:01Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>12.12.2023 14:13:01</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Failure of the Suomenoja 2 ST, see UMM: https://umm.nordpoolgroup.com/#/messages/4d35e266-af35-4f83-a545-2b3e95019a74/4</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Political strike</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>13.12.2023 23:00</td>
<td>14.12.2023 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
1e448f1e-c3d9-404d-a1a3-6c7e48fb7909_7Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-12-11T16:23:31Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 17:23:31</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>06.12.2023 11:58</td>
<td>11.12.2023 20:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
d9a2f569-aad8-46c8-9b53-f9ec9219d968_3Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2023-12-11T09:40:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 10:40:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Icing problem.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time. -The capacity of Pjelax wind farm is approximately 230 MW at the moment. Available production capacity varies between 0 - 100 MW.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>100 MW</td>
<td>280 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>09.12.2023 11:15</td>
<td>13.12.2023 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
de0cb5ab-a439-46c8-827d-9f9d6e4084af_1Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 22023-12-11T08:33:32Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:33:32</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short refuelling outage</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 2</td>
<td>44W-T-YV-0000018</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>22.08.2027 00:00</td>
<td>08.09.2027 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
44641893-95d8-4030-ba81-5aa351481b78_2Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 22023-12-11T08:27:12Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:27:12</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Normal refuelling outage.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 2</td>
<td>44W-T-YV-0000018</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>04.08.2024 00:00</td>
<td>25.08.2024 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
eed38c2c-52b7-4987-b88c-e09bda0a342a_1Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-12-11T08:24:15Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:24:15</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short refuelling outage</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>11.09.2027 00:00</td>
<td>28.09.2027 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
3e81244b-b10c-459e-80bd-e5f645f76ef5_2Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-12-11T08:17:11Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:17:11</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Inspection outage</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>31.08.2024 00:00</td>
<td>30.09.2024 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
6776a393-0182-46a6-baf3-0e5c71423121_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2023-12-11T08:06:27Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:06:27</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Political strike</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>13.12.2023 23:00</td>
<td>14.12.2023 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
13e7d7ac-e9c4-40c3-a83e-e41d6fbaf25b_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 62023-12-11T08:00:16Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.12.2023 09:00:16</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Political strike</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 6</td>
<td>44W-T-YT-1000158</td>
<td></td>
<td>45 MW</td>
<td>0 MW</td>
<td>45 MW</td>
<td></td>
<td></td>
<td>13.12.2023 23:00</td>
<td>14.12.2023 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
66d08898-99d9-4233-a4d4-6fd6da94697c_2Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-12-09T07:54:02Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.12.2023 08:54:02</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>09.12.2023 07:00</td>
<td>10.12.2023 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
854079ea-8ec6-4bf8-81b1-a23eeda0da15_2Other market information2023-12-08T14:47:05Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.12.2023 15:47:05</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>06.12.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>12.12.2023 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to ice cover making the available capacity varies between 170 - 320 MW between 6.12.2023 0:00 and 11.12.2023 0:00. Available capacity varies between 200-370MW between 11.12.2023 00:00 and 12.12.2023 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
520f74c1-718f-415a-8084-8f7d87999795_2Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2023-12-08T07:22:45Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.12.2023 08:22:45</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Icing problem.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>The capacity of Pjelax wind farm is approximately 230 MW at the moment. Available production capacity varies between 0 - 100 MW. Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>100 MW</td>
<td>280 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>07.12.2023 08:55</td>
<td>08.12.2023 08:17</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
0e74bd09-aabd-4fdb-a993-01ed4893f6fc_1Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-12-07T10:02:27Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.12.2023 11:02:27</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>07.12.2023 12:00</td>
<td>07.12.2023 13:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
88f1f2de-8708-4b1e-a3f4-2dafaeede8b3_4Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-12-07T07:47:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.12.2023 08:47:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Mechanical failure, time uncertain.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>updated stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>01.12.2023 14:35</td>
<td>07.12.2023 08:45</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
c35a6230-f710-458e-8439-b9cef837c2f2_2Other market information2023-12-01T10:53:02Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.12.2023 11:53:02</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>30.11.2023 11:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>01.12.2023 11:50</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Meri-Pori</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Meri-Pori ( 44W-T-LV-000003N ) Reason: Test run period. Output varies between 0-565 MW. Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
b74f4f56-0140-43aa-8dd4-e9b7001611dc_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-12-01T09:24:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.12.2023 10:24:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>24.06.2024 08:00</td>
<td>28.06.2024 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
1cbf430e-7ca0-477a-a8b8-71a03356668d_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-12-01T09:23:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.12.2023 10:23:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>10.06.2024 08:00</td>
<td>14.06.2024 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
57731919-16c8-4b50-8262-e7646f958847_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-12-01T09:21:09Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.12.2023 10:21:09</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Work in intake area and electric work in substation.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Prolonged time due to added maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>0 MW</td>
<td>330 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>06.04.2024 06:00</td>
<td>07.04.2024 18:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>200 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>07.04.2024 18:00</td>
<td>11.05.2024 06:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>11.05.2024 06:00</td>
<td>12.05.2024 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
42687636-32ab-4c84-bdf0-447d0e2d3aa1_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-30T09:31:44Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>30.11.2023 10:31:44</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>01.12.2023 10:00</td>
<td>01.12.2023 12:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
0cb01308-5030-4e28-be92-03dadcde09ed_3Other market information2023-11-29T12:29:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.11.2023 13:29:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>29.11.2023 13:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>29.11.2023 13:28</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to diving works on Pirttikoski HPP production capacity is limited by 110MW. Updated event stop time</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
da465f4a-3cc9-4c4c-828b-71da254ae2dd_2Other market information2023-11-29T10:32:35Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.11.2023 11:32:35</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>12.11.2023 10:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>04.12.2023 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to ice cover making the updated available capacity and time is following: 190 - 300 MW until 30.11.23 0:00; 190 - 320 MW from 30.11.23 0:00 until 3.12.23 0:00; 190-370 MW from 3.12.23 0:00 until 4.12.23 0:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
9453782c-d3f7-4d94-8d3c-a187b667e824_2Other market information2023-11-29T07:28:51Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.11.2023 08:28:51</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>29.11.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>29.11.2023 09:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to diving works on Pirttikoski HPP production capacity is limited by 110MW. Updated event stop time</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
d553b737-f39b-4413-967f-5e6d9a413907_5Planned, Unavailability of electricity facilities: Production, FI, Meri-Pori - B12023-11-28T13:40:51Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>28.11.2023 14:40:51</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Meri-Pori</td>
<td>44W-T-LV-000003N</td>
<td>FI</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>Fossil HardCoal</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>B1</td>
<td>44W-T-LV-100005C</td>
<td></td>
<td>565 MW</td>
<td>0 MW</td>
<td>565 MW</td>
<td></td>
<td></td>
<td>01.10.2023 00:00</td>
<td>30.11.2023 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
603d1a79-4859-44e7-8201-a8623d818f17_1Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2023-11-26T12:28:29Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.11.2023 13:28:29</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>26.11.2023 13:19</td>
<td>26.11.2023 15:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
a5998f7f-48d6-482f-ba3b-a85a7b1178c4_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-24T18:57:55Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.11.2023 19:57:55</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problem with stop sequence.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>24.11.2023 19:51</td>
<td>24.11.2023 21:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
