Nord Pool UMM message RSS FeedUrgent Market Messages5a493452-e294-43fe-8be6-e7e0bde03447_4https://umm.nordpoolgroup.com/#/messages/5a493452-e294-43fe-8be6-e7e0bde03447/4Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>19.06.2019 14:53:52</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>847 MW</td> <td>153 MW</td> <td>22.06.2019 00:00</td> <td>22.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>22.06.2019 06:00</td> <td>22.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>22.06.2019 18:00</td> <td>23.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>23.06.2019 09:00</td> <td>23.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>23.06.2019 21:00</td> <td>24.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>24.06.2019 09:00</td> <td>24.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>24.06.2019 21:00</td> <td>25.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>25.06.2019 09:00</td> <td>25.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>25.06.2019 18:00</td> <td>26.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>26.06.2019 00:00</td> <td>01.07.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>01.07.2019 00:00</td> <td>06.07.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>850 MW</td> <td>29 MW</td> <td>22.06.2019 00:00</td> <td>22.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>22.06.2019 06:00</td> <td>22.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>22.06.2019 18:00</td> <td>22.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>22.06.2019 21:00</td> <td>23.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>23.06.2019 06:00</td> <td>23.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>23.06.2019 09:00</td> <td>23.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>23.06.2019 21:00</td> <td>24.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>24.06.2019 00:00</td> <td>24.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>24.06.2019 06:00</td> <td>24.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>24.06.2019 09:00</td> <td>24.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>24.06.2019 21:00</td> <td>25.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>25.06.2019 00:00</td> <td>25.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>25.06.2019 06:00</td> <td>25.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>25.06.2019 09:00</td> <td>25.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>25.06.2019 18:00</td> <td>25.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>25.06.2019 21:00</td> <td>26.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>229 MW</td> <td>26.06.2019 00:00</td> <td>06.07.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 19 Jun 2019 12:53:52 Z4f7b7e98-83ff-407b-8615-71cd17a2f3a6_6https://umm.nordpoolgroup.com/#/messages/4f7b7e98-83ff-407b-8615-71cd17a2f3a6/6Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>19.06.2019 14:52:31</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>600 MW</td> <td>400 MW</td> <td>18.06.2019 15:00</td> <td>18.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>18.06.2019 18:00</td> <td>18.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>18.06.2019 21:00</td> <td>19.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>19.06.2019 06:00</td> <td>19.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>19.06.2019 09:00</td> <td>19.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>19.06.2019 18:00</td> <td>20.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>20.06.2019 00:00</td> <td>20.06.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>20.06.2019 04:00</td> <td>20.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>20.06.2019 07:00</td> <td>20.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>20.06.2019 18:00</td> <td>21.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>21.06.2019 06:00</td> <td>21.06.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>21.06.2019 11:00</td> <td>21.06.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>21.06.2019 13:00</td> <td>21.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>21.06.2019 18:00</td> <td>22.06.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>600 MW</td> <td>279 MW</td> <td>18.06.2019 15:00</td> <td>18.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>18.06.2019 18:00</td> <td>18.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>18.06.2019 21:00</td> <td>19.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>19.06.2019 06:00</td> <td>19.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>19.06.2019 09:00</td> <td>19.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>19.06.2019 18:00</td> <td>20.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>20.06.2019 00:00</td> <td>20.06.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>20.06.2019 04:00</td> <td>20.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>20.06.2019 07:00</td> <td>20.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>20.06.2019 18:00</td> <td>21.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>21.06.2019 06:00</td> <td>21.06.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>21.06.2019 11:00</td> <td>21.06.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>21.06.2019 13:00</td> <td>21.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>21.06.2019 18:00</td> <td>22.06.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 19 Jun 2019 12:52:31 Z4e7f4d3e-fda4-4094-8d9c-f2f5705debed_8https://umm.nordpoolgroup.com/#/messages/4e7f4d3e-fda4-4094-8d9c-f2f5705debed/8Planned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>19.06.2019 12:10:45</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. HP super heater leakage in the boiler K-24.</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 14-24 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>65 MW</td> <td>127 MW</td> <td></td> <td></td> <td>06.06.2019 15:00</td> <td>11.06.2019 14:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>11.06.2019 14:00</td> <td>13.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>65 MW</td> <td>127 MW</td> <td></td> <td></td> <td>13.06.2019 18:00</td> <td>20.06.2019 15:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 19 Jun 2019 10:10:45 Z125416d8-66fe-48f4-921d-da1fa163da11_11https://umm.nordpoolgroup.com/#/messages/125416d8-66fe-48f4-921d-da1fa163da11/11Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>17.06.2019 07:44:16</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>12.06.2019 16:00</td> <td>12.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>12.06.2019 18:00</td> <td>13.06.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>13.06.2019 08:00</td> <td>13.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>13.06.2019 15:00</td> <td>13.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>13.06.2019 18:00</td> <td>14.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>14.06.2019 07:00</td> <td>14.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>14.06.2019 15:00</td> <td>14.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>14.06.2019 21:00</td> <td>15.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>15.06.2019 07:00</td> <td>15.06.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>15.06.2019 13:00</td> <td>15.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>15.06.2019 18:00</td> <td>15.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>15.06.2019 21:00</td> <td>16.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>16.06.2019 06:00</td> <td>16.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>16.06.2019 12:00</td> <td>16.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>16.06.2019 18:00</td> <td>16.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>16.06.2019 21:00</td> <td>17.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>17.06.2019 05:00</td> <td>17.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>17.06.2019 09:00</td> <td>17.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>17.06.2019 18:00</td> <td>17.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>17.06.2019 21:00</td> <td>18.06.2019 06:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>800 MW</td> <td>79 MW</td> <td>12.06.2019 16:00</td> <td>12.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>12.06.2019 18:00</td> <td>13.06.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>13.06.2019 08:00</td> <td>13.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>13.06.2019 15:00</td> <td>13.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>13.06.2019 18:00</td> <td>14.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>14.06.2019 07:00</td> <td>14.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>14.06.2019 15:00</td> <td>14.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>14.06.2019 21:00</td> <td>15.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>15.06.2019 07:00</td> <td>15.06.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>15.06.2019 13:00</td> <td>15.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>15.06.2019 18:00</td> <td>15.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>15.06.2019 21:00</td> <td>16.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>16.06.2019 06:00</td> <td>16.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>16.06.2019 12:00</td> <td>16.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>16.06.2019 18:00</td> <td>16.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>16.06.2019 21:00</td> <td>17.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>17.06.2019 00:00</td> <td>17.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>17.06.2019 05:00</td> <td>17.06.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>17.06.2019 09:00</td> <td>17.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>17.06.2019 18:00</td> <td>17.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>17.06.2019 21:00</td> <td>18.06.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 17 Jun 2019 05:44:16 Z10f1ffac-1883-4da9-a2da-10ec3ecf4c28_4https://umm.nordpoolgroup.com/#/messages/10f1ffac-1883-4da9-a2da-10ec3ecf4c28/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>16.06.2019 00:42:51</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>82 MW</td> <td>112 MW</td> <td></td> <td></td> <td>15.06.2019 19:00</td> <td>16.06.2019 00:40</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 15 Jun 2019 22:42:51 Z2bdb43d2-1910-4758-94da-9a371f783a95_2https://umm.nordpoolgroup.com/#/messages/2bdb43d2-1910-4758-94da-9a371f783a95/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.06.2019 15:09:09</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Unplanned maintenance work on the L300 line</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>550 MW</td> <td>450 MW</td> <td>18.06.2019 06:00</td> <td>18.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>18.06.2019 12:00</td> <td>18.06.2019 15:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>700 MW</td> <td>179 MW</td> <td>18.06.2019 06:00</td> <td>18.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>429 MW</td> <td>18.06.2019 12:00</td> <td>18.06.2019 15:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L300-------3</td> <td>:</td> <td>Tartu-Balti EJ</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 14 Jun 2019 13:09:09 Z29cd8650-ada0-4344-bf1d-6b0f749523fc_2https://umm.nordpoolgroup.com/#/messages/29cd8650-ada0-4344-bf1d-6b0f749523fc/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>11.06.2019 19:42:21</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Плановое событие отменено</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the boiler 6KA</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>12.06.2019 00:00</td> <td>13.06.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 11 Jun 2019 17:42:21 Zaa54b6ed-686c-4667-b432-92adc09b797f_8https://umm.nordpoolgroup.com/#/messages/aa54b6ed-686c-4667-b432-92adc09b797f/8Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>10.06.2019 14:38:17</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>10.06.2019 07:00</td> <td>10.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>10.06.2019 15:00</td> <td>10.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>10.06.2019 18:00</td> <td>10.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>797 MW</td> <td>203 MW</td> <td>10.06.2019 21:00</td> <td>11.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>11.06.2019 06:00</td> <td>11.06.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>11.06.2019 13:00</td> <td>11.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>11.06.2019 18:00</td> <td>11.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>797 MW</td> <td>203 MW</td> <td>11.06.2019 21:00</td> <td>12.06.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>12.06.2019 08:00</td> <td>12.06.2019 16:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>429 MW</td> <td>450 MW</td> <td>10.06.2019 07:00</td> <td>12.06.2019 16:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 10 Jun 2019 12:38:17 Ze3a6d4fc-67fb-4f3c-b439-798326df9648_4https://umm.nordpoolgroup.com/#/messages/e3a6d4fc-67fb-4f3c-b439-798326df9648/4Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>09.06.2019 07:52:02</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>550 MW</td> <td>450 MW</td> <td>08.06.2019 18:00</td> <td>08.06.2019 19:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>08.06.2019 19:00</td> <td>08.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>08.06.2019 21:00</td> <td>09.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>09.06.2019 15:00</td> <td>09.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>09.06.2019 18:00</td> <td>09.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>09.06.2019 21:00</td> <td>10.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>10.06.2019 00:00</td> <td>10.06.2019 03:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>10.06.2019 03:00</td> <td>10.06.2019 07:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>650 MW</td> <td>229 MW</td> <td>08.06.2019 18:00</td> <td>08.06.2019 19:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>08.06.2019 19:00</td> <td>08.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>08.06.2019 21:00</td> <td>09.06.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>09.06.2019 15:00</td> <td>09.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>09.06.2019 18:00</td> <td>09.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>09.06.2019 21:00</td> <td>10.06.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Sun, 09 Jun 2019 05:52:02 Zb8b9cc4f-a4ee-4b9b-a5d3-9cece79d0d8f_1https://umm.nordpoolgroup.com/#/messages/b8b9cc4f-a4ee-4b9b-a5d3-9cece79d0d8f/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>07.06.2019 08:10:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>94 MW</td> <td>100 MW</td> <td></td> <td></td> <td>07.06.2019 08:05</td> <td>07.06.2019 10:05</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 07 Jun 2019 06:10:15 Z9f60c7e8-dd90-4fdc-bed1-1d9ae71d2f68_2https://umm.nordpoolgroup.com/#/messages/9f60c7e8-dd90-4fdc-bed1-1d9ae71d2f68/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>06.06.2019 22:35:08</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>95 MW</td> <td>99 MW</td> <td></td> <td></td> <td>06.06.2019 19:00</td> <td>06.06.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>06.06.2019 20:00</td> <td>06.06.2019 22:18</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>95 MW</td> <td>99 MW</td> <td></td> <td></td> <td>06.06.2019 22:18</td> <td>07.06.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 06 Jun 2019 20:35:08 Z9eedd219-5bfc-4c67-ac11-ef1e2e7d1c11_5https://umm.nordpoolgroup.com/#/messages/9eedd219-5bfc-4c67-ac11-ef1e2e7d1c11/5Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>06.06.2019 22:23:15</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>04.06.2019 12:51</td> <td>06.06.2019 22:20</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>04.06.2019 12:51</td> <td>06.06.2019 22:20</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00002O</td> <td>:</td> <td>Estlink 2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> <tr> <td>Elering</td> </tr> </table> Thu, 06 Jun 2019 20:23:15 Za740dd09-c8f2-4b24-898c-05493b9b817f_7https://umm.nordpoolgroup.com/#/messages/a740dd09-c8f2-4b24-898c-05493b9b817f/7Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>06.06.2019 15:03:58</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>550 MW</td> <td>450 MW</td> <td>05.06.2019 08:00</td> <td>05.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>05.06.2019 21:00</td> <td>06.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>06.06.2019 06:00</td> <td>06.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>06.06.2019 21:00</td> <td>07.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>07.06.2019 05:00</td> <td>07.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>07.06.2019 21:00</td> <td>08.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>08.06.2019 05:00</td> <td>08.06.2019 18:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>650 MW</td> <td>229 MW</td> <td>05.06.2019 08:00</td> <td>05.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>05.06.2019 21:00</td> <td>06.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>229 MW</td> <td>06.06.2019 06:00</td> <td>06.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>06.06.2019 21:00</td> <td>07.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>229 MW</td> <td>07.06.2019 05:00</td> <td>07.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>07.06.2019 21:00</td> <td>08.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>229 MW</td> <td>08.06.2019 05:00</td> <td>08.06.2019 18:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Thu, 06 Jun 2019 13:03:58 Zcde6d926-96d5-4df5-8544-61a13fe6611d_2https://umm.nordpoolgroup.com/#/messages/cde6d926-96d5-4df5-8544-61a13fe6611d/2Other market information <table> <tr> <th>Published:</th> <td>06.06.2019 07:55:02</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Planned testing cancelled due to unplanned activation of the reserve power plant</td> </tr> <tr> <th>Event start:</th> <td>13.06.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>13.06.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 30 MW; 08:00-09:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Thu, 06 Jun 2019 05:55:02 Zdf396710-d63e-4d4f-9786-0c8325853557_2https://umm.nordpoolgroup.com/#/messages/df396710-d63e-4d4f-9786-0c8325853557/2Other market information <table> <tr> <th>Published:</th> <td>06.06.2019 07:54:34</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Planned testing cancelled due to unplanned activation of the reserve power plant</td> </tr> <tr> <th>Event start:</th> <td>12.06.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>12.06.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 1. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 26 MW; 08:00-09:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Thu, 06 Jun 2019 05:54:34 Zf637716c-733e-481c-856d-e7e2eb58b297_1https://umm.nordpoolgroup.com/#/messages/f637716c-733e-481c-856d-e7e2eb58b297/1Unplanned, Unavailability of electricity facilities: Production, EE, Kiisa emergency power plant two <table> <tr> <th>Published:</th> <td>05.06.2019 15:44:45</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance works in Kiisa EPP2</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Kiisa emergency power plant two</td> <td>38W-MT--AREJ2--A</td> <td>EE</td> <td>150 MW</td> <td>0 MW</td> <td>150 MW</td> <td>Fossil Oil</td> <td></td> <td>06.06.2019 07:00</td> <td>07.06.2019 17:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Wed, 05 Jun 2019 13:44:45 Z81aacbee-c895-4762-9d5f-cda5f874dc86_3https://umm.nordpoolgroup.com/#/messages/81aacbee-c895-4762-9d5f-cda5f874dc86/3Planned, Unavailability of electricity facilities: Production, EE, Kiisa emergency power plant two <table> <tr> <th>Published:</th> <td>05.06.2019 15:05:33</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance works in Kiisa EPP2</td> </tr> <tr> <th>Remarks:</th> <td>Updated end time of the maintenance works.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Kiisa emergency power plant two</td> <td>38W-MT--AREJ2--A</td> <td>EE</td> <td>150 MW</td> <td>0 MW</td> <td>150 MW</td> <td>Fossil Oil</td> <td></td> <td>05.06.2019 07:00</td> <td>05.06.2019 16:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Wed, 05 Jun 2019 13:05:33 Za5f575e4-0f9f-4a8f-9faa-3f8bebeab405_5https://umm.nordpoolgroup.com/#/messages/a5f575e4-0f9f-4a8f-9faa-3f8bebeab405/5Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>04.06.2019 22:55:55</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the boiler 24</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>60 MW</td> <td>132 MW</td> <td></td> <td></td> <td>04.06.2019 07:30</td> <td>05.06.