c2043500-9795-4d10-ab8c-d62705c64e12_2Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-11-24T16:06:26Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.11.2023 17:06:26</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Boiler problems</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>24.11.2023 15:12</td>
<td>24.11.2023 20:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
2c8b4840-2134-453f-825b-8ca2611c5404_4Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-11-24T10:09:20Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.11.2023 11:09:20</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>22.11.2023 15:00</td>
<td>24.11.2023 13:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
2ea99ad9-5799-40b6-9659-5bba1afacb7b_1Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-11-22T15:55:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 16:55:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>29.11.2023 07:00</td>
<td>29.11.2023 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
dc2a1e55-dcfc-4a8f-80db-b4c13408fcec_2Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-11-22T12:39:46Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 13:39:46</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>22.11.2023 08:00</td>
<td>22.11.2023 13:37</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
0f9afaff-ba17-4d90-8b70-0550f4e6a374_3Other market information2023-11-22T09:56:18Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 10:56:18</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>23.11.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>23.11.2023 10:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated schedule. - Due to diving works on Pirttikoski HPP production capacity is limited by 110MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
3f44218e-6ddb-48d8-852e-05e3c6a5b89c_3Other market information2023-11-22T09:52:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 10:52:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Diving cancelled</td>
</tr>
<tr>
<th>Event start:</th>
<td>23.11.2023 14:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>23.11.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to diving works on Pirttikoski HPP production capacity is limited by 110MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
ad914a6c-7ac8-4667-a6ec-773aba573746_2Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-11-22T09:12:48Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 10:12:48</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance cancelled</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>23.11.2023 07:00</td>
<td>23.11.2023 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
e9af0656-603b-47e0-8a7c-4a27026da921_12Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2023-11-22T06:18:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.11.2023 07:18:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Icing problem.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>0 MW</td>
<td>380 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>11.11.2023 04:00</td>
<td>22.11.2023 07:12</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
c8988601-0cf1-44b2-a545-7e8188d59e0f_3Other market information2023-11-20T13:40:43Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>20.11.2023 14:40:43</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>14.11.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>22.11.2023 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. - Kemijoki river. Installed production capacity 800 MW.
Due to ice cover making and maintenances the available capacity varies between 680 - 700 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
0578a72c-7f26-47ff-af84-e2a96c247e85_3Other market information2023-11-20T07:42:29Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>20.11.2023 08:42:29</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Diving cancelled</td>
</tr>
<tr>
<th>Event start:</th>
<td>20.11.2023 12:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>20.11.2023 14:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event start and stop times. - Due to diving works on Pirttikoski HPP production capacity is limited by 110MW in addition to limitations informed in UMM of 16.11. https://umm.nordpoolgroup.com/#/messages/c8988601-0cf1-44b2-a545-7e8188d59e0f/2</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
737879b6-bcfa-4b99-b0ad-1af83a7d09dd_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-18T05:09:39Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.11.2023 06:09:39</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Turbine tripped</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>18.11.2023 06:03</td>
<td>18.11.2023 07:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
21a68102-830e-4c0a-b7ef-caf6cab63337_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-11-17T12:59:22Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.11.2023 13:59:22</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance on one generator at a time.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Unavailable capacity will vary between 100 and 130 MW.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>22.11.2023 22:00</td>
<td>23.11.2023 04:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
0aafe304-75a2-47ba-bbcc-c02a51e70550_2Planned, Unavailability of electricity facilities: Production, FI, Naantali - Na4CHP2023-11-17T08:50:07Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.11.2023 09:50:07</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance cancelled.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Biomass</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na4CHP</td>
<td>44W-00000000009F</td>
<td></td>
<td>145 MW</td>
<td>0 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>19.11.2023 03:00</td>
<td>19.11.2023 23:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
0ba2eff9-b35b-4137-ad5c-f01c736e2f31_3Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-11-15T13:03:34Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.11.2023 14:03:34</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>15.11.2023 07:00</td>
<td>15.11.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
8b226db0-2a26-4fa3-b488-360681077a95_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-15T05:08:17Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.11.2023 06:08:17</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>15.11.2023 06:03</td>
<td>15.11.2023 07:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
3856a807-6fce-44d1-85dc-b428e7d0b9c2_2Planned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2023-11-13T13:55:25Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.11.2023 14:55:25</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>No need for UMM.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Grid maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>0 MW</td>
<td>372 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>14.11.2023 13:00</td>
<td>14.11.2023 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
7ecfe5cb-4ef1-41eb-b592-c3497c1e6527_2Other market information2023-11-13T08:39:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.11.2023 09:39:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance can be done without restriction.</td>
</tr>
<tr>
<th>Event start:</th>
<td>25.11.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>06.12.2024 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>During the mentioned period the discharge for Krångede powerplant is restricted to maximum 270 m3/s due to refurbishment. This impacts the discharge of the entire river downstreams Storsjön.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
b9751ecf-563d-4331-946d-733ea09e6919_2Other market information2023-11-13T08:37:14Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.11.2023 09:37:14</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance can be done without restriction.</td>
</tr>
<tr>
<th>Event start:</th>
<td>24.06.2024 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>05.07.2024 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven River</td>
</tr>
<tr>
<th>Remarks:</th>
<td>During the mentioned period the discharge for Krångede powerplant is restricted to maximum 270 m3/s due to refurbishment. This impacts the discharge of the entire river downstreams Storsjön.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
db55d8a0-2a7d-4c02-a58f-3f7b006db10c_3Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-11T03:28:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.11.2023 04:28:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Available for the market.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>11.11.2023 02:37</td>
<td>11.11.2023 04:24</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
61398765-cff6-4509-acc1-f450e1b9243d_3Unplanned, Unavailability of electricity facilities: Production, FI, Pjelax Windfarm2023-11-10T15:18:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>10.11.2023 16:18:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Icing problems</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Pjelax Windfarm</td>
<td>44W-00000000027D</td>
<td>FI</td>
<td>380 MW</td>
<td>115 MW</td>
<td>265 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>10.11.2023 08:44</td>
<td>10.11.2023 16:10</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Pjelax Vindkraft Ab/Oy</td>
</tr>
</table>
5aa40cba-75e5-447c-947a-ce4374dd7b7e_2Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-11-09T08:23:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.11.2023 09:23:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical failure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>08.11.2023 13:38</td>
<td>09.11.2023 09:16</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
2363e55c-d668-4e5b-bf52-5c57a53f174f_3Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-11-08T21:50:46Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 22:50:46</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical failure.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. After event stop the plant will be technically available and upon a decision to start production, full capacity can be reached approximately within 17 hours.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>07.11.2023 19:25</td>
<td>09.11.2023 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
8aac09aa-146e-4014-a261-aab4ac7f36eb_2Other market information2023-11-08T12:52:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 13:52:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>01.11.2025 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Hepokorpi heat pump and electric boiler</td>
</tr>
<tr>
<th>Remarks:</th>
<td>New consumption unit: Hepokorpi heat pump and electric boiler, nominal consumption effect 130 MWe. Commissioning and commercial operation expected during Q4-2025.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
d1d9d21e-a4e2-4028-8011-e556525c3fb4_2Other market information2023-11-08T12:44:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 13:44:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>01.10.2025 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kolabacken heatpump and electric boiler</td>
</tr>
<tr>
<th>Remarks:</th>
<td>New consumption unit: Kolabacken heatpump and electric boiler, nominal consumption effect 100 MWe. Commissioning and commercial operation expected during Q4-2025. Updated information about unit.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
a57286b6-7e22-4d6d-b48d-e292a0f3f2a0_2Other market information2023-11-08T08:47:05Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 09:47:05</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>06.11.2023 10:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>08.11.2023 09:44</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Kemijoki river. Installed production capacity 800 MW.
Due to ice cover making and maintenances in Ossauskoski HPP and Petäjäskoski HPP the available capacity varies between 530 - 730 MW.
Updated event stop time</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
6bd710df-0ba3-4854-bd15-d2b54a66f041_2Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-11-08T07:28:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 08:28:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>08.11.2023 07:17</td>
<td>08.11.2023 08:27</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
295618dd-4b1e-4bd0-a3ae-334024804c4f_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-08T06:08:09Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.11.2023 07:08:09</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>08.11.2023 07:01</td>
<td>08.11.2023 08:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
d41d68a7-378a-4861-a2c3-d5780c2e11ee_3Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 1 - G112023-11-07T18:45:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.11.2023 19:45:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems on the generator side.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. After Event Stop the plant will be technically available and upon a decision to start/resume production, full capacity can be reached within approximately 3,5 hours</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td></td>
<td></td>
<td>Nuclear</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G11</td>
<td>44W-T-YV-1000003</td>
<td></td>
<td>253 MW</td>
<td>0 MW</td>
<td>253 MW</td>
<td></td>
<td></td>
<td>07.11.2023 11:00</td>
<td>07.11.2023 19:25</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
d5091a58-64ae-4cbe-82ae-7734c703c594_2Other market information2023-11-07T07:20:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.11.2023 08:20:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance can be done without restriction.</td>
</tr>
<tr>
<th>Event start:</th>
<td>27.11.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>08.12.2023 17:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>During the mentioned period the discharge for Krångede powerplant is restricted to maximum 270 m3/s due to refurbishment. This impacts the discharge of the entire river downstreams Storsjön.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
111e6fda-35f6-41cc-9ea1-7288f26d171c_3Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-11-03T11:00:14Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>03.11.2023 12:00:14</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>New updated stop time. Maintenance done.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>02.11.2023 08:00</td>
<td>02.11.2023 17:35</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td></td>
<td></td>
<td>02.11.2023 17:35</td>
<td>03.11.2023 08:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>03.11.2023 08:00</td>
<td>03.11.2023 11:55</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
a202af07-4623-4927-8c47-e7ef46e7e007_2Other market information2023-11-02T15:54:10Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.11.2023 16:54:10</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>31.10.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>04.11.2023 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW.
Due to ice cover making and maintenances the available capacity varies between 600 - 700 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
ee6529da-7412-4dcd-8d4c-b012fcc425d7_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G22023-11-02T10:23:22Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.11.2023 11:23:22</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>The job needs to be rescheduled.</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Troubleshooting on turbine.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G2</td>
<td>46WGU00000000038</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>03.11.2023 12:00</td>
<td>03.11.2023 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
5966c267-e64b-4e40-a07c-28d2208d36df_2Other market information2023-11-02T09:04:40Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.11.2023 10:04:40</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>New UMM published as Production Unavailability</td>
</tr>
<tr>
<th>Event start:</th>
<td>14.11.2023 13:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>14.11.2023 17:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Björnberget Vindpark</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Björnberget vindpark, with installed production capacity of 372 MW, will be unavailable due to planned grid maintenance.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
f4613e0d-06da-4a63-b61a-c034f98af939_2Other market information2023-11-02T09:04:09Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.11.2023 10:04:09</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>New UMM published as Production Unavailability</td>
</tr>
<tr>
<th>Event start:</th>
<td>10.11.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>10.11.2023 17:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Björnberget Vindpark</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Björnberget vindpark, with installed production capacity of 372 MW, will be unavailable due to planned maintenance.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
7584ae96-4582-455a-b761-6fbc6d671db5_1Planned, Unavailability of electricity facilities: Production, SE2, Björnberget Vindkraft2023-11-02T08:59:50Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.11.2023 09:59:50</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance affecting whole windpark</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Björnberget Vindkraft</td>
<td>46WPU0000000203V</td>
<td>SE2</td>
<td>372 MW</td>
<td>0 MW</td>
<td>372 MW</td>
<td>Wind Onshore</td>
<td></td>
<td>10.11.2023 07:00</td>
<td>10.11.2023 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Björnberget Vindkraft AB</td>
</tr>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
4fb9fe58-80e3-4545-9479-035426117026_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-11-01T08:22:52Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.11.2023 09:22:52</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>03.11.2023 08:00</td>
<td>03.11.2023 12:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
60324b16-ee5e-4dd5-afa7-695f1ddb0b39_3Unplanned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 62023-10-31T11:12:16Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>31.10.2023 12:12:16</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical failure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 6</td>
<td>44W-T-YT-1000158</td>
<td></td>
<td>45 MW</td>
<td>0 MW</td>
<td>45 MW</td>
<td></td>
<td></td>
<td>27.10.2023 12:39</td>
<td>31.10.2023 12:04</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
5bb268b1-016e-4a8f-be98-bd83457aa6b0_3Other market information2023-10-30T09:35:08Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>30.10.2023 10:35:08</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Updated information about Kemijoki, see new UMM: https://umm.nordpoolgroup.com/#/messages/a202af07-4623-4927-8c47-e7ef46e7e007/1</td>
</tr>
<tr>
<th>Event start:</th>
<td>01.11.2023 12:30</td>
</tr>
<tr>
<th>Event stop:</th>
<td>01.11.2023 13:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated available capacity and revised HPP availability information. Kemijoki river. Installed production capacity 800 MW.