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 04 Jun 2019 20:55:55 Z9177717e-64f5-4580-8cf6-3c8fd51a6a3d_7https://umm.nordpoolgroup.com/#/messages/9177717e-64f5-4580-8cf6-3c8fd51a6a3d/7Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>04.06.2019 15:32:30</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>850 MW</td> <td>150 MW</td> <td>03.06.2019 19:00</td> <td>04.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>04.06.2019 05:00</td> <td>04.06.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>04.06.2019 08:00</td> <td>04.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>04.06.2019 18:00</td> <td>05.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>05.06.2019 00:00</td> <td>05.06.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>05.06.2019 04:00</td> <td>05.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>05.06.2019 07:00</td> <td>05.06.2019 08:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>03.06.2019 19:00</td> <td>04.06.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>04.06.2019 05:00</td> <td>04.06.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>04.06.2019 08:00</td> <td>04.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>04.06.2019 18:00</td> <td>05.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>05.06.2019 00:00</td> <td>05.06.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>05.06.2019 04:00</td> <td>05.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>05.06.2019 07:00</td> <td>05.06.2019 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Tue, 04 Jun 2019 13:32:30 Zab8cb864-a344-434d-a008-0759eaf3a673_2https://umm.nordpoolgroup.com/#/messages/ab8cb864-a344-434d-a008-0759eaf3a673/2Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>03.06.2019 18:44:02</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance of the unit. .</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>60 MW</td> <td>132 MW</td> <td></td> <td></td> <td>03.06.2019 07:30</td> <td>03.06.2019 18:35</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 03 Jun 2019 16:44:02 Zef32dabb-f0c4-45bf-88b2-4a4cbc62b404_1https://umm.nordpoolgroup.com/#/messages/ef32dabb-f0c4-45bf-88b2-4a4cbc62b404/1Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>02.06.2019 21:21:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Reason unknown. Растопка К-23</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>02.06.2019 23:00</td> <td>03.06.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 02 Jun 2019 19:21:48 Za09ca8f9-9e08-4edd-b9dc-a69e0bfa0540_22https://umm.nordpoolgroup.com/#/messages/a09ca8f9-9e08-4edd-b9dc-a69e0bfa0540/22Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>02.06.2019 14:10:30</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>550 MW</td> <td>450 MW</td> <td>20.05.2019 05:00</td> <td>20.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>20.05.2019 06:00</td> <td>20.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>400 MW</td> <td>600 MW</td> <td>20.05.2019 08:00</td> <td>20.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>20.05.2019 18:00</td> <td>21.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>21.05.2019 00:00</td> <td>21.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>21.05.2019 05:00</td> <td>21.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>400 MW</td> <td>600 MW</td> <td>21.05.2019 09:00</td> <td>21.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>21.05.2019 18:00</td> <td>22.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>22.05.2019 00:00</td> <td>22.05.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>22.05.2019 04:00</td> <td>22.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>400 MW</td> <td>600 MW</td> <td>22.05.2019 07:00</td> <td>22.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>22.05.2019 18:00</td> <td>22.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>22.05.2019 21:00</td> <td>23.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>23.05.2019 06:00</td> <td>23.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>23.05.2019 21:00</td> <td>24.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>24.05.2019 00:00</td> <td>24.05.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>24.05.2019 04:00</td> <td>24.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>24.05.2019 09:00</td> <td>24.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>24.05.2019 18:00</td> <td>25.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>25.05.2019 00:00</td> <td>25.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>25.05.2019 05:00</td> <td>25.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>25.05.2019 18:00</td> <td>26.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>26.05.2019 07:00</td> <td>26.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>26.05.2019 08:00</td> <td>26.05.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>26.05.2019 11:00</td> <td>26.05.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>26.05.2019 15:00</td> <td>27.05.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>27.05.2019 11:00</td> <td>27.05.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>27.05.2019 13:00</td> <td>27.05.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>27.05.2019 15:00</td> <td>27.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>27.05.2019 18:00</td> <td>28.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>28.05.2019 06:00</td> <td>28.05.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>28.05.2019 12:00</td> <td>28.05.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>28.05.2019 15:00</td> <td>29.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>29.05.2019 21:00</td> <td>30.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>30.05.2019 08:00</td> <td>30.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>30.05.2019 21:00</td> <td>31.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>31.05.2019 00:00</td> <td>31.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>31.05.2019 07:00</td> <td>31.05.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>31.05.2019 12:00</td> <td>31.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>31.05.2019 21:00</td> <td>01.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>01.06.2019 00:00</td> <td>01.06.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>01.06.2019 06:00</td> <td>01.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>01.06.2019 12:00</td> <td>01.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>01.06.2019 18:00</td> <td>02.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>02.06.2019 00:00</td> <td>02.06.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>02.06.2019 02:00</td> <td>02.06.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>647 MW</td> <td>353 MW</td> <td>02.06.2019 21:00</td> <td>03.06.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>03.06.2019 00:00</td> <td>03.06.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>03.06.2019 07:00</td> <td>03.06.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>550 MW</td> <td>03.06.2019 12:00</td> <td>03.06.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>03.06.2019 18:00</td> <td>03.06.2019 19:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>529 MW</td> <td>350 MW</td> <td>20.05.2019 05:00</td> <td>20.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>350 MW</td> <td>529 MW</td> <td>20.05.2019 08:00</td> <td>20.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>350 MW</td> <td>20.05.2019 18:00</td> <td>21.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>350 MW</td> <td>529 MW</td> <td>21.05.2019 09:00</td> <td>21.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>350 MW</td> <td>21.05.2019 18:00</td> <td>22.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>350 MW</td> <td>529 MW</td> <td>22.05.2019 07:00</td> <td>22.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>350 MW</td> <td>22.05.2019 18:00</td> <td>26.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>500 MW</td> <td>379 MW</td> <td>26.05.2019 08:00</td> <td>26.05.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>350 MW</td> <td>26.05.2019 11:00</td> <td>03.06.2019 19:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L353-------0</td> <td>:</td> <td>Tsirguliina-Viru</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Sun, 02 Jun 2019 12:10:30 Z6db316be-26e5-4817-8e0d-f24ce6870cbe_10https://umm.nordpoolgroup.com/#/messages/6db316be-26e5-4817-8e0d-f24ce6870cbe/10Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>31.05.2019 14:39:21</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure of the turbine bearing. Leakage in the boiler K-24 secondary superheater.</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 24-36 hours..</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>17.05.2019 23:00</td> <td>20.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>80 MW</td> <td>112 MW</td> <td></td> <td></td> <td>20.05.2019 09:00</td> <td>24.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>24.05.2019 20:00</td> <td>31.05.2019 15:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 31 May 2019 12:39:21 Z55bc1769-189b-4153-9a4c-f8655b788dc9_2https://umm.nordpoolgroup.com/#/messages/55bc1769-189b-4153-9a4c-f8655b788dc9/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>31.05.2019 10:14:12</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 7K-B primary superheater</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>62 MW</td> <td>101 MW</td> <td></td> <td></td> <td>28.05.2019 02:35</td> <td>31.05.2019 10:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 31 May 2019 08:14:12 Zfb64d31d-bba1-4f21-9834-0e1e4e608d97_4https://umm.nordpoolgroup.com/#/messages/fb64d31d-bba1-4f21-9834-0e1e4e608d97/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>30.05.2019 10:41:01</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 6K-B and 6K-A in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>50 MW</td> <td>123 MW</td> <td></td> <td></td> <td>30.05.2019 08:00</td> <td>01.06.2019 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 30 May 2019 08:41:01 Z3ed09488-7cbe-41ec-8390-6658a3858020_4https://umm.nordpoolgroup.com/#/messages/3ed09488-7cbe-41ec-8390-6658a3858020/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>30.05.2019 04:52:38</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>29.05.2019 16:00</td> <td>30.05.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>60 MW</td> <td>134 MW</td> <td></td> <td></td> <td>30.05.2019 02:00</td> <td>30.05.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 30 May 2019 02:52:38 Z9e6869d7-dd6e-4a17-a973-c4e6f02ef2aa_3https://umm.nordpoolgroup.com/#/messages/9e6869d7-dd6e-4a17-a973-c4e6f02ef2aa/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>29.05.2019 21:19:19</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Short-term unit run for station HP stream supply security reasons.According to the decision of the management board of Eesti Energia the production asset is mothballed due to market conditions.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.04.2019 23:00</td> <td>29.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>36 MW</td> <td>127 MW</td> <td></td> <td></td> <td>29.05.2019 20:00</td> <td>31.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>31.05.2019 00:00</td> <td>31.12.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 29 May 2019 19:19:19 Z7bfc3ee8-6843-4aaa-9ea2-24839cebbd76_2https://umm.nordpoolgroup.com/#/messages/7bfc3ee8-6843-4aaa-9ea2-24839cebbd76/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>29.05.2019 08:06:03</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 6K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>55 MW</td> <td>118 MW</td> <td></td> <td></td> <td>30.05.2019 16:00</td> <td>31.05.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 29 May 2019 06:06:03 Za06224ca-bf11-49b4-9522-8c6ea50ad030_3https://umm.nordpoolgroup.com/#/messages/a06224ca-bf11-49b4-9522-8c6ea50ad030/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>29.05.2019 07:59:09</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 6K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>50 MW</td> <td>123 MW</td> <td></td> <td></td> <td>29.05.2019 17:00</td> <td>30.05.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 29 May 2019 05:59:09 Z8eb98ea6-87e5-4cfb-bb4a-c7ea27be0aa2_7https://umm.nordpoolgroup.com/#/messages/8eb98ea6-87e5-4cfb-bb4a-c7ea27be0aa2/7Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>28.05.2019 11:41:29</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler K-AEJ primary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>13.05.2019 13:58</td> <td>13.05.2019 17:26</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>13.05.2019 17:26</td> <td>13.05.2019 17:47</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>13.05.2019 17:47</td> <td>25.06.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 28 May 2019 09:41:29 Z00c07749-1202-4010-9dca-d7fb4169d563_5https://umm.nordpoolgroup.com/#/messages/00c07749-1202-4010-9dca-d7fb4169d563/5Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>28.05.2019 07:22:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>27.05.2019 20:00</td> <td>28.05.2019 05:30</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>60 MW</td> <td>134 MW</td> <td></td> <td></td> <td>28.05.2019 05:30</td> <td>28.05.2019 11:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 28 May 2019 05:22:48 Z78521e43-7aee-419e-a770-a7e36628cf6a_2https://umm.nordpoolgroup.com/#/messages/78521e43-7aee-419e-a770-a7e36628cf6a/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>24.05.2019 10:45:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 6K-A and 6K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>25.05.2019 00:00</td> <td>27.05.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 24 May 2019 08:45:17 Z7b4de7eb-a04b-457b-bcc3-ded438f18d15_4https://umm.nordpoolgroup.com/#/messages/7b4de7eb-a04b-457b-bcc3-ded438f18d15/4Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>23.05.2019 08:59:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine. Leakage in the boiler 7K-B primary superheater.</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 12 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>62 MW</td> <td>101 MW</td> <td></td> <td></td> <td>15.05.2019 15:55</td> <td>16.05.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>16.05.2019 11:00</td> <td>23.05.2019 08:10</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 23 May 2019 06:59:46 Zafe462e4-ac98-44c3-a380-33d82c998d33_1https://umm.nordpoolgroup.com/#/messages/afe462e4-ac98-44c3-a380-33d82c998d33/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>23.05.2019 08:38:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>70 MW</td> <td>124 MW</td> <td></td> <td></td> <td>24.05.2019 14:00</td> <td>24.05.2019 18:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 23 May 2019 06:38:37 Zba936ef9-7d4f-425c-8675-5b8cf417f75c_2https://umm.nordpoolgroup.com/#/messages/ba936ef9-7d4f-425c-8675-5b8cf417f75c/2Planned, Unavailability of electricity facilities: Production, EE, Kiisa emergency power plant <table> <tr> <th>Published:</th> <td>21.05.2019 07:32:34</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Planned maintenance works in Kiisa EPP</td> </tr> <tr> <th>Remarks:</th> <td>Updated available capacity amount</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Kiisa emergency power plant</td> <td>38W-MT--AREJ---M</td> <td>EE</td> <td>120 MW</td> <td>60 MW</td> <td>60 MW</td> <td>Fossil Oil</td> <td></td> <td>04.06.2019 07:00</td> <td>04.06.2019 17:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 21 May 2019 05:32:34 Z72535773-ab6f-490b-83bc-03a7e6af8464_2https://umm.nordpoolgroup.com/#/messages/72535773-ab6f-490b-83bc-03a7e6af8464/2Planned, Unavailability of electricity facilities: Production, EE, Kiisa emergency power plant <table> <tr> <th>Published:</th> <td>21.05.2019 07:31:10</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Planned maintenance works in the Kiisa EPP</td> </tr> <tr> <th>Remarks:</th> <td>Updated available capacity amount</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Kiisa emergency power plant</td> <td>38W-MT--AREJ---M</td> <td>EE</td> <td>120 MW</td> <td>60 MW</td> <td>60 MW</td> <td>Fossil Oil</td> <td></td> <td>03.06.2019 07:00</td> <td>03.06.2019 17:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 21 May 2019 05:31:10 Zb3a2ab8b-5f79-4449-8f20-e8e8da76c87c_3https://umm.nordpoolgroup.com/#/messages/b3a2ab8b-5f79-4449-8f20-e8e8da76c87c/3Other market information <table> <tr> <th>Published:</th> <td>19.05.2019 01:34:40</td> </tr> <tr> <th>Publisher:</th> <td>LITGRID AB</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>18.05.2019 11:00</td> </tr> <tr> <th>Event stop:</th> <td>19.05.2019 01:35</td> </tr> <tr> <th>Areas:</th> <td>EE, LT, LV, PL, SE4</td> </tr> <tr> <th>Remarks:</th> <td>In order to ensure reliable operation of the Lithuanian power system in emergency situations and in relation to the Kaliningrad system isolated test, LITGRID is planning to perform a test of the system restoration plan and to test part of Lithuania power system operation in isolated mode. Related UMMs: https://umm.nordpoolgroup.com/#/messages/b9d42ae1-2143-43cd-8a94-e90cc4464353/1 https://umm.nordpoolgroup.com/#/messages/b70a632a-af5b-47dc-83d8-054e5630a1c1/2</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-LT-PL-000037</td> <td>:</td> <td>Alytus-Elk(LitPol Link)</td> </tr> <tr> <td>10T-LT-SE-000013</td> <td>:</td> <td>Klaipeda-Nybro (NordBalt)</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> <tr> <td>LITGRID, AB</td> </tr> <tr> <td>Aff&#228;rsverket svenska kraftn&#228;t</td> </tr> <tr> <td>Polskie Sieci Elektroenergetyczne Sp&#243;łka Akcyjna</td> </tr> </table> Sat, 18 May 2019 23:34:40 Za83b3468-d6f9-4c57-9e87-dbe9bbfd5eb1_1https://umm.nordpoolgroup.com/#/messages/a83b3468-d6f9-4c57-9e87-dbe9bbfd5eb1/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>18.05.2019 19:51:01</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Forced isolation from grid</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>18.05.2019 19:49</td> <td>18.05.2019 21:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 18 May 2019 17:51:01 Z9ca8eaa4-c22d-4992-847f-e4e17609352e_9https://umm.nordpoolgroup.com/#/messages/9ca8eaa4-c22d-4992-847f-e4e17609352e/9Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>17.05.2019 15:41:42</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>800 MW</td> <td>200 MW</td> <td>15.05.2019 16:00</td> <td>15.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>15.05.2019 18:00</td> <td>16.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>16.05.2019 09:00</td> <td>16.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>16.05.2019 18:00</td> <td>17.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>17.05.2019 09:00</td> <td>17.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>17.05.2019 21:00</td> <td>18.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>18.05.2019 00:00</td> <td>18.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>18.05.2019 06:00</td> <td>18.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>18.05.2019 08:00</td> <td>18.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>18.05.2019 18:00</td> <td>18.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>18.05.2019 21:00</td> <td>19.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>150 MW</td> <td>19.05.2019 05:00</td> <td>19.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>697 MW</td> <td>303 MW</td> <td>19.05.2019 07:00</td> <td>19.05.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>19.05.2019 12:00</td> <td>19.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>697 MW</td> <td>303 MW</td> <td>19.05.2019 18:00</td> <td>20.05.2019 05:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>15.05.2019 16:00</td> <td>18.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>18.05.2019 08:00</td> <td>18.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>18.05.2019 18:00</td> <td>19.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>350 MW</td> <td>19.05.2019 07:00</td> <td>20.05.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 17 May 2019 13:41:42 Z9eabd39e-61e7-45e9-9ea7-1404f74d18b1_4https://umm.nordpoolgroup.com/#/messages/9eabd39e-61e7-45e9-9ea7-1404f74d18b1/4Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>15.05.2019 21:27:52</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>15.05.2019 00:31</td> <td>15.05.2019 21:15</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>144 MW</td> <td></td> <td></td> <td>15.05.2019 21:15</td> <td>16.05.2019 03:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 15 May 2019 19:27:52 Z35740e1c-254f-481a-9056-4068f6aeecda_2https://umm.nordpoolgroup.com/#/messages/35740e1c-254f-481a-9056-4068f6aeecda/2Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>15.05.2019 17:43:11</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink1 Failure</td> </tr> <tr> <th>Remarks:</th> <td>Back in operation</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>15.05.2019 15:04</td> <td>15.05.2019 17:37</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>15.05.2019 15:04</td> <td>15.05.2019 17:37</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00001Q</td> <td>:</td> <td>Estlink</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> </table> Wed, 15 May 2019 15:43:11 Zd6a24e5d-f949-4cc4-bd18-437965d88010_3https://umm.nordpoolgroup.com/#/messages/d6a24e5d-f949-4cc4-bd18-437965d88010/3Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>15.05.2019 08:46:01</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Outage is covered by other UMM which was postponed</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outages in Latvian and Russian grid.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>31.05.2019 00:00</td> <td>03.06.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>700 MW</td> <td>179 MW</td> <td>31.05.2019 00:00</td> <td>03.06.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 15 May 2019 06:46:01 Z1ed74740-3d37-4382-9f8a-0b78ac582dff_12https://umm.nordpoolgroup.com/#/messages/1ed74740-3d37-4382-9f8a-0b78ac582dff/12Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.05.2019 15:15:24</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated capacity limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>08.05.2019 00:00</td> <td>08.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>08.05.2019 06:00</td> <td>08.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>08.05.2019 07:00</td> <td>08.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>08.05.2019 20:00</td> <td>08.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>08.05.2019 21:00</td> <td>09.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>09.05.2019 05:00</td> <td>09.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>09.05.2019 07:00</td> <td>09.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>09.05.2019 09:00</td> <td>09.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>09.05.2019 21:00</td> <td>10.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>10.05.2019 00:00</td> <td>10.05.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>10.05.2019 09:00</td> <td>10.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>10.05.2019 21:00</td> <td>11.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>11.05.2019 00:00</td> <td>11.05.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>11.05.2019 06:00</td> <td>11.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>11.05.2019 21:00</td> <td>12.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>12.05.2019 07:00</td> <td>12.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>12.05.2019 08:00</td> <td>12.05.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>12.05.2019 13:00</td> <td>12.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>12.05.2019 18:00</td> <td>12.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>12.05.2019 21:00</td> <td>13.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>13.05.2019 07:00</td> <td>13.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>13.05.2019 18:00</td> <td>13.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>13.05.2019 21:00</td> <td>14.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>14.05.2019 07:00</td> <td>14.05.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>14.05.2019 13:00</td> <td>14.05.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>14.05.2019 15:00</td> <td>14.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>14.05.2019 21:00</td> <td>15.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>15.05.2019 00:00</td> <td>15.05.2019 08:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>08.05.2019 00:00</td> <td>12.05.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>12.05.2019 13:00</td> <td>12.05.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>12.05.2019 18:00</td> <td>15.05.2019 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Tue, 14 May 2019 13:15:24 Zcb202140-c58e-4b0f-8570-c41611670fc6_5https://umm.nordpoolgroup.com/#/messages/cb202140-c58e-4b0f-8570-c41611670fc6/5Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>13.05.2019 15:02:30</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage on Estonian - Russian tie-line</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>897 MW</td> <td>103 MW</td> <td>15.05.2019 08:00</td> <td>15.05.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>15.05.2019 11:00</td> <td>15.05.2019 16:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>15.05.2019 08:00</td> <td>15.05.2019 16:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-EE-RU-00001M</td> <td>:</td> <td>Tartu-Pihkva (RU)</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 13 May 2019 13:02:30 Z6cb3b646-10fd-4239-add3-f0e4e43d3daa_4https://umm.nordpoolgroup.com/#/messages/6cb3b646-10fd-4239-add3-f0e4e43d3daa/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>11.05.2019 14:51:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the turbine armature</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8-12 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>10.05.2019 00:00</td> <td>11.05.2019 14:50</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 11 May 2019 12:51:48 Zb23ead34-0883-4fc4-9ee8-f8f32ddd784f_2https://umm.nordpoolgroup.com/#/messages/b23ead34-0883-4fc4-9ee8-f8f32ddd784f/2Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>07.05.2019 11:47:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler K-Auvere trip</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>07.05.2019 09:22</td> <td>07.05.2019 12:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 07 May 2019 09:47:37 Z1de95617-c60c-49b6-822d-91e8372b093a_5https://umm.nordpoolgroup.com/#/messages/1de95617-c60c-49b6-822d-91e8372b093a/5Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>07.05.2019 04:48:41</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of secondary system of unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>05.05.2019 23:00</td> <td>07.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>2 MW</td> <td>192 MW</td> <td></td> <td></td> <td>07.05.2019 00:00</td> <td>07.05.2019 01:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>32 MW</td> <td>162 MW</td> <td></td> <td></td> <td>07.05.2019 01:00</td> <td>07.05.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>62 MW</td> <td>132 MW</td> <td></td> <td></td> <td>07.05.2019 02:00</td> <td>07.05.2019 04:50</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 07 May 2019 02:48:41 Z2f080d92-cfeb-4be6-8397-992a796dd664_1https://umm.nordpoolgroup.com/#/messages/2f080d92-cfeb-4be6-8397-992a796dd664/1Planned, Unavailability of electricity facilities: Transmission, EE → FI, FI → EE <table> <tr> <th>Published:</th> <td>06.05.2019 12:59:55</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink 1 capacity is limited due to control system tests</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>16.06.2019 15:00</td> <td>16.06.2019 19:00</td> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>16.06.2019 15:00</td> <td>16.06.2019 19:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00001Q</td> <td>:</td> <td>Estlink</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Fingrid Oyj</td> </tr> </table> Mon, 06 May 2019 10:59:55 Zfa6c965a-d4a3-4ae5-92fd-9f959de58d7a_3https://umm.nordpoolgroup.com/#/messages/fa6c965a-d4a3-4ae5-92fd-9f959de58d7a/3Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>06.05.2019 12:04:43</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage on Russian grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>897 MW</td> <td>103 MW</td> <td>06.05.2019 00:00</td> <td>06.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>06.05.2019 20:00</td> <td>07.05.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>06.05.2019 00:00</td> <td>07.05.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 06 May 2019 10:04:43 Zc53e5853-75d8-4cad-b81b-13dff91f2b74_1https://umm.nordpoolgroup.com/#/messages/c53e5853-75d8-4cad-b81b-13dff91f2b74/1Unplanned, Unavailability of electricity facilities: Transmission, EE → FI <table> <tr> <th>Published:</th> <td>06.05.2019 09:44:11</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Tests on line L351</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>1016 MW</td> <td>0 MW</td> <td>07.05.2019 00:00</td> <td>07.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>958 MW</td> <td>58 MW</td> <td>07.05.2019 05:00</td> <td>07.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>1016 MW</td> <td>0 MW</td> <td>07.05.2019 21:00</td> <td>08.05.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L351-------I</td> <td>:</td> <td>Balti EJ-Viru</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Mon, 06 May 2019 07:44:11 Z92a052a2-9383-44d7-a493-0f9ef343df3a_5https://umm.nordpoolgroup.com/#/messages/92a052a2-9383-44d7-a493-0f9ef343df3a/5Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>05.05.2019 22:00:30</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakage in the boiler secondary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>27.04.2019 00:00</td> <td>05.05.2019 19:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>229 MW</td> <td></td> <td></td> <td>05.05.2019 19:00</td> <td>05.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>05.05.2019 20:00</td> <td>05.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>145 MW</td> <td>129 MW</td> <td></td> <td></td> <td>05.05.2019 21:00</td> <td>05.05.2019 22:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>240 MW</td> <td>34 MW</td> <td></td> <td></td> <td>05.05.2019 22:00</td> <td>05.05.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 05 May 2019 20:00:30 Z681bb0b5-8d62-492a-b7eb-23cb67d0d22a_2https://umm.nordpoolgroup.com/#/messages/681bb0b5-8d62-492a-b7eb-23cb67d0d22a/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>05.05.2019 15:04:36</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage on Estonian 330 kV line</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>07.05.2019 00:00</td> <td>07.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>07.05.2019 05:00</td> <td>07.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>07.05.2019 07:00</td> <td>07.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>07.05.2019 20:00</td> <td>07.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>07.05.2019 21:00</td> <td>08.05.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>850 MW</td> <td>29 MW</td> <td>07.05.2019 00:00</td> <td>08.05.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L351-------I</td> <td>:</td> <td>Balti EJ-Viru</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Sun, 05 May 2019 13:04:36 Z952bf6df-80d0-4501-a03f-96636c129367_3https://umm.nordpoolgroup.com/#/messages/952bf6df-80d0-4501-a03f-96636c129367/3Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>04.05.2019 14:58:42</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>647 MW</td> <td>353 MW</td> <td>04.05.2019 13:00</td> <td>04.05.2019 14:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>04.05.2019 14:00</td> <td>04.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>04.05.2019 20:00</td> <td>04.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>04.05.2019 21:00</td> <td>05.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>05.05.2019 00:00</td> <td>06.05.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>579 MW</td> <td>300 MW</td> <td>04.05.2019 13:00</td> <td>04.05.2019 14:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>04.05.2019 14:00</td> <td>06.05.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Sat, 04 May 2019 12:58:42 Z7159b3cb-de61-4ece-b60a-ded5e6f62324_2https://umm.nordpoolgroup.com/#/messages/7159b3cb-de61-4ece-b60a-ded5e6f62324/2Unplanned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>03.05.2019 15:06:26</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Unplanned maintenance needed on Estonian transmission line due to a failure</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>647 MW</td> <td>353 MW</td> <td>04.05.2019 08:00</td> <td>04.05.2019 13:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>579 MW</td> <td>300 MW</td> <td>04.05.2019 08:00</td> <td>04.05.2019 13:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L300-------3</td> <td>:</td> <td>Tartu-Balti EJ</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 03 May 2019 13:06:26 Z03056a96-e0a9-481c-909f-ed9523353869_16https://umm.nordpoolgroup.com/#/messages/03056a96-e0a9-481c-909f-ed9523353869/16Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>03.05.2019 15:02:24</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>900 MW</td> <td>100 MW</td> <td>26.04.2019 00:00</td> <td>26.04.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>26.04.2019 05:00</td> <td>26.04.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>26.04.2019 09:00</td> <td>26.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>26.04.2019 18:00</td> <td>27.04.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>27.04.2019 00:00</td> <td>27.04.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>27.04.2019 05:00</td> <td>27.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>27.04.2019 08:00</td> <td>27.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>27.04.2019 18:00</td> <td>27.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>27.04.2019 21:00</td> <td>28.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>28.04.2019 10:00</td> <td>28.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>28.04.2019 18:00</td> <td>29.04.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>29.04.2019 00:00</td> <td>29.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>29.04.2019 06:00</td> <td>29.04.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>29.04.2019 12:00</td> <td>29.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>29.04.2019 18:00</td> <td>29.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>29.04.2019 21:00</td> <td>30.04.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>30.04.2019 00:00</td> <td>30.04.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>30.04.2019 05:00</td> <td>30.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>30.04.2019 06:00</td> <td>30.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>30.04.2019 10:00</td> <td>30.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>30.04.2019 18:00</td> <td>30.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>30.04.2019 21:00</td> <td>01.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>01.05.2019 00:00</td> <td>01.05.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>01.05.2019 05:00</td> <td>01.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>01.05.2019 07:00</td> <td>01.05.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>200 MW</td> <td>01.05.2019 08:00</td> <td>01.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>01.05.2019 21:00</td> <td>02.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>02.05.2019 07:00</td> <td>02.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>02.05.2019 20:00</td> <td>02.05.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>02.05.2019 21:00</td> <td>03.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>897 MW</td> <td>103 MW</td> <td>03.05.2019 07:00</td> <td>03.05.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>03.05.2019 20:00</td> <td>04.05.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>900 MW</td> <td>100 MW</td> <td>04.05.2019 07:00</td> <td>04.05.2019 08:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>26.04.2019 00:00</td> <td>26.04.2019 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>26.04.2019 09:00</td> <td>26.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>26.04.2019 18:00</td> <td>27.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>800 MW</td> <td>79 MW</td> <td>27.04.2019 08:00</td> <td>27.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>27.04.2019 18:00</td> <td>04.05.2019 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 03 May 2019 13:02:24 Z0b9ccce3-ef3c-490f-beaa-95f189edc5f6_1https://umm.nordpoolgroup.com/#/messages/0b9ccce3-ef3c-490f-beaa-95f189edc5f6/1Other market information <table> <tr> <th>Published:</th> <td>29.04.2019 10:11:18</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>08.05.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>08.05.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 30 MW; 08:00-09:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Mon, 29 Apr 2019 08:11:18 Zff5aaf81-3cb6-4fb7-9707-be209ca9861f_1https://umm.nordpoolgroup.com/#/messages/ff5aaf81-3cb6-4fb7-9707-be209ca9861f/1Other market information <table> <tr> <th>Published:</th> <td>29.04.2019 10:11:16</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>07.05.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>07.05.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 26 MW; 08:00-09:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Mon, 29 Apr 2019 08:11:16 Z7d0fb129-e962-41df-bae0-78554c2fae32_16https://umm.nordpoolgroup.com/#/messages/7d0fb129-e962-41df-bae0-78554c2fae32/16Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>25.04.2019 21:29:58</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>15.04.2019 00:00</td> <td>15.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>15.04.2019 08:00</td> <td>15.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>15.04.2019 18:00</td> <td>16.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>16.04.2019 07:00</td> <td>16.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>16.04.2019 21:00</td> <td>17.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>17.04.2019 07:00</td> <td>17.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>17.04.2019 21:00</td> <td>18.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>18.04.2019 06:00</td> <td>18.04.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>18.04.2019 11:00</td> <td>18.04.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>18.04.2019 13:00</td> <td>18.04.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>18.04.2019 15:00</td> <td>18.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>18.04.2019 18:00</td> <td>18.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>18.04.2019 21:00</td> <td>19.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>19.04.2019 06:00</td> <td>19.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>19.04.2019 10:00</td> <td>19.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>19.04.2019 18:00</td> <td>20.04.2019 03:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>20.04.2019 03:00</td> <td>20.04.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>20.04.2019 04:00</td> <td>20.04.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>20.04.2019 12:00</td> <td>20.04.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>20.04.2019 15:00</td> <td>21.04.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>21.04.2019 00:00</td> <td>21.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>21.04.2019 06:00</td> <td>21.04.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>21.04.2019 12:00</td> <td>21.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>21.04.2019 18:00</td> <td>22.04.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>22.04.2019 00:00</td> <td>22.04.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>22.04.2019 05:00</td> <td>22.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>22.04.2019 08:00</td> <td>22.04.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>500 MW</td> <td>500 MW</td> <td>22.04.2019 11:00</td> <td>22.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>22.04.2019 18:00</td> <td>22.