Due to maintenances in Ossauskoski HPP and Vanttauskoski HPP the available capacity is approximately 640 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
c5304f55-61b1-4f63-9afa-6bda945eab3f_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-10-26T14:51:42Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.10.2023 16:51:42</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failiure in start sequence on both G1 and G2</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Failiure in start sequence on both G1 and G2</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>130 MW</td>
<td>200 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>26.10.2023 16:40</td>
<td>26.10.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
1f2ea28e-3660-4bb2-b1e5-89ec7ab8810d_2Other market information2023-10-26T14:44:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.10.2023 16:44:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>25.10.2023 04:30</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.10.2023 16:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW.
Due to scheduled maintenances in Seitakorva HPP and Ossauskoski HPP the available capacity is approximately 620 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
c2b52170-454f-4f98-9644-c836cc6708c8_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-10-26T09:14:01Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.10.2023 11:14:01</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance on grid</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to grid maintenance, the total infeed capacity for Trängslet and Åsen hydro power stations is limited to max. 75 MW. Åsen has 29 MW installed capacity. Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>75 MW</td>
<td>255 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>25.10.2023 09:00</td>
<td>26.10.2023 11:07</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
c536eeeb-5a61-40d4-b78d-368b86bcb6b5_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-10-24T08:58:29Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.10.2023 10:58:29</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance on grid</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to grid maintenance, the total infeed capacity for Trängslet and Åsen hydro power stations is limited to max. 230 MW. Åsen has 29 MW installed capacity.
Update event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>23.10.2023 09:00</td>
<td>24.10.2023 10:50</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
c9694e77-5734-4ad3-ac3e-fc2fbcbc643a_2Other market information2023-10-19T09:14:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.10.2023 11:14:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>19.10.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>19.10.2023 11:10</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.
Vuoksi river. Installed production capacity 260 MW.
Due to diving works in Imatra HPP and maintenance in Tainionkoski HPP the available max. capacity is approximately 150 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
097902ea-c074-44a0-856b-a94fe4feaff9_1Planned, Unavailability of electricity facilities: Production, SE2, Krångede2023-10-18T12:32:52Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.10.2023 14:32:52</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Planned maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Krångede</td>
<td>46WPU0000000085B</td>
<td>SE2</td>
<td>252 MW</td>
<td>84 MW</td>
<td>168 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>24.06.2024 08:00</td>
<td>27.06.2024 15:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>126 MW</td>
<td>126 MW</td>
<td></td>
<td></td>
<td>27.06.2024 15:00</td>
<td>05.07.2024 15:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>210 MW</td>
<td>42 MW</td>
<td></td>
<td></td>
<td>05.07.2024 15:00</td>
<td>25.11.2024 08:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>126 MW</td>
<td>126 MW</td>
<td></td>
<td></td>
<td>25.11.2024 08:00</td>
<td>06.12.2024 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
efc35093-37e3-4a58-a674-312c2020905f_1Other market information2023-10-17T09:22:24Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.10.2023 11:22:24</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>29.10.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>29.10.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW.
Due to maintenance work on Russian side of the river, the available maximum capacity is approximately 90 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
4eef10d9-2bf6-4f3f-984f-cc31240f4103_1Other market information2023-10-17T09:20:04Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.10.2023 11:20:04</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>28.10.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>28.10.2023 16:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW.
Due to maintenance work on Russian side of the river, the available maximum capacity is approximately 90 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
abec38ac-787d-4d1a-a9a2-ba2d5f8643d4_2Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-10-16T15:18:17Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.10.2023 17:18:17</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure during ramp up</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>16.10.2023 15:55</td>
<td>16.10.2023 17:15</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
fadc9723-7c82-4b63-8d04-f47b6041e2db_3Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-10-16T12:47:37Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.10.2023 14:47:37</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>16.10.2023 07:30</td>
<td>16.10.2023 14:45</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
4c7d613c-7683-409e-9a71-43a44b230e77_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-10-16T04:05:05Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.10.2023 06:05:05</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Turbine tripped.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>16.10.2023 05:59</td>
<td>16.10.2023 07:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
3d494d25-d180-43cc-9d78-e02685cbc867_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-10-10T12:12:14Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>10.10.2023 14:12:14</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Tests.
The power will vary between 0-130 MW during the test period.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>10.10.2023 08:00</td>
<td>10.10.2023 14:05</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
1c82848f-3a67-4e0d-909a-bf8b530d3b34_1Unplanned, Unavailability of electricity facilities: Production, FI, Naantali - Na4CHP2023-10-09T15:16:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.10.2023 17:16:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Technical problems with turbine.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td></td>
<td></td>
<td>Biomass</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Na4CHP</td>
<td>44W-00000000009F</td>
<td></td>
<td>145 MW</td>
<td>0 MW</td>
<td>145 MW</td>
<td></td>
<td></td>
<td>09.10.2023 17:00</td>
<td>09.10.2023 21:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
23045be8-de7d-4f4e-abf6-58413939ab57_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-10-09T15:12:53Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.10.2023 17:12:53</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>09.10.2023 09:30</td>
<td>09.10.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
fade8c27-c857-4e32-a4aa-8ced2ae7b35e_3Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 1 - G112023-10-07T09:11:27Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.10.2023 11:11:27</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems on the generator side.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. After Event Stop the plant will be technically available and upon a decision to resume production. Full capacity can be reached within approx. 38
hours</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td></td>
<td></td>
<td>Nuclear</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G11</td>
<td>44W-T-YV-1000003</td>
<td></td>
<td>253 MW</td>
<td>0 MW</td>
<td>253 MW</td>
<td></td>
<td></td>
<td>01.10.2023 22:05</td>
<td>07.10.2023 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
0a8d1a64-3c6f-44f8-b505-d56035bdbb5b_1Other market information2023-10-05T11:54:56Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.10.2023 13:54:56</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>06.10.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>07.10.2023 00:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to a spot mistake approximately 230 MW PH01-06 and 160MW PH19-24 offered less then intended to the market.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
6556ba87-f66a-40f5-a11a-41182f99d75b_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2023-10-05T06:29:54Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.10.2023 08:29:54</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event start and stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>17.10.2023 07:30</td>
<td>17.10.2023 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
7f38f981-491f-4dc9-81eb-7ae284f9b56a_2Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 12023-10-05T06:28:54Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.10.2023 08:28:54</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event start and stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 1</td>
<td>44W-T-YT-100012E</td>
<td></td>
<td>75 MW</td>
<td>0 MW</td>
<td>75 MW</td>
<td></td>
<td></td>
<td>16.10.2023 07:30</td>
<td>16.10.2023 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
6a36c3e9-e7f2-4cc2-8d1d-33bccbfe2856_3Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-10-04T17:37:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.10.2023 19:37:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Electric distribution network limitation.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>04.10.2023 08:25</td>
<td>04.10.2023 19:32</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
0d191f7a-f32b-4a3b-9ac9-d42d26a5c8a9_8Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-10-01T13:29:29Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.10.2023 15:29:29</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short refuelling outage.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. After event stop the plant will be technically available and upon a decision to resume production. Full capacity can be reached within approx. 53 hours</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>09.09.2023 08:30</td>
<td>01.10.2023 16:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
8b50b92d-e4f3-4445-a310-b6c6afe89a05_3Other market information2023-09-29T16:13:40Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.09.2023 18:13:40</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>25.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>30.09.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW. Due to scheduled maintenances in Pirttikoski HPP, Vanttauskoski HPP and Ossauskoski HPP the available capacity varies between 650-700 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
b2e60268-3cf4-49d6-a939-f3dd85eea1c8_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-09-29T10:53:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.09.2023 12:53:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance on grid</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Due to grid maintenance, the total infeed capacity for Trängslet and Åsen hydro power stations is 75 MW. Åsen has 29 MW installed capacity.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>75 MW</td>
<td>255 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>12.10.2023 08:00</td>
<td>12.10.2023 16:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
0c18734c-ef0d-40c7-999a-9cb59df2ac9f_3Planned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-09-26T16:21:48Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.09.2023 18:21:48</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>26.09.2023 02:00</td>
<td>26.09.2023 18:19</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
bb1244c6-69aa-4fd1-bf1f-b7cdcc5d0706_2Other market information2023-09-26T09:37:03Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.09.2023 11:37:03</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Full stop canceled.</td>
</tr>
<tr>
<th>Event start:</th>
<td>04.10.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>05.10.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Kemijoki river. Installed production capacity 800 MW.