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>22.04.2019 21:00</td> <td>23.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>23.04.2019 07:00</td> <td>23.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>500 MW</td> <td>500 MW</td> <td>23.04.2019 10:00</td> <td>23.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>23.04.2019 18:00</td> <td>23.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>23.04.2019 21:00</td> <td>24.04.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>747 MW</td> <td>253 MW</td> <td>24.04.2019 02:00</td> <td>24.04.2019 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>24.04.2019 04:00</td> <td>24.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>24.04.2019 06:00</td> <td>24.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>500 MW</td> <td>500 MW</td> <td>24.04.2019 08:00</td> <td>24.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>24.04.2019 18:00</td> <td>24.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>24.04.2019 21:00</td> <td>25.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>25.04.2019 06:00</td> <td>25.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>500 MW</td> <td>500 MW</td> <td>25.04.2019 08:00</td> <td>25.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>550 MW</td> <td>450 MW</td> <td>25.04.2019 18:00</td> <td>25.04.2019 21:35</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>15.04.2019 00:00</td> <td>18.04.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>18.04.2019 11:00</td> <td>18.04.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>18.04.2019 13:00</td> <td>18.04.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>18.04.2019 15:00</td> <td>18.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>18.04.2019 18:00</td> <td>19.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>19.04.2019 10:00</td> <td>19.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>19.04.2019 18:00</td> <td>20.04.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>20.04.2019 12:00</td> <td>20.04.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>20.04.2019 15:00</td> <td>21.04.2019 12:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>21.04.2019 12:00</td> <td>21.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>21.04.2019 18:00</td> <td>22.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>22.04.2019 08:00</td> <td>22.04.2019 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>22.04.2019 11:00</td> <td>22.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>22.04.2019 18:00</td> <td>22.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>22.04.2019 21:00</td> <td>23.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>23.04.2019 07:00</td> <td>23.04.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>23.04.2019 10:00</td> <td>23.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>23.04.2019 18:00</td> <td>23.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>23.04.2019 21:00</td> <td>24.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>24.04.2019 06:00</td> <td>24.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>24.04.2019 08:00</td> <td>24.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>24.04.2019 18:00</td> <td>24.04.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>24.04.2019 21:00</td> <td>25.04.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>25.04.2019 06:00</td> <td>25.04.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>25.04.2019 08:00</td> <td>25.04.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>850 MW</td> <td>29 MW</td> <td>25.04.2019 18:00</td> <td>25.04.2019 21:35</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Thu, 25 Apr 2019 19:29:58 Z65d51e94-b726-49d5-8764-1b8140f00995_1https://umm.nordpoolgroup.com/#/messages/65d51e94-b726-49d5-8764-1b8140f00995/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>25.04.2019 08:49:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the ash discharge system of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>122 MW</td> <td>72 MW</td> <td></td> <td></td> <td>26.04.2019 20:00</td> <td>27.04.2019 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 25 Apr 2019 06:49:46 Z1e586cac-bb92-43e6-bfc4-f498eca72675_2https://umm.nordpoolgroup.com/#/messages/1e586cac-bb92-43e6-bfc4-f498eca72675/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>24.04.2019 22:48:56</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the ash discharge system of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>122 MW</td> <td>72 MW</td> <td></td> <td></td> <td>24.04.2019 20:00</td> <td>24.04.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 24 Apr 2019 20:48:56 Z464ba54a-35da-4ac2-a9ee-0fe8086d0648_2https://umm.nordpoolgroup.com/#/messages/464ba54a-35da-4ac2-a9ee-0fe8086d0648/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>23.04.2019 14:24:03</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Leading outage was extended and following outage was scheduled earlier. https://umm.nordpoolgroup.com/#/messages/1ed74740-3d37-4382-9f8a-0b78ac582dff/ and https://umm.nordpoolgroup.com/#/messages/a09ca8f9-9e08-4edd-b9dc-a69e0bfa0540/</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>14.05.2019 00:00</td> <td>20.05.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>14.05.2019 00:00</td> <td>20.05.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Tue, 23 Apr 2019 12:24:03 Ze5f1a507-b9e5-415f-807d-4d3b24e2eadd_1https://umm.nordpoolgroup.com/#/messages/e5f1a507-b9e5-415f-807d-4d3b24e2eadd/1Planned, Unavailability of electricity facilities: Transmission, EE → FI <table> <tr> <th>Published:</th> <td>23.04.2019 08:18:12</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Planned maintenance on Rakvere - P&#252;ssi 330 kV line in Estonian area.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>908 MW</td> <td>108 MW</td> <td>09.05.2019 08:00</td> <td>09.05.2019 12:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L360-------H</td> <td>:</td> <td>Rakvere-P&#252;ssi</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Fingrid Oyj</td> </tr> </table> Tue, 23 Apr 2019 06:18:12 Z77ca91ac-3c91-4118-a439-25fa4bb44b6e_1https://umm.nordpoolgroup.com/#/messages/77ca91ac-3c91-4118-a439-25fa4bb44b6e/1Unplanned, Unavailability of electricity facilities: Transmission, EE → FI <table> <tr> <th>Published:</th> <td>23.04.2019 07:54:23</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Unplanned maintenance on Kiisa-Rakvere 330 kV line.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>908 MW</td> <td>108 MW</td> <td>24.04.2019 06:00</td> <td>25.04.2019 18:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L506-------1</td> <td>:</td> <td>Kiisa-Rakvere</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Fingrid Oyj</td> </tr> </table> Tue, 23 Apr 2019 05:54:23 Zc0d8b8fd-3aef-498d-bd52-3c0d0d66bc49_2https://umm.nordpoolgroup.com/#/messages/c0d8b8fd-3aef-498d-bd52-3c0d0d66bc49/2Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>23.04.2019 05:59:24</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the boiler</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>23.04.2019 04:44</td> <td>23.04.2019 05:45</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>190 MW</td> <td>84 MW</td> <td></td> <td></td> <td>23.04.2019 05:45</td> <td>23.04.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 23 Apr 2019 03:59:24 Z56ea4e7f-ce41-4af4-a447-b16c1b7372bb_2https://umm.nordpoolgroup.com/#/messages/56ea4e7f-ce41-4af4-a447-b16c1b7372bb/2Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>20.04.2019 02:14:46</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Reparation of protection system.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>19.04.2019 22:00</td> <td>20.04.2019 02:10</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>19.04.2019 22:00</td> <td>20.04.2019 02:10</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00002O</td> <td>:</td> <td>Estlink 2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> <tr> <td>Elering</td> </tr> </table> Sat, 20 Apr 2019 00:14:46 Z2ebd9d9f-1904-4be0-9faa-3a3038463705_3https://umm.nordpoolgroup.com/#/messages/2ebd9d9f-1904-4be0-9faa-3a3038463705/3Unplanned, Unavailability of electricity facilities: Transmission, EE → FI, FI → EE <table> <tr> <th>Published:</th> <td>19.04.2019 01:53:21</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink 1 cable failure on Estonian side</td> </tr> <tr> <th>Remarks:</th> <td>End time updated.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>18.04.2019 19:00</td> <td>19.04.2019 02:00</td> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>18.04.2019 19:00</td> <td>19.04.2019 02:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00001Q</td> <td>:</td> <td>Estlink</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Fingrid Oyj</td> </tr> </table> Thu, 18 Apr 2019 23:53:21 Z3165a070-33cb-446a-b1e3-20376b4d71c6_3https://umm.nordpoolgroup.com/#/messages/3165a070-33cb-446a-b1e3-20376b4d71c6/3Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>18.04.2019 04:43:31</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink 2 failure</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>17.04.2019 18:01</td> <td>18.04.2019 04:30</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>17.04.2019 18:01</td> <td>18.04.2019 04:30</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00002O</td> <td>:</td> <td>Estlink 2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> <tr> <td>Elering</td> </tr> </table> Thu, 18 Apr 2019 02:43:31 Zc5c69641-dbf9-4725-8880-02ef8184a40f_4https://umm.nordpoolgroup.com/#/messages/c5c69641-dbf9-4725-8880-02ef8184a40f/4Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.04.2019 15:27:22</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>847 MW</td> <td>153 MW</td> <td>11.04.2019 00:00</td> <td>14.04.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>14.04.2019 23:00</td> <td>15.04.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>829 MW</td> <td>50 MW</td> <td>11.04.2019 00:00</td> <td>14.04.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>14.04.2019 23:00</td> <td>15.04.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 12 Apr 2019 13:27:22 Za5f906bf-306a-4a4e-a62a-ec863e84e0ae_1https://umm.nordpoolgroup.com/#/messages/a5f906bf-306a-4a4e-a62a-ec863e84e0ae/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>10.04.2019 15:34:27</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>110 MW</td> <td>84 MW</td> <td></td> <td></td> <td>10.04.2019 21:00</td> <td>11.04.2019 02:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 10 Apr 2019 13:34:27 Z09d3de22-8556-4f8c-9817-941c115eefae_1https://umm.nordpoolgroup.com/#/messages/09d3de22-8556-4f8c-9817-941c115eefae/1Planned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>10.04.2019 08:36:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. According to the decision of the management board of Eesti Energia the production asset is mothballed due to market conditions.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>0 MW</td> <td>130 MW</td> <td></td> <td></td> <td>12.04.2019 23:00</td> <td>31.12.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 10 Apr 2019 06:36:17 Zccbf4fee-2534-48ef-acdb-baed57195958_1https://umm.nordpoolgroup.com/#/messages/ccbf4fee-2534-48ef-acdb-baed57195958/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>09.04.2019 10:24:56</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. According to the decision of the management board of Eesti Energia the production asset is mothballed due to market conditions.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.04.2019 23:00</td> <td>31.12.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 09 Apr 2019 08:24:56 Zca05bed6-e462-4677-be46-82e6ffb638e4_1https://umm.nordpoolgroup.com/#/messages/ca05bed6-e462-4677-be46-82e6ffb638e4/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>09.04.2019 10:24:19</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. According to the decision of the management board of Eesti Energia the production asset is mothballed due to market conditions.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.04.2019 23:00</td> <td>31.12.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 09 Apr 2019 08:24:19 Z2bd644bd-cb93-46ea-baf0-fb626011a30a_1https://umm.nordpoolgroup.com/#/messages/2bd644bd-cb93-46ea-baf0-fb626011a30a/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>09.04.2019 10:23:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. According to the decision of the management board of Eesti Energia the production asset is mothballed due to market conditions.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.04.2019 23:00</td> <td>31.12.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 09 Apr 2019 08:23:15 Z47d0cedd-3345-4d06-98a1-fbb4dcdcb32a_6https://umm.nordpoolgroup.com/#/messages/47d0cedd-3345-4d06-98a1-fbb4dcdcb32a/6Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>08.04.2019 21:43:22</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 8K-1 primary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>65 MW</td> <td>129 MW</td> <td></td> <td></td> <td>02.04.2019 19:00</td> <td>08.04.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 08 Apr 2019 19:43:22 Z86caa64c-370d-4a8c-a4b5-ae50edb1b882_10https://umm.nordpoolgroup.com/#/messages/86caa64c-370d-4a8c-a4b5-ae50edb1b882/10Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>08.04.2019 15:03:54</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Limitation date update</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>847 MW</td> <td>153 MW</td> <td>01.04.2019 00:00</td> <td>01.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>697 MW</td> <td>303 MW</td> <td>01.04.2019 07:00</td> <td>10.04.2019 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>10.04.2019 16:00</td> <td>11.04.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>800 MW</td> <td>79 MW</td> <td>01.04.2019 00:00</td> <td>01.04.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>429 MW</td> <td>450 MW</td> <td>01.04.2019 07:00</td> <td>10.04.2019 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>10.04.2019 16:00</td> <td>11.04.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 08 Apr 2019 13:03:54 Z13146c9d-bcda-4919-9221-e81057aa8b70_4https://umm.nordpoolgroup.com/#/messages/13146c9d-bcda-4919-9221-e81057aa8b70/4Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>05.04.2019 10:10:20</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>04.04.2019 09:00</td> <td>06.04.2019 01:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>95 MW</td> <td>179 MW</td> <td></td> <td></td> <td>06.04.2019 01:00</td> <td>06.04.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>135 MW</td> <td>139 MW</td> <td></td> <td></td> <td>06.04.2019 02:00</td> <td>06.04.2019 03:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>185 MW</td> <td>89 MW</td> <td></td> <td></td> <td>06.04.2019 03:00</td> <td>06.04.2019 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 05 Apr 2019 08:10:20 Z550df40a-1d6f-48be-b8f5-92c1f3e074eb_3https://umm.nordpoolgroup.com/#/messages/550df40a-1d6f-48be-b8f5-92c1f3e074eb/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>04.04.2019 20:27:04</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 6K-A secondary superheater. Leakage in the boiler 6K-A primary superheater</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8-15 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>78 MW</td> <td>95 MW</td> <td></td> <td></td> <td>27.03.2019 04:43</td> <td>04.04.2019 20:20</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 04 Apr 2019 18:27:04 Z412a2542-78f2-47f5-abd0-c46e3e773f3a_2https://umm.nordpoolgroup.com/#/messages/412a2542-78f2-47f5-abd0-c46e3e773f3a/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>03.04.2019 13:44:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Annual maintenance of the unit. Required maintenance of DeSOx plant of the boilers</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>07.12.2020 00:00</td> <td>09.01.2021 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 03 Apr 2019 11:44:48 Z8a59c0f7-24b0-4172-b41d-390a459efaf9_3https://umm.nordpoolgroup.com/#/messages/8a59c0f7-24b0-4172-b41d-390a459efaf9/3Unplanned, Unavailability of electricity facilities: Transmission, EE → FI, FI → EE <table> <tr> <th>Published:</th> <td>03.04.2019 08:26:10</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in Estonian grid.</td> </tr> <tr> <th>Remarks:</th> <td>Updated repair end date</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>31.03.2019 20:00</td> <td>03.04.2019 10:00</td> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>358 MW</td> <td>658 MW</td> <td>31.03.2019 20:00</td> <td>03.04.2019 10:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00002O</td> <td>:</td> <td>Estlink 2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Wed, 03 Apr 2019 06:26:10 Z4dd532d4-c937-4322-a73c-e2cccb024aac_2https://umm.nordpoolgroup.com/#/messages/4dd532d4-c937-4322-a73c-e2cccb024aac/2Planned, Unavailability of electricity facilities: Transmission, EE → FI <table> <tr> <th>Published:</th> <td>02.04.2019 14:24:58</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Transmission line maintenance is rescheduled and new set of dates does not need capacity limitation</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Capacity limitation due to planned maintenance on transmission line</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>916 MW</td> <td>100 MW</td> <td>26.04.2019 08:00</td> <td>29.04.2019 15:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L356-------A</td> <td>:</td> <td>Paide-Viru</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Fingrid Oyj</td> </tr> </table> Tue, 02 Apr 2019 12:24:58 Z524707af-faa0-407b-b087-7b6410857f86_4https://umm.nordpoolgroup.com/#/messages/524707af-faa0-407b-b087-7b6410857f86/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>29.03.2019 23:47:16</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of a smoke exhauster of the boiler 8K-2</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>60 MW</td> <td>134 MW</td> <td></td> <td></td> <td>29.03.2019 04:00</td> <td>30.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 29 Mar 2019 22:47:16 Z14532fee-e644-4059-85d6-88cf0544aa9a_2https://umm.nordpoolgroup.com/#/messages/14532fee-e644-4059-85d6-88cf0544aa9a/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>29.03.2019 14:24:37</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Planned maintenance is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Planned maintenance on transmission lines</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>597 MW</td> <td>403 MW</td> <td>29.04.2019 00:00</td> <td>01.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>01.05.2019 00:00</td> <td>03.05.2019 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>03.05.2019 16:00</td> <td>04.05.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>579 MW</td> <td>300 MW</td> <td>29.04.2019 00:00</td> <td>01.05.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>100 MW</td> <td>01.05.2019 00:00</td> <td>04.05.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L300-------3</td> <td>:</td> <td>Tartu-Balti EJ</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 29 Mar 2019 13:24:37 Z9e13809e-0ebd-45b4-8e0c-ee2890d2467b_15https://umm.nordpoolgroup.com/#/messages/9e13809e-0ebd-45b4-8e0c-ee2890d2467b/15Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>29.03.2019 14:13:53</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated limitation dates</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>19.03.2019 00:00</td> <td>19.03.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>19.03.2019 06:00</td> <td>01.04.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>19.03.2019 00:00</td> <td>19.03.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>829 MW</td> <td>50 MW</td> <td>19.03.2019 06:00</td> <td>01.04.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 29 Mar 2019 13:13:53 Z28342ccd-2366-45b7-b4cb-0ead9d918137_4https://umm.nordpoolgroup.com/#/messages/28342ccd-2366-45b7-b4cb-0ead9d918137/4Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>29.03.2019 11:26:47</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of the stream turbine valve</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 6-10 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>27.03.2019 21:00</td> <td>29.03.2019 12:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 29 Mar 2019 10:26:47 Z62acc94e-3c7c-4646-8226-9c124dcb330a_2https://umm.nordpoolgroup.com/#/messages/62acc94e-3c7c-4646-8226-9c124dcb330a/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>20.03.2019 16:30:20</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance of the units generator transformer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 6-10 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>20.03.2019 10:00</td> <td>20.03.2019 16:20</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 20 Mar 2019 15:30:20 Zee11f1c9-55d7-4690-8696-0757655186c6_1https://umm.nordpoolgroup.com/#/messages/ee11f1c9-55d7-4690-8696-0757655186c6/1Other market information <table> <tr> <th>Published:</th> <td>20.03.2019 14:29:56</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>27.03.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>27.03.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 30 MW; 08:00-09:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Wed, 20 Mar 2019 13:29:56 Z163c863f-2ac6-46ba-bfd3-7023376666c0_1https://umm.nordpoolgroup.com/#/messages/163c863f-2ac6-46ba-bfd3-7023376666c0/1Other market information <table> <tr> <th>Published:</th> <td>20.03.2019 14:27:36</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>26.03.2019 07:00</td> </tr> <tr> <th>Event stop:</th> <td>26.03.2019 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant. The produced capacity will be given to Elspot market. Produced capacity will be: 7:00-8:00 26 MW; 8:00-9:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Wed, 20 Mar 2019 13:27:36 Z008a00e2-f380-478a-a334-b04733de39d2_1https://umm.nordpoolgroup.com/#/messages/008a00e2-f380-478a-a334-b04733de39d2/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>17.03.2019 10:48:40</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Tests</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>100 MW</td> <td>73 MW</td> <td></td> <td></td> <td>18.03.2019 12:00</td> <td>18.03.2019 14:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 17 Mar 2019 09:48:40 Z1bc8cf18-ffb5-4819-aeee-0b8aa4d12cb2_6https://umm.nordpoolgroup.com/#/messages/1bc8cf18-ffb5-4819-aeee-0b8aa4d12cb2/6Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>15.03.2019 13:39:45</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated values</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>15.03.2019 16:00</td> <td>18.03.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>847 MW</td> <td>153 MW</td> <td>18.03.2019 23:00</td> <td>19.03.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>15.03.2019 16:00</td> <td>18.03.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>829 MW</td> <td>50 MW</td> <td>18.03.2019 23:00</td> <td>19.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 15 Mar 2019 12:39:45 Z87ae4255-8153-43c9-990e-f8aa118fba7d_12https://umm.nordpoolgroup.com/#/messages/87ae4255-8153-43c9-990e-f8aa118fba7d/12Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>13.03.2019 15:35:04</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Updated values</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>04.03.2019 00:00</td> <td>04.03.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>797 MW</td> <td>203 MW</td> <td>04.03.2019 07:00</td> <td>15.03.2019 16:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>04.03.2019 00:00</td> <td>04.03.2019 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>429 MW</td> <td>450 MW</td> <td>04.03.2019 07:00</td> <td>15.03.2019 16:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 13 Mar 2019 14:35:04 Ze5480a34-97d2-48f8-9abf-d161ac3c8375_1https://umm.nordpoolgroup.com/#/messages/e5480a34-97d2-48f8-9abf-d161ac3c8375/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>09.03.2019 10:40:27</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the boiler 6K-B secondary systems</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>09.03.2019 11:00</td> <td>12.03.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 09 Mar 2019 09:40:27 Zbc4653f4-7d71-4873-897f-0af37d1d6326_2https://umm.nordpoolgroup.com/#/messages/bc4653f4-7d71-4873-897f-0af37d1d6326/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>07.03.2019 19:15:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 10-17 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>07.03.2019 00:00</td> <td>07.03.2019 20:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 07 Mar 2019 18:15:50 Zf03e49dd-b361-4d90-8b38-75078d15add6_7https://umm.nordpoolgroup.com/#/messages/f03e49dd-b361-4d90-8b38-75078d15add6/7Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>05.03.2019 14:39:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakage in the boiler secondary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>05.02.2019 01:00</td> <td>05.02.2019 03:12</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>05.02.2019 03:12</td> <td>05.03.2019 15:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>229 MW</td> <td></td> <td></td> <td>05.03.2019 15:00</td> <td>05.03.2019 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>05.03.2019 16:00</td> <td>05.03.2019 17:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>145 MW</td> <td>129 MW</td> <td></td> <td></td> <td>05.03.2019 17:00</td> <td>05.03.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>240 MW</td> <td>34 MW</td> <td></td> <td></td> <td>05.03.2019 18:00</td> <td>05.03.2019 19:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 05 Mar 2019 13:39:50 Zc6eb7696-1803-4e18-b401-3940fc30609b_1https://umm.nordpoolgroup.com/#/messages/c6eb7696-1803-4e18-b401-3940fc30609b/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>04.03.2019 09:23:22</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>04.03.2019 21:00</td> <td>05.03.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 04 Mar 2019 08:23:22 Zb4650cf4-f388-4dce-bb12-32cdb38b93f7_6https://umm.nordpoolgroup.com/#/messages/b4650cf4-f388-4dce-bb12-32cdb38b93f7/6Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>01.03.2019 16:07:55</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>01.03.2019 17:00</td> <td>04.03.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>01.03.2019 17:00</td> <td>04.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 01 Mar 2019 15:07:55 Zb9d80f5a-6b73-4923-a15c-3036f9efe20c_1https://umm.nordpoolgroup.com/#/messages/b9d80f5a-6b73-4923-a15c-3036f9efe20c/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>28.02.2019 10:14:02</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 6K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>03.03.2019 00:00</td> <td>04.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 28 Feb 2019 09:14:02 Za9fe77aa-5686-4b1c-807f-5a8022cb3dea_1https://umm.nordpoolgroup.com/#/messages/a9fe77aa-5686-4b1c-807f-5a8022cb3dea/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>28.02.2019 10:13:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>02.03.2019 00:00</td> <td>03.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 28 Feb 2019 09:13:15 Z4c917182-8658-4242-8d12-b286ba00cf4a_13https://umm.nordpoolgroup.com/#/messages/4c917182-8658-4242-8d12-b286ba00cf4a/13Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>27.02.2019 16:18:12</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>15.02.2019 07:00</td> <td>01.03.2019 17:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>15.02.2019 07:00</td> <td>01.03.2019 17:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-EE-RU-00001M</td> <td>:</td> <td>Tartu-Pihkva (RU)</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 27 Feb 2019 15:18:12 Zba6be511-e0da-4bfe-8947-4e26758a7a98_3https://umm.nordpoolgroup.com/#/messages/ba6be511-e0da-4bfe-8947-4e26758a7a98/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>27.02.2019 08:29:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>26.02.2019 20:00</td> <td>01.03.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 27 Feb 2019 07:29:33 Zf9ac0309-7eaa-41a0-b97b-b6c53dbdbadc_1https://umm.nordpoolgroup.com/#/messages/f9ac0309-7eaa-41a0-b97b-b6c53dbdbadc/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>25.02.2019 09:49:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>25.02.2019 19:00</td> <td>26.02.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 25 Feb 2019 08:49:17 Zb9ceea4f-2e06-4630-b2be-3a1b458a9730_3https://umm.nordpoolgroup.com/#/messages/b9ceea4f-2e06-4630-b2be-3a1b458a9730/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>23.02.2019 01:57:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakages in the boiler 2K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>18.02.2019 11:00</td> <td>23.02.2019 03:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 23 Feb 2019 00:57:15 Z051726b2-6d50-434d-8225-ca01823a3aeb_1https://umm.nordpoolgroup.com/#/messages/051726b2-6d50-434d-8225-ca01823a3aeb/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>22.02.2019 13:23:57</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the boiler 5K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>68 MW</td> <td>105 MW</td> <td></td> <td></td> <td>22.02.2019 13:16</td> <td>22.02.2019 14:16</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 22 Feb 2019 12:23:57 Z4fb7e31b-bb2f-4a60-b66d-4f5378e62f5c_2https://umm.nordpoolgroup.com/#/messages/4fb7e31b-bb2f-4a60-b66d-4f5378e62f5c/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>22.02.2019 13:09:25</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Planned outage of line L300 was cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>529 MW</td> <td>471 MW</td> <td>25.03.2019 00:00</td> <td>30.03.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>479 MW</td> <td>400 MW</td> <td>25.03.2019 00:00</td> <td>30.03.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L300-------3</td> <td>:</td> <td>Tartu-Balti EJ</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 22 Feb 2019 12:09:25 Zb6f2ef63-1b3c-41db-a1ab-079b6e83a951_2https://umm.nordpoolgroup.com/#/messages/b6f2ef63-1b3c-41db-a1ab-079b6e83a951/2Planned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>22.02.2019 12:44:23</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Annual maintenance of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>10.08.2019 00:00</td> <td>12.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 22 Feb 2019 11:44:23 Z0d2e6862-5aa6-4177-b944-6227674b7fea_2https://umm.nordpoolgroup.com/#/messages/0d2e6862-5aa6-4177-b944-6227674b7fea/2Planned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>22.02.2019 12:43:38</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Annual maintenance of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>06.07.2019 00:00</td> <td>08.08.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 22 Feb 2019 11:43:38 Ze676fbba-4190-469a-a710-24e430b9b32a_1https://umm.nordpoolgroup.com/#/messages/e676fbba-4190-469a-a710-24e430b9b32a/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>21.02.2019 10:54:25</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>21.02.2019 21:00</td> <td>22.02.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 21 Feb 2019 09:54:25 Zc770eacc-2f52-4ae3-aacc-85d7db657939_1https://umm.nordpoolgroup.com/#/messages/c770eacc-2f52-4ae3-aacc-85d7db657939/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>21.02.2019 08:39:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 6K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>24.02.2019 00:00</td> <td>25.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 21 Feb 2019 07:39:17 Z2cb09fc2-df4f-4c4b-a8f5-8270bc077e7a_5https://umm.nordpoolgroup.com/#/messages/2cb09fc2-df4f-4c4b-a8f5-8270bc077e7a/5Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>20.02.2019 17:21:11</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakages in the boilers 7K-A and 7K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.02.2019 11:00</td> <td>19.02.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>36 MW</td> <td>127 MW</td> <td></td> <td></td> <td>19.02.2019 13:00</td> <td>20.02.2019 17:30</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 20 Feb 2019 16:21:11 Z0d7308df-9b47-4084-af68-71cf21303d87_1https://umm.nordpoolgroup.com/#/messages/0d7308df-9b47-4084-af68-71cf21303d87/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>20.02.2019 09:41:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>20.02.2019 21:00</td> <td>21.02.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 20 Feb 2019 08:41:17 Ze54855b0-469a-4b5c-b7c3-74ead43b11af_2https://umm.nordpoolgroup.com/#/messages/e54855b0-469a-4b5c-b7c3-74ead43b11af/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>20.02.2019 09:40:08</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Annual maintenance of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>14.09.2019 00:00</td> <td>15.10.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 20 Feb 2019 08:40:08 Zadcd16f1-b208-4058-8415-fd33100cf251_10https://umm.nordpoolgroup.com/#/messages/adcd16f1-b208-4058-8415-fd33100cf251/10Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>15.02.2019 08:08:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakage in the boiler 1K-A water economizer</td> </tr> <tr> <th>Remarks:</th> <td>. Capacity start-up time after the event stop time is 8-12 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>68 MW</td> <td>95 MW</td> <td></td> <td></td> <td>07.02.2019 04:00</td> <td>15.02.2019 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 15 Feb 2019 07:08:46 Z20978d8d-e1b0-4f70-8b89-eca93ca44ccf_7https://umm.nordpoolgroup.com/#/messages/20978d8d-e1b0-4f70-8b89-eca93ca44ccf/7Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>14.02.2019 19:05:21</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 3K-A secondary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>04.02.2019 11:45</td> <td>09.02.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>09.02.2019 00:00</td> <td>11.02.2019 01:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>36 MW</td> <td>127 MW</td> <td></td> <td></td> <td>11.02.2019 01:00</td> <td>14.02.2019 19:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 14 Feb 2019 18:05:21 Z0dc00278-1586-4aee-b851-e14f22eb5723_1https://umm.nordpoolgroup.com/#/messages/0dc00278-1586-4aee-b851-e14f22eb5723/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>14.02.2019 10:20:03</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 4K-A and 4K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>16.02.2019 00:00</td> <td>18.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 14 Feb 2019 09:20:03 Zd8b30106-4efd-452b-84a4-50f258ed4978_36https://umm.nordpoolgroup.com/#/messages/d8b30106-4efd-452b-84a4-50f258ed4978/36Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>13.02.2019 16:22:07</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Daily coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>01.01.2019 00:00</td> <td>08.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>08.01.2019 06:00</td> <td>08.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>08.01.2019 21:00</td> <td>09.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>09.01.2019 06:00</td> <td>09.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>09.01.2019 21:00</td> <td>10.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>10.01.2019 06:00</td> <td>10.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>10.01.2019 21:00</td> <td>11.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>11.01.2019 06:00</td> <td>11.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>11.01.2019 21:00</td> <td>14.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>14.01.2019 06:00</td> <td>14.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>14.01.2019 21:00</td> <td>15.01.2019 06:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>15.01.2019 06:00</td> <td>15.01.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>15.01.2019 21:00</td> <td>31.01.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>947 MW</td> <td>53 MW</td> <td>31.01.2019 23:00</td> <td>15.02.2019 07:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>01.01.2019 00:00</td> <td>15.02.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 13 Feb 2019 15:22:07 Z66bb51e4-820d-4cc3-80e0-629f84e46f33_2https://umm.nordpoolgroup.com/#/messages/66bb51e4-820d-4cc3-80e0-629f84e46f33/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>12.02.2019 14:48:01</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Плановое событие отменено</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-A.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>12.02.2019 20:00</td> <td>13.02.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 12 Feb 2019 13:48:01 Z25897fab-045e-46b3-9094-2033cf040e46_1https://umm.nordpoolgroup.com/#/messages/25897fab-045e-46b3-9094-2033cf040e46/1Other market information <table> <tr> <th>Published:</th> <td>12.02.2019 12:20:54</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>20.02.2019 08:00</td> </tr> <tr> <th>Event stop:</th> <td>20.02.2019 10:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant. The produced capacity will be given to Elspot market. Produced capacity will be: 8:00-9:00 26 MW; 9:00-10:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 12 Feb 2019 11:20:54 Z0b010025-9848-45e8-b37b-d3ff8a222eb7_1https://umm.nordpoolgroup.com/#/messages/0b010025-9848-45e8-b37b-d3ff8a222eb7/1Other market information <table> <tr> <th>Published:</th> <td>12.02.2019 12:16:50</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>15.02.2019 13:00</td> </tr> <tr> <th>Event stop:</th> <td>15.02.2019 15:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 13:00-14:00 35 MW; 14:00-15:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 12 Feb 2019 11:16:50 Z700b5842-40a7-4dd1-b8b6-84858952d29e_3https://umm.nordpoolgroup.com/#/messages/700b5842-40a7-4dd1-b8b6-84858952d29e/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>12.02.2019 09:20:54</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 2K-A water economizer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8-12 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>09.02.2019 11:00</td> <td>12.02.2019 11:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 12 Feb 2019 08:20:54 Za513a22e-b369-4e21-9ecb-e13bfcf5552a_2https://umm.nordpoolgroup.com/#/messages/a513a22e-b369-4e21-9ecb-e13bfcf5552a/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>08.02.2019 09:02:24</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>09.02.2019 23:00</td> <td>10.02.2019 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 08 Feb 2019 08:02:24 Z140c7b53-8bd7-4a51-96c3-85af29fd97ab_2https://umm.nordpoolgroup.com/#/messages/140c7b53-8bd7-4a51-96c3-85af29fd97ab/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>08.02.2019 08:59:22</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 6K-B and 6K-A in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>09.02.2019 00:00</td> <td>11.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 08 Feb 2019 07:59:22 Z676318e7-ca60-4be4-a3d8-ebcc145d53cd_2https://umm.nordpoolgroup.com/#/messages/676318e7-ca60-4be4-a3d8-ebcc145d53cd/2Planned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>07.02.2019 14:06:59</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 10-14 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>0 MW</td> <td>130 MW</td> <td></td> <td></td> <td>07.02.2019 00:00</td> <td>07.02.2019 15:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 07 Feb 2019 13:06:59 Z2b50def9-fcc7-42af-9270-75a943ce123b_2https://umm.nordpoolgroup.com/#/messages/2b50def9-fcc7-42af-9270-75a943ce123b/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>07.02.2019 10:57:23</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>07.02.2019 20:00</td> <td>08.02.2019 02:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 07 Feb 2019 09:57:23 Zefefd8c4-32f4-4136-b9a1-d645bd0a4f07_2https://umm.nordpoolgroup.com/#/messages/efefd8c4-32f4-4136-b9a1-d645bd0a4f07/2Other market information <table> <tr> <th>Published:</th> <td>06.02.2019 08:05:02</td> </tr> <tr> <th>Publisher:</th> <td>LITGRID AB</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Updated information published in UMM: https://umm.nordpoolgroup.com/#/messages/cd3362d7-f8fb-47e0-bed2-111ab9d7fe42/1</td> </tr> <tr> <th>Event start:</th> <td>08.06.2019 08:00</td> </tr> <tr> <th>Event stop:</th> <td>08.06.2019 20:00</td> </tr> <tr> <th>Areas:</th> <td>EE, LT, LV</td> </tr> <tr> <th>Remarks:</th> <td>Baltic TSOs announce the preliminary planned date of Baltic isolated operation test 8th of June 2019. The alternative planned date shall be 29th of June 2019. Trading capacities on BY-LT and LT-KAL interconnectors will be zero, capacities of Baltic internal interconnectors and with FI, SE and PL will be limited to the level needed to ensure reliable system operation in isolated mode. More specific information will be made available as soon as respective decisions have been made by Baltic TSOs.