Due to grid work and maintenance in the Vanttauskoski HPP the available capacity is about 700 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
82973301-fc1e-4fc3-b431-4071dcc67de5_2Other market information2023-09-26T06:38:44Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.09.2023 08:38:44</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>03.10.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>03.10.2023 12:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.
Kemijoki river. Installed production capacity 800 MW.
Due to hpp tests the available capacity is about 680 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
fb91b6f5-b3f8-430b-a54a-855879b29911_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-09-24T19:55:44Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.09.2023 21:55:44</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Faliure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>24.09.2023 20:49</td>
<td>24.09.2023 21:50</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
8d08486a-4401-418b-994c-41a240c64aaf_4Other market information2023-09-21T20:50:40Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>21.09.2023 22:50:40</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>04.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>21.09.2023 22:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.
Kemijoki river. Installed production capacity 800 MW. Due to scheduled maintenances in Seitakorva HPP, Ossauskoski HPP, Pirttikoski HPP and Petäjäskoski HPP the available capacity varies between 430-605 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
95eae5bd-3cfc-4ab1-918d-8d7810f56c0f_1Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 22023-09-20T03:58:23Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>20.09.2023 05:58:23</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems with a turbine regulator.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 2</td>
<td>44W-T-YV-0000018</td>
<td>FI</td>
<td>507 MW</td>
<td>447 MW</td>
<td>60 MW</td>
<td>Nuclear</td>
<td></td>
<td>20.09.2023 05:33</td>
<td>20.09.2023 08:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
b76cb1db-c151-44a3-98e3-7fc2696e3b55_2Other market information2023-09-19T12:46:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.09.2023 14:46:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>19.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>19.09.2023 14:41</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW.
Due to diving works in Imatra HPP the available max. capacity is approximately 160 MW. Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
74a3bac0-4fd2-451d-9713-68829ad22de8_1Other market information2023-09-19T08:30:09Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.09.2023 10:30:09</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>25.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.09.2023 17:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW. Due to diving works in Imatra HPP the available max. capacity is approximately 160 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
1f12ae57-8f9d-4517-9f41-8b7420b4451a_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-09-19T08:02:11Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.09.2023 10:02:11</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short maintenance required.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Short maintenance required.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>19.09.2023 13:00</td>
<td>19.09.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
db818839-4c68-476d-9924-cd57a824a9df_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-09-19T04:06:47Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.09.2023 06:06:47</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Turbine tripped</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>19.09.2023 06:01</td>
<td>19.09.2023 07:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
15ab9e9f-e737-492d-acb7-0feff70864e4_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-09-18T23:21:45Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>19.09.2023 01:21:45</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Available to market</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>19.09.2023 00:10</td>
<td>19.09.2023 01:11</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
81e8fdb6-ba18-49e8-b92a-3ddf191da4c8_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 62023-09-17T06:17:50Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.09.2023 08:17:50</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Annual maintenance needs to be continued.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 6</td>
<td>44W-T-YT-1000158</td>
<td></td>
<td>45 MW</td>
<td>0 MW</td>
<td>45 MW</td>
<td></td>
<td></td>
<td>17.09.2023 07:43</td>
<td>18.09.2023 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
29563208-0cf2-4777-b9e5-e12c6df113d1_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2023-09-17T06:15:42Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.09.2023 08:15:42</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Annual maintenance needs to be continued.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>17.09.2023 07:43</td>
<td>18.09.2023 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
8a042f08-f75a-4875-a4f2-cd9f6e5c50e7_1Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2023-09-17T06:13:12Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>17.09.2023 08:13:12</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Annual maintenance needs to be continued.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>17.09.2023 07:43</td>
<td>18.09.2023 11:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
ae48aeeb-d200-44de-8bf1-e91cae6ff433_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-09-16T19:06:14Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>16.09.2023 21:06:14</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Machine has tripped due to high frequency.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Machine has tripped due to high frequency.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>16.09.2023 20:55</td>
<td>16.09.2023 22:55</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
6967fb8b-0ee4-40c5-8bc5-08e94453baa9_3Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 GT2023-09-14T15:48:12Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.09.2023 17:48:12</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 GT</td>
<td>44W-T-YT-100014A</td>
<td></td>
<td>170 MW</td>
<td>0 MW</td>
<td>170 MW</td>
<td></td>
<td></td>
<td>02.09.2023 07:00</td>
<td>15.09.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
6a9fed2a-d608-4c90-a8e9-19f27cbc529f_3Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 2 ST2023-09-14T15:47:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.09.2023 17:47:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 2 ST</td>
<td>44W-T-YT-100013C</td>
<td></td>
<td>64 MW</td>
<td>0 MW</td>
<td>64 MW</td>
<td></td>
<td></td>
<td>02.09.2023 07:00</td>
<td>15.09.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
4e383e89-e810-4819-b595-b968db9895c9_3Planned, Unavailability of electricity facilities: Production, FI, Suomenoja - Suomenoja 62023-09-14T15:46:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>14.09.2023 17:46:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Yearly maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja</td>
<td>44W-T-YT-000010P</td>
<td>FI</td>
<td>354 MW</td>
<td></td>
<td></td>
<td>Fossil Gas</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>Suomenoja 6</td>
<td>44W-T-YT-1000158</td>
<td></td>
<td>45 MW</td>
<td>0 MW</td>
<td>45 MW</td>
<td></td>
<td></td>
<td>02.09.2023 07:00</td>
<td>15.09.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
ae0929df-6fee-482f-b60c-953919ae6f3d_7Planned, Unavailability of electricity facilities: Production, FI, Loviisa Block 22023-09-13T11:50:22Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.09.2023 13:50:22</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short refuelling outage.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.