</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> <tr> <td>LITGRID, AB</td> </tr> </table> Wed, 06 Feb 2019 07:05:02 Z727bd2fa-82ab-4d23-a892-967939b8ba91_3https://umm.nordpoolgroup.com/#/messages/727bd2fa-82ab-4d23-a892-967939b8ba91/3Other market information <table> <tr> <th>Published:</th> <td>05.02.2019 11:46:59</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Test cancelled</td> </tr> <tr> <th>Event start:</th> <td>06.02.2019 09:00</td> </tr> <tr> <th>Event stop:</th> <td>06.02.2019 11:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 09:00-10:00 30 MW; 10:00-11:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 05 Feb 2019 10:46:59 Zcd3362d7-f8fb-47e0-bed2-111ab9d7fe42_1https://umm.nordpoolgroup.com/#/messages/cd3362d7-f8fb-47e0-bed2-111ab9d7fe42/1Other market information <table> <tr> <th>Published:</th> <td>05.02.2019 07:47:09</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>05.02.2019 08:45</td> </tr> <tr> <th>Event stop:</th> <td>05.02.2019 08:50</td> </tr> <tr> <th>Areas:</th> <td>EE, LV, LT</td> </tr> <tr> <th>Remarks:</th> <td>Elering and AST shall postpone isolated operation test planned for 8th of June 2019 or for 29th of June 2019 for an indefinite period of time due to Russian Grid operator announcement to conduct Kaliningrad region isolated operation test prior to 8th of June 2019. At the same time Baltic TSOs agree to continue preparations for achieving Baltic isolated operation capability</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Tue, 05 Feb 2019 06:47:09 Z95274091-5af0-4d43-9899-5e8a96c47439_8https://umm.nordpoolgroup.com/#/messages/95274091-5af0-4d43-9899-5e8a96c47439/8Planned, Unavailability of electricity facilities: Production, EE, Balti - G11 <table> <tr> <th>Published:</th> <td>04.02.2019 19:53:16</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance of unit armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G11</td> <td>38W-MT--BEJG11-2</td> <td></td> <td>192 MW</td> <td>0 MW</td> <td>192 MW</td> <td></td> <td></td> <td>02.02.2019 23:00</td> <td>04.02.2019 15:30</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>142 MW</td> <td></td> <td></td> <td>04.02.2019 15:30</td> <td>06.02.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 04 Feb 2019 18:53:16 Z915606be-1ca6-48d0-bc40-505e8ac89d18_4https://umm.nordpoolgroup.com/#/messages/915606be-1ca6-48d0-bc40-505e8ac89d18/4Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>04.02.2019 15:15:53</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler secondary superheater</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>200 MW</td> <td>74 MW</td> <td></td> <td></td> <td>24.01.2019 16:15</td> <td>24.01.2019 19:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>24.01.2019 19:00</td> <td>04.02.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>229 MW</td> <td></td> <td></td> <td>04.02.2019 18:00</td> <td>04.02.2019 19:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>04.02.2019 19:00</td> <td>04.02.2019 20:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>145 MW</td> <td>129 MW</td> <td></td> <td></td> <td>04.02.2019 20:00</td> <td>04.02.2019 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>240 MW</td> <td>34 MW</td> <td></td> <td></td> <td>04.02.2019 21:00</td> <td>04.02.2019 22:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 04 Feb 2019 14:15:53 Zd6bba500-ded7-42a2-a0c4-8a845048d3f1_1https://umm.nordpoolgroup.com/#/messages/d6bba500-ded7-42a2-a0c4-8a845048d3f1/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>02.02.2019 09:09:30</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>04.02.2019 00:00</td> <td>04.02.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 02 Feb 2019 08:09:30 Z267524ff-dee2-42cf-9946-9d86f5af260f_1https://umm.nordpoolgroup.com/#/messages/267524ff-dee2-42cf-9946-9d86f5af260f/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>01.02.2019 19:10:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 3K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>02.02.2019 00:00</td> <td>02.02.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 01 Feb 2019 18:10:46 Z5f450002-ff44-4a63-a70e-5e8438157744_2https://umm.nordpoolgroup.com/#/messages/5f450002-ff44-4a63-a70e-5e8438157744/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>31.01.2019 19:12:00</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>Плановое событие отменено</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>31.01.2019 23:00</td> <td>01.02.2019 03:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>113 MW</td> <td></td> <td></td> <td>01.02.2019 03:00</td> <td>01.02.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 18:12:00 Z4ca5e58f-13d7-477e-9ab5-c396a258ddd4_3https://umm.nordpoolgroup.com/#/messages/4ca5e58f-13d7-477e-9ab5-c396a258ddd4/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>31.01.2019 14:17:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. The boilers 4K-A and 4K-B simultaneous cleanings</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>02.02.2019 00:00</td> <td>03.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 13:17:48 Zf673de9a-f4ee-4465-9f15-cfb559d9ec5d_2https://umm.nordpoolgroup.com/#/messages/f673de9a-f4ee-4465-9f15-cfb559d9ec5d/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>31.01.2019 10:32:02</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>03.02.2019 00:00</td> <td>04.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:32:02 Z8b72c5e6-9209-4918-885d-0d0d8806670d_1https://umm.nordpoolgroup.com/#/messages/8b72c5e6-9209-4918-885d-0d0d8806670d/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>31.01.2019 10:15:14</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 2K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>01.02.2019 23:00</td> <td>02.02.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:15:14 Z9a2fbef6-c227-4582-8b77-28cc6d66f3ae_1https://umm.nordpoolgroup.com/#/messages/9a2fbef6-c227-4582-8b77-28cc6d66f3ae/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>31.01.2019 10:14:43</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 2K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>02.02.2019 23:00</td> <td>03.02.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:14:43 Z1fe6fbb9-f0b0-452a-a4f9-aeaddaee7b91_1https://umm.nordpoolgroup.com/#/messages/1fe6fbb9-f0b0-452a-a4f9-aeaddaee7b91/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>31.01.2019 10:13:47</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 1K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>02.02.2019 23:00</td> <td>03.02.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:13:47 Z687fc25f-8458-49c1-a9bf-dff8eeeef810_2https://umm.nordpoolgroup.com/#/messages/687fc25f-8458-49c1-a9bf-dff8eeeef810/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>31.01.2019 10:11:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 2K-A and 2K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>03.02.2019 00:00</td> <td>04.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:11:37 Z052889c7-f48c-4e5f-9573-14bd4ba4581b_2https://umm.nordpoolgroup.com/#/messages/052889c7-f48c-4e5f-9573-14bd4ba4581b/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>31.01.2019 10:09:32</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 1K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>01.02.2019 23:00</td> <td>02.02.2019 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 09:09:32 Zf20697fa-ff1e-4c03-8e09-09f9d48b34fc_1https://umm.nordpoolgroup.com/#/messages/f20697fa-ff1e-4c03-8e09-09f9d48b34fc/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>31.01.2019 09:26:51</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>03.02.2019 00:00</td> <td>04.02.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 31 Jan 2019 08:26:51 Z0e262206-1343-46ca-ba7c-ac886cc40c9a_6https://umm.nordpoolgroup.com/#/messages/0e262206-1343-46ca-ba7c-ac886cc40c9a/6Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>30.01.2019 16:19:56</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 26 water economizer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 12 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>50 MW</td> <td>80 MW</td> <td></td> <td></td> <td>24.01.2019 16:50</td> <td>29.01.2019 05:15</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>130 MW</td> <td></td> <td></td> <td>29.01.2019 05:15</td> <td>30.01.2019 09:45</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>85 MW</td> <td></td> <td></td> <td>30.01.2019 09:45</td> <td>30.01.2019 16:15</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 30 Jan 2019 15:19:56 Z475edd09-2c0b-43ab-b4a1-05a3f1a6232d_1https://umm.nordpoolgroup.com/#/messages/475edd09-2c0b-43ab-b4a1-05a3f1a6232d/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>30.01.2019 10:43:59</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>31.01.2019 00:00</td> <td>31.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 30 Jan 2019 09:43:59 Z7efce1df-22e0-4f8c-9f73-3ab26d8ee6d5_1https://umm.nordpoolgroup.com/#/messages/7efce1df-22e0-4f8c-9f73-3ab26d8ee6d5/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>30.01.2019 09:09:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>31.01.2019 00:00</td> <td>31.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 30 Jan 2019 08:09:46 Z6e5b7f5a-910a-4816-85d8-a17a4b542a79_3https://umm.nordpoolgroup.com/#/messages/6e5b7f5a-910a-4816-85d8-a17a4b542a79/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>27.01.2019 23:41:39</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator. The boilers 7K-A and 7K-B simultaneous cleanings</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>26.01.2019 00:00</td> <td>28.01.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>36 MW</td> <td>127 MW</td> <td></td> <td></td> <td>28.01.2019 02:00</td> <td>28.01.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 27 Jan 2019 22:41:39 Za3bb2ad6-ad6e-4d25-b77a-470084d26f74_2https://umm.nordpoolgroup.com/#/messages/a3bb2ad6-ad6e-4d25-b77a-470084d26f74/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>27.01.2019 09:38:31</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the turbine armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>27.01.2019 01:35</td> <td>27.01.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>123 MW</td> <td></td> <td></td> <td>27.01.2019 10:00</td> <td>27.01.2019 12:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 27 Jan 2019 08:38:31 Z8378173c-903b-43e3-96d2-9380eb01b62d_1https://umm.nordpoolgroup.com/#/messages/8378173c-903b-43e3-96d2-9380eb01b62d/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>26.01.2019 11:06:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 5К-А</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>27.01.2019 00:00</td> <td>27.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 26 Jan 2019 10:06:33 Z717341ba-d2cf-45d3-a666-e3bb3526f299_3https://umm.nordpoolgroup.com/#/messages/717341ba-d2cf-45d3-a666-e3bb3526f299/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>26.01.2019 09:34:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Elimination of leakage in the boiler 6K-A</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 5-11 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>70 MW</td> <td>103 MW</td> <td></td> <td></td> <td>22.01.2019 00:00</td> <td>26.01.2019 14:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 26 Jan 2019 08:34:46 Zddf1104d-57c0-4fe8-a750-743a82a94b2c_1https://umm.nordpoolgroup.com/#/messages/ddf1104d-57c0-4fe8-a750-743a82a94b2c/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>25.01.2019 09:48:56</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 4K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>26.01.2019 00:00</td> <td>26.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 25 Jan 2019 08:48:56 Z4fec07c2-2395-4ce3-8f2d-723354a7ea68_1https://umm.nordpoolgroup.com/#/messages/4fec07c2-2395-4ce3-8f2d-723354a7ea68/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>24.01.2019 09:15:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>27.01.2019 00:00</td> <td>28.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 24 Jan 2019 08:15:33 Zedb4f439-5df6-4cd9-b4e1-ecab8044aca6_1https://umm.nordpoolgroup.com/#/messages/edb4f439-5df6-4cd9-b4e1-ecab8044aca6/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>24.01.2019 09:13:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>25.01.2019 00:00</td> <td>25.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 24 Jan 2019 08:13:48 Z0ef8b14f-cb3f-48fe-90f5-0b66a795e0e4_1https://umm.nordpoolgroup.com/#/messages/0ef8b14f-cb3f-48fe-90f5-0b66a795e0e4/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>22.01.2019 09:14:36</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-A.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>23.01.2019 00:00</td> <td>23.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 22 Jan 2019 08:14:36 Z8cdc6f89-c818-4829-89eb-90979f5ce721_5https://umm.nordpoolgroup.com/#/messages/8cdc6f89-c818-4829-89eb-90979f5ce721/5Planned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>22.01.2019 07:41:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of the turbine armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>21.01.2019 22:00</td> <td>22.01.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>40 MW</td> <td>123 MW</td> <td></td> <td></td> <td>22.01.2019 08:00</td> <td>22.01.2019 10:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 22 Jan 2019 06:41:48 Z92f71410-eda7-4a3b-bc08-37994c4bf43a_2https://umm.nordpoolgroup.com/#/messages/92f71410-eda7-4a3b-bc08-37994c4bf43a/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>20.01.2019 09:55:03</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 3К-A and 3К-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>20.01.2019 00:00</td> <td>21.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 20 Jan 2019 08:55:03 Z43edd808-3a47-4e26-826c-be3725d882bc_4https://umm.nordpoolgroup.com/#/messages/43edd808-3a47-4e26-826c-be3725d882bc/4Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>19.01.2019 10:11:43</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the turbine armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>18.01.2019 13:00</td> <td>19.01.2019 08:40</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>60 MW</td> <td>134 MW</td> <td></td> <td></td> <td>19.01.2019 08:40</td> <td>19.01.2019 13:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 19 Jan 2019 09:11:43 Z4a005f67-4b8d-4fd8-a750-61bef79d6821_1https://umm.nordpoolgroup.com/#/messages/4a005f67-4b8d-4fd8-a750-61bef79d6821/1Other market information <table> <tr> <th>Published:</th> <td>18.01.2019 15:33:17</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>25.01.2019 09:00</td> </tr> <tr> <th>Event stop:</th> <td>25.01.2019 11:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant. The produced capacity will be given to Elspot market. Produced capacity will be: 9:00-10:00 26 MW; 10:00-11:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 18 Jan 2019 14:33:17 Ze55e0872-d000-4cfd-8a35-ba20d10b4ee1_1https://umm.nordpoolgroup.com/#/messages/e55e0872-d000-4cfd-8a35-ba20d10b4ee1/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>17.01.2019 09:34:23</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 5K-A and 5K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>19.01.2019 00:00</td> <td>21.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 17 Jan 2019 08:34:23 Zd3360eb4-db81-44f4-9a48-49743d79724c_1https://umm.nordpoolgroup.com/#/messages/d3360eb4-db81-44f4-9a48-49743d79724c/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>17.01.2019 09:33:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 4K-A and 4K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>19.01.2019 00:00</td> <td>21.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 17 Jan 2019 08:33:50 Ze7d6d168-ea2b-43c4-a210-54384675035d_1https://umm.nordpoolgroup.com/#/messages/e7d6d168-ea2b-43c4-a210-54384675035d/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>16.01.2019 19:55:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in the boiler 6K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>68 MW</td> <td>105 MW</td> <td></td> <td></td> <td>16.01.2019 19:45</td> <td>16.01.2019 21:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 16 Jan 2019 18:55:37 Z96025ad5-d576-4b72-8827-47bae8c034ef_6https://umm.nordpoolgroup.com/#/messages/96025ad5-d576-4b72-8827-47bae8c034ef/6Planned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>16.01.2019 19:46:13</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the generator</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>11.01.2019 00:00</td> <td>11.01.2019 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>144 MW</td> <td></td> <td></td> <td>11.01.2019 23:00</td> <td>12.01.2019 06:42</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>12.01.2019 06:42</td> <td>16.01.2019 10:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>144 MW</td> <td></td> <td></td> <td>16.01.2019 10:00</td> <td>16.01.2019 20:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 16 Jan 2019 18:46:13 Zf97bb1fd-909e-40f6-87a7-cb979fa35803_2https://umm.nordpoolgroup.com/#/messages/f97bb1fd-909e-40f6-87a7-cb979fa35803/2Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>16.01.2019 15:27:24</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 26 water economizer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>50 MW</td> <td>80 MW</td> <td></td> <td></td> <td>13.01.2019 20:00</td> <td>16.01.2019 15:30</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 16 Jan 2019 14:27:24 Zf8fa5311-501e-4a24-9b86-1fe7b6ee0757_2https://umm.nordpoolgroup.com/#/messages/f8fa5311-501e-4a24-9b86-1fe7b6ee0757/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:48:06</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Russian 330kV grid. Updated period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>500 MW</td> <td>500 MW</td> <td>18.08.2019 00:00</td> <td>19.08.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>19.08.2019 00:00</td> <td>20.08.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>20.08.2019 02:00</td> <td>28.08.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>600 MW</td> <td>279 MW</td> <td>18.08.2019 00:00</td> <td>20.08.2019 02:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>100 MW</td> <td>20.08.2019 02:00</td> <td>28.08.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:48:06 Z4784bf18-5551-4146-9b4d-303fb1e2b68d_3https://umm.nordpoolgroup.com/#/messages/4784bf18-5551-4146-9b4d-303fb1e2b68d/3Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:42:28</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Russian 330kV grid. Updated period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>650 MW</td> <td>350 MW</td> <td>31.07.2019 00:00</td> <td>05.08.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>05.08.2019 08:00</td> <td>09.08.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>650 MW</td> <td>229 MW</td> <td>31.07.2019 00:00</td> <td>03.08.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>03.08.2019 00:00</td> <td>05.08.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>279 MW</td> <td>05.08.2019 08:00</td> <td>09.08.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:42:28 Z5ed8274b-28b9-4133-a716-a132c59d736e_2https://umm.nordpoolgroup.com/#/messages/5ed8274b-28b9-4133-a716-a132c59d736e/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:39:40</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Estonian 330kV line. Corrected asset and period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>500 MW</td> <td>500 MW</td> <td>09.08.2019 00:00</td> <td>18.08.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>600 MW</td> <td>279 MW</td> <td>09.08.2019 00:00</td> <td>18.08.