After event stop the plant will be technically available and upon a decision to resume production. Full capacity can be reached within approx. 42 hours</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 2</td>
<td>44W-T-YV-0000018</td>
<td>FI</td>
<td>507 MW</td>
<td>0 MW</td>
<td>507 MW</td>
<td>Nuclear</td>
<td></td>
<td>20.08.2023 04:30</td>
<td>07.09.2023 13:30</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>250 MW</td>
<td>257 MW</td>
<td></td>
<td></td>
<td>07.09.2023 13:30</td>
<td>13.09.2023 15:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
3f6cb471-6979-4800-a911-a1cde6085a10_2Other market information2023-09-11T07:41:57Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>11.09.2023 09:41:57</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Overlapping with other, prolonged maintenance work, https://umm.nordpoolgroup.com/#/messages/8d08486a-4401-418b-994c-41a240c64aaf/2</td>
</tr>
<tr>
<th>Event start:</th>
<td>19.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>21.09.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Kemijoki river. Installed production capacity 800 MW. Due to maintenance in the Pirttikoski HPP the available capacity is about 650 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
9cf4b4ed-263a-4e7d-9acc-663b09f8589a_3Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-09-08T09:18:10Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.09.2023 11:18:10</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Seawater pump trip.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>380 MW</td>
<td>127 MW</td>
<td>Nuclear</td>
<td></td>
<td>26.08.2023 21:44</td>
<td>09.09.2023 08:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
1431ce44-f416-408b-a54b-d7f0b37e6668_3Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-09-07T10:32:00Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.09.2023 12:32:00</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Due to grid work the total infeed capacity for Trängslet and Åsen hydro power stations is 85 MW. Åsen has 29 MW installed capacity.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>85 MW</td>
<td>245 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>07.09.2023 07:00</td>
<td>07.09.2023 12:28</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
05d1d072-c2a0-464b-81ef-28e33e82454b_2Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-09-05T15:24:37Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>05.09.2023 17:24:37</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Due to grid work the total infeed capacity for Trängslet and Åsen hydro power stations is 110MW. Åsen has 29 MW installed capacity.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>110 MW</td>
<td>220 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>05.09.2023 06:30</td>
<td>05.09.2023 17:21</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
96b37d13-1825-4bb1-8564-674a5c95dc8d_6Unplanned, Unavailability of electricity facilities: Production, FI, Meri-Pori2023-09-03T07:23:22Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>03.09.2023 09:23:22</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems with a coal mill.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Meri-Pori</td>
<td>44W-T-LV-000003N</td>
<td>FI</td>
<td>565 MW</td>
<td>200 MW</td>
<td>365 MW</td>
<td>Fossil HardCoal</td>
<td></td>
<td>19.08.2023 09:27</td>
<td>21.08.2023 11:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>400 MW</td>
<td>165 MW</td>
<td></td>
<td></td>
<td>21.08.2023 11:00</td>
<td>04.09.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
9a2306b5-7ae0-4fd8-aa8d-e68e626a2375_2Other market information2023-09-01T23:19:36Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.09.2023 01:19:36</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>01.09.2023 20:53</td>
</tr>
<tr>
<th>Event stop:</th>
<td>02.09.2023 03:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Kemijoki river. Installed production capacity 800 MW.
Due to scheduled maintenances in Ossauskoski HPP and Seitakorva HPP, as well as unscheduled outage in Seitakorva HPP, the available capacity is approximately 620 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
67883b6d-798e-4d9d-a664-8c4858b44cb2_3Planned, Unavailability of electricity facilities: Production, SE2, Krångede - G62023-09-01T11:56:59Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.09.2023 13:56:59</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Back in operation.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Krångede</td>
<td>46WPU0000000085B</td>
<td>SE2</td>
<td>252 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G6</td>
<td>46WGU0000000193E</td>
<td></td>
<td>42 MW</td>
<td>0 MW</td>
<td>42 MW</td>
<td></td>
<td></td>
<td>24.07.2023 08:00</td>
<td>01.09.2023 13:54</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<td>Sydkraft Hydropower AB</td>
</tr>
</table>
aaf3b482-eea9-4d52-a130-ea8f6d950e27_3Other market information2023-08-31T07:34:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>31.08.2023 09:34:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>03.07.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>31.08.2023 09:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.
Kemijoki river. Installed production capacity 800 MW.
Due to scheduled maintenances in Petäjäskoski HPP, Ossauskoski HPP and Seitakorva HPP, the available capacity varies between 510- 700 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
337641fe-6bf0-4849-9aef-8dab058db9e3_3Other market information2023-08-30T06:44:35Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>30.08.2023 08:44:35</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>28.08.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>30.08.2023 08:45</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
ab703671-7498-45bf-9d93-37cd2f04d493_3Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-08-29T16:33:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.08.2023 18:33:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Short maintance required on each generator.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Short maintance required on each generator.
Updated end time.