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-EE-RU-00001M</td> <td>:</td> <td>Tartu-Pihkva (RU)</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:39:40 Zd18f7c04-9730-42ba-87bc-2c42a5f6d42a_2https://umm.nordpoolgroup.com/#/messages/d18f7c04-9730-42ba-87bc-2c42a5f6d42a/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:27:18</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019. Outage in Latvian grid. Updated period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>15.10.2019 00:00</td> <td>04.11.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>15.10.2019 00:00</td> <td>04.11.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:27:18 Zb405d763-3efb-43d9-834c-a2ec66b9c5f0_2https://umm.nordpoolgroup.com/#/messages/b405d763-3efb-43d9-834c-a2ec66b9c5f0/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:25:23</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Russian 330kV grid.Updated period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>679 MW</td> <td>321 MW</td> <td>20.09.2019 00:00</td> <td>29.09.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>729 MW</td> <td>150 MW</td> <td>20.09.2019 00:00</td> <td>29.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:25:23 Zff22f513-ab9d-47fc-85d5-2d7153295389_2https://umm.nordpoolgroup.com/#/messages/ff22f513-ab9d-47fc-85d5-2d7153295389/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.01.2019 13:22:43</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019. Outage in Latvian and Estonian grid. Updated period</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>450 MW</td> <td>550 MW</td> <td>29.09.2019 00:00</td> <td>30.09.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>529 MW</td> <td>471 MW</td> <td>30.09.2019 00:00</td> <td>15.10.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>429 MW</td> <td>450 MW</td> <td>29.09.2019 00:00</td> <td>15.10.2019 00:00</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L353-------0</td> <td>:</td> <td>Tsirguliina-Viru</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Mon, 14 Jan 2019 12:22:43 Z05a792b3-2641-4ec7-acbb-b6510e21938f_4https://umm.nordpoolgroup.com/#/messages/05a792b3-2641-4ec7-acbb-b6510e21938f/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>14.01.2019 01:00:17</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the unit. Leakage in the boiler 6K-A</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 9 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>12.01.2019 00:00</td> <td>13.01.2019 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>78 MW</td> <td>95 MW</td> <td></td> <td></td> <td>13.01.2019 08:00</td> <td>14.01.2019 01:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 14 Jan 2019 00:00:17 Z00d41284-446f-4ec4-9b25-d4c68b481f79_2https://umm.nordpoolgroup.com/#/messages/00d41284-446f-4ec4-9b25-d4c68b481f79/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>11.01.2019 11:13:01</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>13.01.2019 00:00</td> <td>14.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 11 Jan 2019 10:13:01 Z522256f9-76cf-4d6c-9a14-ca7dac451541_1https://umm.nordpoolgroup.com/#/messages/522256f9-76cf-4d6c-9a14-ca7dac451541/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>10.01.2019 16:21:06</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-A trip</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>78 MW</td> <td>95 MW</td> <td></td> <td></td> <td>10.01.2019 16:10</td> <td>10.01.2019 18:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 10 Jan 2019 15:21:06 Z637e5f4d-d9f0-47d5-8fc8-d2a895bdaddb_1https://umm.nordpoolgroup.com/#/messages/637e5f4d-d9f0-47d5-8fc8-d2a895bdaddb/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>10.01.2019 08:59:32</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 3K-A.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>11.01.2019 00:00</td> <td>11.01.2019 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 10 Jan 2019 07:59:32 Z929c8079-e5d4-425f-a400-4007263a6d0e_9https://umm.nordpoolgroup.com/#/messages/929c8079-e5d4-425f-a400-4007263a6d0e/9Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>10.01.2019 01:32:53</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Annual maintenance of the boiler 6K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>24.11.2018 00:00</td> <td>08.01.2019 23:37</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>123 MW</td> <td></td> <td></td> <td>08.01.2019 23:37</td> <td>10.01.2019 02:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 10 Jan 2019 00:32:53 Z71b87df3-a1da-4ff3-9f54-09187652d281_3https://umm.nordpoolgroup.com/#/messages/71b87df3-a1da-4ff3-9f54-09187652d281/3Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>07.01.2019 17:48:28</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler trip</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>07.01.2019 14:07</td> <td>07.01.2019 18:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>140 MW</td> <td>134 MW</td> <td></td> <td></td> <td>07.01.2019 18:00</td> <td>07.01.2019 19:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 07 Jan 2019 16:48:28 Z865d9977-dd09-45c1-b2ff-967cb15f4621_2https://umm.nordpoolgroup.com/#/messages/865d9977-dd09-45c1-b2ff-967cb15f4621/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>07.01.2019 01:23:30</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 4K-A</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 2 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>06.01.2019 22:00</td> <td>07.01.2019 01:30</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 07 Jan 2019 00:23:30 Z0d0d1a5c-2dc0-408b-a469-042050263564_2https://umm.nordpoolgroup.com/#/messages/0d0d1a5c-2dc0-408b-a469-042050263564/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>04.01.2019 09:34:36</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>05.01.2019 00:00</td> <td>06.01.2019 13:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>06.01.2019 13:00</td> <td>06.01.2019 16:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 04 Jan 2019 08:34:36 Z577a2e1c-c7da-43f5-a317-b8cf1241e5f7_9https://umm.nordpoolgroup.com/#/messages/577a2e1c-c7da-43f5-a317-b8cf1241e5f7/9Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>03.01.2019 21:59:26</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the boiler 4К-А</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 9-18 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>24.12.2018 00:00</td> <td>27.12.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>27.12.2018 00:00</td> <td>03.01.2019 22:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 03 Jan 2019 20:59:26 Z2ba1cfd3-ccc5-4ff9-99df-14cb9a1a5d77_2https://umm.nordpoolgroup.com/#/messages/2ba1cfd3-ccc5-4ff9-99df-14cb9a1a5d77/2Other market information <table> <tr> <th>Published:</th> <td>01.01.2019 07:59:45</td> </tr> <tr> <th>Publisher:</th> <td>LITGRID AB</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>01.01.2019 00:00</td> </tr> <tr> <th>Event stop:</th> <td>31.12.2019 23:59</td> </tr> <tr> <th>Areas:</th> <td>BY, EE, LT, LV</td> </tr> <tr> <th>Remarks:</th> <td>Litgrid signed contract with &quot;Lietuvos energijos gamyba&quot; AB for maintaining 400 MW secondary emergency reserve for 2019, which will be maintained in Kruonis PSPP (by two hydro units), this capacity will not be available for the market.</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>LITGRID, AB</td> </tr> </table> Tue, 01 Jan 2019 06:59:45 Z8c1d0142-68b8-4b78-bba7-2b866a88e0f0_5https://umm.nordpoolgroup.com/#/messages/8c1d0142-68b8-4b78-bba7-2b866a88e0f0/5Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>31.12.2018 09:42:46</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Boilers 3A, 3B surfaces&#39; cleaning.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>30.12.2018 00:00</td> <td>31.12.2018 02:57</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>31.12.2018 02:57</td> <td>02.01.2019 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>02.01.2019 05:00</td> <td>03.01.2019 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 31 Dec 2018 08:42:46 Zbc859b1e-7a9c-461a-828d-53548ecba6b0_21https://umm.nordpoolgroup.com/#/messages/bc859b1e-7a9c-461a-828d-53548ecba6b0/21Unplanned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>31.12.2018 02:22:25</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of main equipment of the boiler</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>26.11.2018 11:23</td> <td>31.12.2018 02:12</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>229 MW</td> <td></td> <td></td> <td>31.12.2018 02:12</td> <td>31.12.2018 03:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>31.12.2018 03:00</td> <td>31.12.2018 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>145 MW</td> <td>129 MW</td> <td></td> <td></td> <td>31.12.2018 04:00</td> <td>31.12.2018 05:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>240 MW</td> <td>34 MW</td> <td></td> <td></td> <td>31.12.2018 05:00</td> <td>31.12.2018 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 31 Dec 2018 01:22:25 Z8fa30485-1afc-4a1b-b58f-13f4ab02a1d4_2https://umm.nordpoolgroup.com/#/messages/8fa30485-1afc-4a1b-b58f-13f4ab02a1d4/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>28.12.2018 13:56:27</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>31.12.2018 00:00</td> <td>01.01.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>31.12.2018 00:00</td> <td>01.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 28 Dec 2018 12:56:27 Z87947509-1ef8-44d3-82bc-34a37713d387_7https://umm.nordpoolgroup.com/#/messages/87947509-1ef8-44d3-82bc-34a37713d387/7Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>28.12.2018 13:55:08</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Outage in Russian 330 kV grid</td> </tr> <tr> <th>Remarks:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>21.12.2018 00:00</td> <td>31.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>21.12.2018 00:00</td> <td>31.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 28 Dec 2018 12:55:08 Z8f8bb22a-7229-4163-aae6-1f12711aff21_1https://umm.nordpoolgroup.com/#/messages/8f8bb22a-7229-4163-aae6-1f12711aff21/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>27.12.2018 09:10:07</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5К-А surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>01.01.2019 00:00</td> <td>02.01.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 27 Dec 2018 08:10:07 Z74fe1279-7715-4b63-aa1c-0160667277dd_2https://umm.nordpoolgroup.com/#/messages/74fe1279-7715-4b63-aa1c-0160667277dd/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>26.12.2018 12:59:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 1K-A water economizer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 12-20 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>68 MW</td> <td>95 MW</td> <td></td> <td></td> <td>22.12.2018 06:00</td> <td>26.12.2018 13:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 26 Dec 2018 11:59:37 Zbcb0981c-6f62-45e6-8c20-7ca0af09bdcc_7https://umm.nordpoolgroup.com/#/messages/bcb0981c-6f62-45e6-8c20-7ca0af09bdcc/7Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G8 <table> <tr> <th>Published:</th> <td>25.12.2018 12:13:59</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Repair of the LP rotor of turbine</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G8</td> <td>38W-MT--EEJG8--U</td> <td></td> <td>194 MW</td> <td>0 MW</td> <td>194 MW</td> <td></td> <td></td> <td>13.11.2018 03:31</td> <td>22.12.2018 14:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>80 MW</td> <td>114 MW</td> <td></td> <td></td> <td>22.12.2018 14:00</td> <td>25.12.2018 14:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 25 Dec 2018 11:13:59 Z2a3e7984-ec2a-4958-83e4-cc95109109b8_5https://umm.nordpoolgroup.com/#/messages/2a3e7984-ec2a-4958-83e4-cc95109109b8/5Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>22.12.2018 05:26:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in a live-steam reheater of the boiler 1K-B</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 10 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>68 MW</td> <td>95 MW</td> <td></td> <td></td> <td>16.12.2018 17:45</td> <td>22.12.2018 05:50</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 22 Dec 2018 04:26:50 Zb5af03d7-7956-4ffd-a5f6-dd03c90b9edb_2https://umm.nordpoolgroup.com/#/messages/b5af03d7-7956-4ffd-a5f6-dd03c90b9edb/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>20.12.2018 11:06:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3К-Б surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>22.12.2018 00:00</td> <td>23.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 20 Dec 2018 10:06:33 Zfcb12dca-0c85-4498-8c05-8da889c91631_1https://umm.nordpoolgroup.com/#/messages/fcb12dca-0c85-4498-8c05-8da889c91631/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>20.12.2018 09:06:25</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5К-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>23.12.2018 00:00</td> <td>24.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 20 Dec 2018 08:06:25 Z471bb2ca-5440-4c5f-8602-ee748a24f214_1https://umm.nordpoolgroup.com/#/messages/471bb2ca-5440-4c5f-8602-ee748a24f214/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>20.12.2018 09:06:22</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5К-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>23.12.2018 00:00</td> <td>24.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 20 Dec 2018 08:06:22 Z947e266a-3467-479d-aa9a-582892a796d1_1https://umm.nordpoolgroup.com/#/messages/947e266a-3467-479d-aa9a-582892a796d1/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>20.12.2018 08:42:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 5К-А</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>70 MW</td> <td>103 MW</td> <td></td> <td></td> <td>20.12.2018 22:00</td> <td>21.12.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 20 Dec 2018 07:42:15 Z46e1726f-6412-4a33-9727-3175f03e8ce9_1https://umm.nordpoolgroup.com/#/messages/46e1726f-6412-4a33-9727-3175f03e8ce9/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>20.12.2018 08:40:54</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 3К-А</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>20.12.2018 21:00</td> <td>21.12.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 20 Dec 2018 07:40:54 Z49080116-b922-4a44-bcf0-cac35d952d9c_1https://umm.nordpoolgroup.com/#/messages/49080116-b922-4a44-bcf0-cac35d952d9c/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>19.12.2018 09:36:56</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 4К-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>19.12.2018 22:00</td> <td>20.12.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 19 Dec 2018 08:36:56 Z566a1b05-5186-4790-b717-db0b41b0d6a8_5https://umm.nordpoolgroup.com/#/messages/566a1b05-5186-4790-b717-db0b41b0d6a8/5Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>18.12.2018 15:04:47</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Outage in Russian 330 kV grid</td> </tr> <tr> <th>Remarks:</th> <td>Updated values</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>17.12.2018 00:00</td> <td>21.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>17.12.2018 00:00</td> <td>21.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Tue, 18 Dec 2018 14:04:47 Zfcbfdff6-334c-43a3-b7b3-5d4e7f78edba_1https://umm.nordpoolgroup.com/#/messages/fcbfdff6-334c-43a3-b7b3-5d4e7f78edba/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>18.12.2018 09:27:37</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler 5К-А</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>18.12.2018 22:00</td> <td>19.12.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 18 Dec 2018 08:27:37 Z3717e612-be8e-4780-a125-c524150f2daf_2https://umm.nordpoolgroup.com/#/messages/3717e612-be8e-4780-a125-c524150f2daf/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>16.12.2018 18:20:20</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>16.12.2018 00:00</td> <td>16.12.2018 21:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 16 Dec 2018 17:20:20 Z2859cb02-5b5a-49fc-94ea-8bb3bb2224a1_2https://umm.nordpoolgroup.com/#/messages/2859cb02-5b5a-49fc-94ea-8bb3bb2224a1/2Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>16.12.2018 17:06:08</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 25 water economizer</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>55 MW</td> <td>75 MW</td> <td></td> <td></td> <td>15.12.2018 13:25</td> <td>16.12.2018 17:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 16 Dec 2018 16:06:08 Zb5e8032c-0cd4-41b1-b692-0a85f9c33fba_2https://umm.nordpoolgroup.com/#/messages/b5e8032c-0cd4-41b1-b692-0a85f9c33fba/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.12.2018 16:31:51</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>14.12.2018 15:00</td> <td>15.12.2018 17:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>15.12.2018 17:00</td> <td>17.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>429 MW</td> <td>450 MW</td> <td>14.12.2018 15:00</td> <td>15.12.2018 17:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>0 MW</td> <td>15.12.2018 17:00</td> <td>17.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Fri, 14 Dec 2018 15:31:51 Z862d2572-901a-45f2-a20e-5235c5269bd5_4https://umm.nordpoolgroup.com/#/messages/862d2572-901a-45f2-a20e-5235c5269bd5/4Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>14.12.2018 15:53:49</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Outage in Latvian grid.</td> </tr> <tr> <th>Remarks:</th> <td>Outage ended earlier than planned</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>10.12.2018 00:00</td> <td>14.12.2018 15:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>429 MW</td> <td>450 MW</td> <td>10.12.2018 00:00</td> <td>14.12.2018 15:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 14 Dec 2018 14:53:49 Z7b09db2e-aac3-4834-824e-97da825e5f6c_2https://umm.nordpoolgroup.com/#/messages/7b09db2e-aac3-4834-824e-97da825e5f6c/2Other market information <table> <tr> <th>Published:</th> <td>14.12.2018 09:27:15</td> </tr> <tr> <th>Publisher:</th> <td>LITGRID AB</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>01.01.2016 00:00</td> </tr> <tr> <th>Event stop:</th> <td>01.02.2019 00:00</td> </tr> <tr> <th>Areas:</th> <td>BY, EE, KAL, LT, LV</td> </tr> <tr> <th>Remarks:</th> <td>All Baltic countries NRAs have approved new “Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries” (Rules) prepared by Baltic TSOs, detailed information on the applicable Rules and principles can be found on the Baltic TSOs homepages. Baltic TSOs agreed, that during 2016 in the process of calculation of trading capacity f [Decision time: 11.12.2015 9:35], [Type of event: MARKET INFORMATION : OTHER]</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>LITGRID, AB</td> </tr> </table> Fri, 14 Dec 2018 08:27:15 Z4bc263be-142c-4378-9f02-b62b16aae9ae_1https://umm.nordpoolgroup.com/#/messages/4bc263be-142c-4378-9f02-b62b16aae9ae/1Other market information <table> <tr> <th>Published:</th> <td>14.12.2018 09:18:45</td> </tr> <tr> <th>Publisher:</th> <td>LITGRID AB</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>01.02.2019 00:00</td> </tr> <tr> <th>Areas:</th> <td>BY, EE, KAL, LT, LV, RU</td> </tr> <tr> <th>Remarks:</th> <td>Dec. 13th, 2018 Lithuanian NRA approved the Terms, Conditions and Methodology on Cross-Zonal Capacity Calculation, Provision and Allocation with the 3rd Countries (The Methodology), which shall take effect on February 1st, 2019. The all Baltic NRAs approved Methodology is published on Baltic TSOs websites. The link: http://www.litgrid.eu/index.php/electricity-market/cross-border-trading-capacities/2138</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>LITGRID, AB</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> <tr> <td>Elering</td> </tr> </table> Fri, 14 Dec 2018 08:18:45 Z78fde57e-2dd6-4f9f-909d-1b382fc1ba0f_1https://umm.nordpoolgroup.com/#/messages/78fde57e-2dd6-4f9f-909d-1b382fc1ba0f/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>13.12.2018 09:45:40</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 4K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>16.12.2018 00:00</td> <td>17.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 13 Dec 2018 08:45:40 Z06345509-3546-49bb-9781-62980329339e_1https://umm.nordpoolgroup.com/#/messages/06345509-3546-49bb-9781-62980329339e/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>13.12.2018 09:45:03</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>16.12.2018 00:00</td> <td>17.