Work on G3 is not cancelled as was written in the last version.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>29.08.2023 15:00</td>
<td>29.08.2023 16:00</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>230 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>29.08.2023 16:00</td>
<td>29.08.2023 18:30</td>
</tr>
<tr>
<td></td>
<td></td>
<td></td>
<td></td>
<td>200 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>29.08.2023 18:30</td>
<td>29.08.2023 19:30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
b631515e-d2b5-4b5a-bd55-c461cf6ba316_3Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-08-28T09:33:10Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>28.08.2023 11:33:10</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure of capacity control</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated end time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>28.08.2023 03:45</td>
<td>28.08.2023 11:23</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
5011e2fa-13b2-47a9-924f-65bbb356f182_2Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-08-21T11:20:02Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>21.08.2023 13:20:02</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Seawater pump trip</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>380 MW</td>
<td>127 MW</td>
<td>Nuclear</td>
<td></td>
<td>20.08.2023 15:45</td>
<td>21.08.2023 13:13</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
c6f7c7cf-65a9-42ac-b650-e43c422f806f_1Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-08-18T14:16:26Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>18.08.2023 16:16:26</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Forced limitation by the local grid operator.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>18.08.2023 16:07</td>
<td>22.08.2023 05:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
8dac7c33-1b68-4cf5-b3de-8f7a9b291651_4Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-08-15T13:02:11Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.08.2023 15:02:11</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Leakage in heat exchanger.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>10.08.2023 06:50</td>
<td>16.08.2023 17:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
11be80fd-deb0-4bd0-ae50-5403e2a754f6_2Unplanned, Unavailability of electricity facilities: Production, FI, Loviisa Block 12023-08-08T07:48:08Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>08.08.2023 09:48:08</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Leakage in seawater pipeline.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Loviisa Block 1</td>
<td>44W-T-YV-000000A</td>
<td>FI</td>
<td>507 MW</td>
<td>400 MW</td>
<td>107 MW</td>
<td>Nuclear</td>
<td></td>
<td>08.08.2023 04:10</td>
<td>08.08.2023 09:40</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
9612e478-dda6-4fa1-b249-5105ad93b61a_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-08-07T11:41:05Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.08.2023 13:41:05</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Trängslet station tripped due to thunder.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Back in operation.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>0 MW</td>
<td>330 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>07.08.2023 13:03</td>
<td>07.08.2023 13:28</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
0210279f-7692-4d00-a394-4644f3f47e04_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-08-04T21:00:44Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.08.2023 23:00:44</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Vibrations</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>04.08.2023 22:52</td>
<td>05.08.2023 00:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
4a3a2489-869c-4ddf-9fd5-ac1f744bcdba_2Planned, Unavailability of electricity facilities: Production, FI, Naantali2023-08-04T10:49:23Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>04.08.2023 12:49:23</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance of common systems of the power plant.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Capacity updated. Naantali 4 (145 MW) has own UMM of yearly maintenance: https://umm.nordpoolgroup.com/#/messages/2a44b39e-3a04-4d82-8294-de6a546552b7/2</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Naantali</td>
<td>44W-T-YT-000006G</td>
<td>FI</td>
<td>250 MW</td>
<td>145 MW</td>
<td>105 MW</td>
<td>Biomass</td>
<td></td>
<td>06.08.2023 23:00</td>
<td>13.08.2023 22:59</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Oy Turku Energia-Åbo Energi Ab</td>
</tr>
<tr>
<td>Turun Seudun Energiantuotanto Oy</td>
</tr>
</table>
89d40cd3-4d1d-46ce-be84-389d4c2bc6f1_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-07-31T23:10:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>01.08.2023 01:10:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Unknown failure on G1</td>
</tr>
<tr>
<th>Remarks:</th>
<td>back in operation</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>01.08.2023 00:00</td>
<td>01.08.2023 01:08</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
90c6dc20-f10d-445b-b02e-2135c4ef5fb0_2Other market information2023-07-31T11:38:25Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>31.07.2023 13:38:25</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Maintenance and available capacity included in the following UMM:
https://umm.nordpoolgroup.com/#/messages/8d08486a-4401-418b-994c-41a240c64aaf/1</td>
</tr>
<tr>
<th>Event start:</th>
<td>06.09.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>08.09.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Kemijoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Kemijoki river. Installed production capacity 800 MW.
Due to maintenance in the Pirttikoski HPP the available capacity is about 650 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<td>Kemijoki Oy</td>
</tr>
<tr>
<td>Lapin Sähkövoima Oy</td>
</tr>
<tr>
<td>UPM Energy Oy</td>
</tr>
<tr>
<td>Helen Oy</td>
</tr>
<tr>
<td>Ounastuotanto Oy</td>
</tr>
</table>
3b27ade7-debe-40b4-a3ca-d4cab27801c9_3Other market information2023-07-31T05:38:52Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>31.07.2023 07:38:52</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>24.07.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>31.07.2023 08:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>During the mentioned period the discharge for Krångede powerplant is restricted to maximum 270 m3/s due to refurbishment. This impacts the discharge of the entire river downstreams Storsjön.
New event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
b20d4cb7-ff44-4975-9b62-8dee74503296_2Other market information2023-07-28T15:12:51Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>28.07.2023 17:12:51</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>28.07.2023 15:13</td>
</tr>
<tr>
<th>Event stop:</th>
<td>28.07.2023 17:03</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE3</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Värmland area hydro power</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Värmland area hydro power. Installed production capacity 575 MW
Available production during the event:178. MW
Net failure.
Update event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
ccab12da-3359-488b-a508-971c9222ceef_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-07-20T00:02:39Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>20.07.2023 02:02:39</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Unknown failure.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Available to market.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>20.07.2023 01:00</td>
<td>20.07.2023 02:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
6e9b62bc-ff94-4bec-9c9a-da06932dcb95_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-07-15T08:37:42Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.07.2023 10:37:42</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Confirmed failure on G1.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>15.07.2023 10:34</td>
<td>15.07.2023 11:34</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
47b3fd7f-8b9e-4acf-8bc9-1aa55a2607da_1Other market information2023-07-13T12:52:25Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.07.2023 14:52:25</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>18.07.2023 11:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>18.07.2023 14:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to maintenances in Pyhäkoski HPP and Pälli HPP the available maximum capacity is 310 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
93f61724-c37c-4ac0-81a0-f99f0f3549a8_4Unplanned, Unavailability of electricity facilities: Consumption, FI, Suomenoja 112023-07-13T10:28:49Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>13.07.2023 12:28:49</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Problems with circulation pumps.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time.</td>
</tr>
</table>
<h3>Consumption Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Suomenoja 11</td>
<td>44W-00000000023L</td>
<td>FI</td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td>10.07.2023 15:40</td>
<td>13.07.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
f2ada2af-efff-43ac-87c1-23eb16d5500d_2Other market information2023-07-12T08:33:47Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>12.07.2023 10:33:47</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>10.07.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>12.07.2023 10:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to diving works in Utanen, Pälli and Pyhäkoski the available capacity varies between 240 - 400 MW.
Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
e397f528-5edd-4622-bc33-d8e7477fa7d1_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G12023-07-06T18:15:39Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>06.07.2023 20:15:39</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G1</td>
<td>46WGU0000000002A</td>
<td></td>
<td>100 MW</td>
<td>0 MW</td>
<td>100 MW</td>
<td></td>
<td></td>
<td>06.07.2023 20:03</td>
<td>06.07.2023 21:15</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
adc8ce14-3a67-4756-ba8c-78848e7d0d75_2Other market information2023-07-06T13:35:28Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>06.07.2023 15:35:28</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>08.06.2023 06:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>06.07.2023 15:33</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Vuoksi river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Vuoksi river. Installed production capacity 260 MW.
Due to diving works and maintenances in Imatra HPP, the available capacity varies between 110 - 180 MW. Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
64576b80-9f5a-4886-8196-ca70a4d3280b_2Other market information2023-07-06T07:50:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>06.07.2023 09:50:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>26.06.2023 08:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>06.07.2023 09:43</td>
</tr>
<tr>
<th>Areas:</th>
<td>SE2</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Indalsälven river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>During the mentioned period the discharge for Krångede powerplant is restricted to maximum 270 m3/s due to refurbishment. This impacts the discharge of the entire river downstreams Storsjön.
Updated event stop time.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
5322205f-3d40-4e1b-883b-f3a3779ddb13_1Other market information2023-07-02T13:29:51Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>02.07.2023 15:29:51</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>03.07.2023 20:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>03.07.2023 23:59</td>
</tr>
<tr>
<th>Areas:</th>
<td>NO2</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Error in spot bid. Bought 100 MW too little PH21 and 90 MW too little PH22-PH24.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Hedging AS</td>
</tr>
</table>
111233f5-d4b7-420a-a74e-4c0bc2b00a1b_2Other market information2023-06-29T12:40:36Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>29.06.2023 14:40:36</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>05.06.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>29.06.2023 14:35</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated event stop time. Oulujoki river. Installed production capacity 440 MW.
Due to maintenance works in Pälli HPP and Nuojua HPP the available maximum capacity is approximately 360 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
cd17ccdb-ea2c-40a9-8429-67c0ba4c7546_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-06-26T13:01:34Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.06.2023 15:01:34</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Maintenance</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Maintenance</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>28.06.2023 08:00</td>
<td>28.06.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
fb5b769e-f90e-43b7-865e-9ef1b6ca8b8d_2Other market information2023-06-26T08:06:12Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.06.2023 10:06:12</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Dismissed</td>
</tr>
<tr>
<th>Cancellation reason:</th>
<td>Unavailability less than originally expected.</td>
</tr>
<tr>
<th>Event start:</th>
<td>10.07.2023 07:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>21.07.2023 15:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to maintenance works in Pälli HPP and Pyhäkoski HPP the available maximum capacity is approximately 345 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
88653b81-44f4-4b0f-b9a5-f11970344add_5Other market information2023-06-26T06:47:06Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.06.2023 08:47:06</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>15.05.2023 00:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>26.06.2023 08:30</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Suomenoja 11</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Updated schedule. New consumption unit: Suomenoja 11 , with 2 x 50 MW electrical heat boilers. Commissioning and test run has been completed. Commercial operation has started 26.6.2023 8.30</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
7b7b9d0b-2ec6-49e8-8706-c29773543d4d_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-06-25T23:52:07Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>26.06.2023 01:52:07</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Turbine tripped.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>26.06.2023 01:33</td>
<td>26.06.2023 03:33</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
77d7bc0e-2f83-4cc2-bcdf-c9e8a6f7f454_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-06-24T20:36:17Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.06.2023 22:36:17</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Start sequence blocked.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Confirmed start failure on G1.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>24.06.2023 22:30</td>
<td>24.06.2023 23:45</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
6a58ff4f-e55b-4555-85dd-f4c1d4ecbe66_1Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-06-24T14:13:38Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>24.06.2023 16:13:38</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Unknown failure on G1.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>24.06.2023 16:08</td>
<td>24.06.2023 18:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
df9b35e5-be42-4d3b-9e03-1d1ae0490ab7_2Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-06-22T17:25:58Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.06.2023 19:25:58</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Turbine tripped.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>New event stop time.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>22.06.2023 16:17</td>
<td>22.06.2023 20:15</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
9acaf5e3-1e67-44e1-8de8-2e52dc761ec8_3Unplanned, Unavailability of electricity facilities: Production, SE3, Trängslet - G32023-06-22T12:36:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>22.06.2023 14:36:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Unplanned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Failure</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Failure in start sequence</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Back in operation.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td></td>
<td></td>
<td>Hydro Water Reservoir</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>G3</td>
<td>46WGU00000000046</td>
<td></td>
<td>130 MW</td>
<td>0 MW</td>
<td>130 MW</td>
<td></td>
<td></td>
<td>21.06.2023 16:00</td>
<td>22.06.2023 14:33</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
33bcf104-de88-48b4-8f07-90993c0a0145_1Other market information2023-06-15T09:29:13Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>15.06.2023 11:29:13</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Power and Heat Oy</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Event start:</th>
<td>17.06.2023 02:00</td>
</tr>
<tr>
<th>Event stop:</th>
<td>17.06.2023 09:00</td>
</tr>
<tr>
<th>Areas:</th>
<td>FI</td>
</tr>
<tr>
<th>Unit name:</th>
<td>Oulujoki river</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Oulujoki river. Installed production capacity 440 MW.
Due to request by local authorities the available max. capacity is limited to 240 MW.</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Power and Heat Oy</td>
</tr>
</table>
e055e84c-3e39-4775-95c3-8bdf1f451883_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-06-09T14:11:39Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>09.06.2023 16:11:39</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Planned maintenance on G2.</td>
</tr>
<tr>
<th>Remarks:</th>
<td>Planned maintenance on G2.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>11.06.2023 12:00</td>
<td>11.06.2023 13:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>
ba9100b9-b2da-4ae5-a71f-ffc77fd435d1_1Planned, Unavailability of electricity facilities: Production, SE3, Trängslet2023-06-07T13:46:35Z2024-03-29T08:49:36Z
<table>
<tr>
<th>Published:</th>
<td>07.06.2023 15:46:35</td>
</tr>
<tr>
<th>Publisher:</th>
<td>Fortum Sverige AB</td>
</tr>
<tr>
<th>Status:</th>
<td>Active</td>
</tr>
<tr>
<th>Type of Unavailability:</th>
<td>Planned</td>
</tr>
<tr>
<th>Reason Code:</th>
<td>Foreseen maintenance</td>
</tr>
<tr>
<th>Reason for the Unavailability:</th>
<td>Planned maintenance on G2.</td>
</tr>
</table>
<h3>Production Units</h3>
<table>
<tr>
<th>Unit Name</th>
<th>Unit EIC</th>
<th>Area</th>
<th>Installed Capacity</th>
<th>Available Capacity</th>
<th>Unavailable Capacity</th>
<th>Fuel Type</th>
<th>Power Feed-In</th>
<th>From</th>
<th>To</th>
</tr>
<tr>
<td>Trängslet</td>
<td>46WPU0000000018Q</td>
<td>SE3</td>
<td>330 MW</td>
<td>230 MW</td>
<td>100 MW</td>
<td>Hydro Water Reservoir</td>
<td></td>
<td>09.06.2023 08:00</td>
<td>09.06.2023 14:00</td>
</tr>
</table>
<h3>Market participants</h3>
<table>
<tr>
<td>Fortum Sverige AB</td>
</tr>
</table>