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 13 Dec 2018 08:45:03 Z5133ae02-01f6-441e-a6d6-2db4d000cedf_11https://umm.nordpoolgroup.com/#/messages/5133ae02-01f6-441e-a6d6-2db4d000cedf/11Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>13.12.2018 09:41:16</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Maintenance of boilers 26 armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>0 MW</td> <td>130 MW</td> <td></td> <td></td> <td>12.12.2018 16:23</td> <td>13.12.2018 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>30 MW</td> <td>100 MW</td> <td></td> <td></td> <td>13.12.2018 07:00</td> <td>13.12.2018 09:39</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 13 Dec 2018 08:41:16 Z16544715-2d28-418f-88d2-2898633f04c0_1https://umm.nordpoolgroup.com/#/messages/16544715-2d28-418f-88d2-2898633f04c0/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 16:01:41</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Latvian 330kV grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>629 MW</td> <td>371 MW</td> <td>09.09.2019 00:00</td> <td>20.09.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>329 MW</td> <td>550 MW</td> <td>09.09.2019 00:00</td> <td>20.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 15:01:41 Z0e502ae9-3fc5-4f0b-af9a-786012e35dbb_1https://umm.nordpoolgroup.com/#/messages/0e502ae9-3fc5-4f0b-af9a-786012e35dbb/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:59:35</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>07.09.2019 00:00</td> <td>09.09.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>07.09.2019 00:00</td> <td>09.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:59:35 Zbd918d9a-3e21-4e28-89f9-ecf6a59e969b_1https://umm.nordpoolgroup.com/#/messages/bd918d9a-3e21-4e28-89f9-ecf6a59e969b/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:57:34</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Latvian 330kV grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>01.09.2019 00:00</td> <td>02.09.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>02.09.2019 00:00</td> <td>07.09.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>01.09.2019 00:00</td> <td>02.09.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>329 MW</td> <td>550 MW</td> <td>02.09.2019 00:00</td> <td>07.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:57:34 Zbf308b25-ecd4-47e9-9811-920e9e7fcb68_1https://umm.nordpoolgroup.com/#/messages/bf308b25-ecd4-47e9-9811-920e9e7fcb68/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:55:48</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>28.08.2019 00:00</td> <td>01.09.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>28.08.2019 00:00</td> <td>01.09.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:55:48 Zfd796152-ddb5-44a9-83e4-52c6976e3434_1https://umm.nordpoolgroup.com/#/messages/fd796152-ddb5-44a9-83e4-52c6976e3434/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:54:43</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019. Outage in Latvian grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>679 MW</td> <td>321 MW</td> <td>04.11.2019 00:00</td> <td>09.11.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>329 MW</td> <td>550 MW</td> <td>04.11.2019 00:00</td> <td>09.11.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:54:43 Z35d1e6fa-e2d9-4418-810c-f9a0163dc2ce_1https://umm.nordpoolgroup.com/#/messages/35d1e6fa-e2d9-4418-810c-f9a0163dc2ce/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:52:55</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019. Outage in Russian grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>09.11.2019 00:00</td> <td>25.11.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>09.11.2019 00:00</td> <td>25.11.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:52:55 Zd97189dc-33f5-4b64-87f2-579ab784fc71_1https://umm.nordpoolgroup.com/#/messages/d97189dc-33f5-4b64-87f2-579ab784fc71/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:49:13</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019. Outage in Latvian grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>25.11.2019 00:00</td> <td>07.12.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>25.11.2019 00:00</td> <td>07.12.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:49:13 Z14410016-af23-41e8-a4be-f39efa30ced7_1https://umm.nordpoolgroup.com/#/messages/14410016-af23-41e8-a4be-f39efa30ced7/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:47:54</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Yearly capacity coordination for 2019.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>779 MW</td> <td>221 MW</td> <td>07.12.2019 00:00</td> <td>01.01.2020 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>779 MW</td> <td>100 MW</td> <td>07.12.2019 00:00</td> <td>01.01.2020 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:47:54 Zb7bc3a28-80c0-4d36-a926-73eff0976186_2https://umm.nordpoolgroup.com/#/messages/b7bc3a28-80c0-4d36-a926-73eff0976186/2Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:46:01</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Russian 330kV grid.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>650 MW</td> <td>350 MW</td> <td>18.07.2019 00:00</td> <td>22.07.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>600 MW</td> <td>400 MW</td> <td>22.07.2019 00:00</td> <td>27.07.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>650 MW</td> <td>350 MW</td> <td>27.07.2019 00:00</td> <td>31.07.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>700 MW</td> <td>179 MW</td> <td>18.07.2019 00:00</td> <td>22.07.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>450 MW</td> <td>429 MW</td> <td>22.07.2019 00:00</td> <td>27.07.2019 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>179 MW</td> <td>27.07.2019 00:00</td> <td>31.07.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:46:01 Zd3c82cdb-71ed-4391-8f52-2410667076f9_1https://umm.nordpoolgroup.com/#/messages/d3c82cdb-71ed-4391-8f52-2410667076f9/1Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>12.12.2018 15:36:19</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>Outage in Russian 330 kV grid.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>650 MW</td> <td>350 MW</td> <td>06.07.2019 00:00</td> <td>18.07.2019 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>700 MW</td> <td>179 MW</td> <td>06.07.2019 00:00</td> <td>18.07.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 12 Dec 2018 14:36:19 Zb4a7d530-fa82-4329-ac47-660b5826ccad_3https://umm.nordpoolgroup.com/#/messages/b4a7d530-fa82-4329-ac47-660b5826ccad/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G1 <table> <tr> <th>Published:</th> <td>11.12.2018 06:05:51</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the turbine</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G1</td> <td>38W-MT--EEJG1--L</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>11.12.2018 00:20</td> <td>11.12.2018 03:29</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>118 MW</td> <td></td> <td></td> <td>11.12.2018 03:29</td> <td>11.12.2018 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 11 Dec 2018 05:05:51 Za296bc08-773b-44c3-9457-8d37c31b6841_5https://umm.nordpoolgroup.com/#/messages/a296bc08-773b-44c3-9457-8d37c31b6841/5Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G2 <table> <tr> <th>Published:</th> <td>10.12.2018 17:02:52</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Leakage in the boiler 2K-B secondary superheater</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 10 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G2</td> <td>38W-MT--EEJG2--H</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>06.12.2018 20:53</td> <td>10.12.2018 17:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 10 Dec 2018 16:02:52 Z1f2efa4e-0be6-4794-b3e1-5a0882e16c60_9https://umm.nordpoolgroup.com/#/messages/1f2efa4e-0be6-4794-b3e1-5a0882e16c60/9Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>07.12.2018 16:56:49</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>01.12.2018 00:00</td> <td>10.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>01.12.2018 00:00</td> <td>10.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 07 Dec 2018 15:56:49 Ze7063871-2829-4aa2-93d5-0041d83d80af_1https://umm.nordpoolgroup.com/#/messages/e7063871-2829-4aa2-93d5-0041d83d80af/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>06.12.2018 09:14:14</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 4K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>09.12.2018 00:00</td> <td>10.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 06 Dec 2018 08:14:14 Zb14b7369-a8d7-45f4-b039-059b9f1d94e0_1https://umm.nordpoolgroup.com/#/messages/b14b7369-a8d7-45f4-b039-059b9f1d94e0/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>06.12.2018 09:13:23</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 7K-B and 7K-A in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>45 MW</td> <td>118 MW</td> <td></td> <td></td> <td>08.12.2018 00:00</td> <td>10.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 06 Dec 2018 08:13:23 Zfc7e9dc1-df02-4dd5-8f1e-1e44ac152673_1https://umm.nordpoolgroup.com/#/messages/fc7e9dc1-df02-4dd5-8f1e-1e44ac152673/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>06.12.2018 09:12:04</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>08.12.2018 00:00</td> <td>09.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 06 Dec 2018 08:12:04 Zee723ca3-fa05-4dfe-814a-01137680fc1d_1https://umm.nordpoolgroup.com/#/messages/ee723ca3-fa05-4dfe-814a-01137680fc1d/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>05.12.2018 13:29:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 5K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>06.12.2018 00:00</td> <td>07.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 05 Dec 2018 12:29:33 Zfe46a33a-50d8-45d2-a882-09fec14c42cf_1https://umm.nordpoolgroup.com/#/messages/fe46a33a-50d8-45d2-a882-09fec14c42cf/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>05.12.2018 13:28:49</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>06.12.2018 00:00</td> <td>07.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 05 Dec 2018 12:28:49 Zf8270389-76fa-4071-81a2-4bf1506e6c9f_1https://umm.nordpoolgroup.com/#/messages/f8270389-76fa-4071-81a2-4bf1506e6c9f/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>04.12.2018 07:19:48</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the secondary equipment of the boiler 3K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>72 MW</td> <td>91 MW</td> <td></td> <td></td> <td>04.12.2018 22:00</td> <td>05.12.2018 02:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 04 Dec 2018 06:19:48 Z852a09a0-a0fe-487d-a97c-f4d5384a3f3c_1https://umm.nordpoolgroup.com/#/messages/852a09a0-a0fe-487d-a97c-f4d5384a3f3c/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>03.12.2018 09:13:09</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 3K-A.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>60 MW</td> <td>103 MW</td> <td></td> <td></td> <td>03.12.2018 22:00</td> <td>04.12.2018 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 03 Dec 2018 08:13:09 Z58e62c73-7ce8-471a-8567-4d5e66dbd9bb_2https://umm.nordpoolgroup.com/#/messages/58e62c73-7ce8-471a-8567-4d5e66dbd9bb/2Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>01.12.2018 14:18:52</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler K-25 water economizer</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after the event stop time is 8 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>60 MW</td> <td>70 MW</td> <td></td> <td></td> <td>29.11.2018 07:25</td> <td>01.12.2018 14:10</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 01 Dec 2018 13:18:52 Zf37b9c4d-a668-44e0-93d5-c4465321f660_4https://umm.nordpoolgroup.com/#/messages/f37b9c4d-a668-44e0-93d5-c4465321f660/4Planned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>01.12.2018 11:08:54</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 7K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>45 MW</td> <td>118 MW</td> <td></td> <td></td> <td>02.12.2018 21:00</td> <td>03.12.2018 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 01 Dec 2018 10:08:54 Z871582b8-0f56-4297-b9bf-36a6dcca5673_2https://umm.nordpoolgroup.com/#/messages/871582b8-0f56-4297-b9bf-36a6dcca5673/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>01.12.2018 09:42:33</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. The boilers 4K-A, 4K-B surfaces cleaning.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>01.12.2018 00:00</td> <td>02.12.2018 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sat, 01 Dec 2018 08:42:33 Z7bda19b7-5b53-4eb1-98ca-00140bdb3354_1https://umm.nordpoolgroup.com/#/messages/7bda19b7-5b53-4eb1-98ca-00140bdb3354/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>29.11.2018 11:24:41</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 7K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>45 MW</td> <td>118 MW</td> <td></td> <td></td> <td>01.12.2018 00:00</td> <td>01.12.2018 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 29 Nov 2018 10:24:41 Z360031b5-1dfc-49df-9e6e-d1dadb4a1c07_2https://umm.nordpoolgroup.com/#/messages/360031b5-1dfc-49df-9e6e-d1dadb4a1c07/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>29.11.2018 11:23:12</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>The planned event is cancelled</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 7K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>45 MW</td> <td>118 MW</td> <td></td> <td></td> <td>29.11.2018 21:00</td> <td>30.11.2018 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 29 Nov 2018 10:23:12 Z9ed325f5-34ce-485e-afd5-9d68c2242dc2_1https://umm.nordpoolgroup.com/#/messages/9ed325f5-34ce-485e-afd5-9d68c2242dc2/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>29.11.2018 09:04:29</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>02.12.2018 00:00</td> <td>03.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 29 Nov 2018 08:04:29 Zc14e09b8-9ffc-4719-86b0-1438fd9d3eac_1https://umm.nordpoolgroup.com/#/messages/c14e09b8-9ffc-4719-86b0-1438fd9d3eac/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>29.11.2018 08:52:04</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>29.11.2018 20:00</td> <td>30.11.2018 05:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 29 Nov 2018 07:52:04 Z1fc9b0e6-5675-4afd-b5e9-73be6634df15_25https://umm.nordpoolgroup.com/#/messages/1fc9b0e6-5675-4afd-b5e9-73be6634df15/25Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>28.11.2018 15:21:29</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> <tr> <th>Remarks:</th> <td>D-2 coordination</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>947 MW</td> <td>53 MW</td> <td>31.10.2018 19:00</td> <td>01.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>01.11.2018 00:00</td> <td>08.11.2018 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>829 MW</td> <td>171 MW</td> <td>08.11.2018 07:00</td> <td>08.11.2018 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>08.11.2018 21:00</td> <td>16.11.2018 07:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>16.11.2018 07:00</td> <td>16.11.2018 09:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>16.11.2018 09:00</td> <td>16.11.2018 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>16.11.2018 23:00</td> <td>17.11.2018 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>17.11.2018 11:00</td> <td>17.11.2018 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>17.11.2018 23:00</td> <td>18.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>679 MW</td> <td>321 MW</td> <td>18.11.2018 00:00</td> <td>18.11.2018 22:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>18.11.2018 22:00</td> <td>18.11.2018 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>18.11.2018 23:00</td> <td>19.11.2018 08:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>19.11.2018 08:00</td> <td>21.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>679 MW</td> <td>321 MW</td> <td>21.11.2018 00:00</td> <td>23.11.2018 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>879 MW</td> <td>121 MW</td> <td>23.11.2018 16:00</td> <td>01.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>31.10.2018 19:00</td> <td>01.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> </table> Wed, 28 Nov 2018 14:21:29 Z44c77664-c436-4e8d-9931-3cfe0735a5b0_1https://umm.nordpoolgroup.com/#/messages/44c77664-c436-4e8d-9931-3cfe0735a5b0/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>27.11.2018 09:18:22</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-A</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>28.11.2018 00:00</td> <td>28.11.2018 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 27 Nov 2018 08:18:22 Za986cefb-418c-4acb-8917-fc825423210a_1https://umm.nordpoolgroup.com/#/messages/a986cefb-418c-4acb-8917-fc825423210a/1Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>26.11.2018 15:47:25</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink1 failure</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>04.11.2018 18:54</td> <td>26.11.2018 15:45</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>04.11.2018 18:54</td> <td>26.11.2018 15:45</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00001Q</td> <td>:</td> <td>Estlink</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> <tr> <td>Elering</td> </tr> </table> Mon, 26 Nov 2018 14:47:25 Z7f35e457-8ad6-42b5-b69e-6f3026ff2052_5https://umm.nordpoolgroup.com/#/messages/7f35e457-8ad6-42b5-b69e-6f3026ff2052/5Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>26.11.2018 15:35:40</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Restriction for production unit grid connection set by Estonian TSO.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>0 MW</td> <td>130 MW</td> <td></td> <td></td> <td>25.11.2018 23:50</td> <td>26.11.2018 16:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>50 MW</td> <td>80 MW</td> <td></td> <td></td> <td>26.11.2018 16:00</td> <td>26.11.2018 19:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 26 Nov 2018 14:35:40 Za8892910-5a8c-45f8-a708-8641f186da39_1https://umm.nordpoolgroup.com/#/messages/a8892910-5a8c-45f8-a708-8641f186da39/1Other market information <table> <tr> <th>Published:</th> <td>26.11.2018 08:06:39</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>20.12.2018 07:00</td> </tr> <tr> <th>Event stop:</th> <td>20.12.2018 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant 2. The produced capacity will be given to Elspot market. Produced capacity will be: 07:00-08:00 30 MW; 08:00-09:00 127 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L543-------P</td> <td>:</td> <td>Kiisa-AREJ2</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Mon, 26 Nov 2018 07:06:39 Z502402af-a793-4f38-b399-66933b7efe55_1https://umm.nordpoolgroup.com/#/messages/502402af-a793-4f38-b399-66933b7efe55/1Other market information <table> <tr> <th>Published:</th> <td>26.11.2018 08:04:45</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>19.12.2018 07:00</td> </tr> <tr> <th>Event stop:</th> <td>19.12.2018 09:00</td> </tr> <tr> <th>Areas:</th> <td>EE</td> </tr> <tr> <th>Remarks:</th> <td>Monthly testing in Kiisa emergency power plant. The produced capacity will be given to Elspot market. Produced capacity will be: 7:00-8:00 26 MW; 8:00-9:00 98 MW.</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>38T-L089-------N</td> <td>:</td> <td>Kiisa-AREJ1</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Mon, 26 Nov 2018 07:04:45 Z8ea73732-2a0f-4452-9f6a-0b6f81a53b1c_3https://umm.nordpoolgroup.com/#/messages/8ea73732-2a0f-4452-9f6a-0b6f81a53b1c/3Planned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>25.11.2018 19:46:31</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Elimination of leakage in the boiler of secondary superheater. Required maintenance of Primary Air Fan of the boiler.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>0 MW</td> <td>274 MW</td> <td></td> <td></td> <td>21.11.2018 00:00</td> <td>25.11.2018 19:32</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>45 MW</td> <td>229 MW</td> <td></td> <td></td> <td>25.11.2018 19:32</td> <td>25.11.2018 21:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>100 MW</td> <td>174 MW</td> <td></td> <td></td> <td>25.11.2018 21:00</td> <td>25.11.2018 22:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>200 MW</td> <td>74 MW</td> <td></td> <td></td> <td>25.11.2018 22:00</td> <td>25.11.2018 23:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Sun, 25 Nov 2018 18:46:31 Zb771ea0e-943d-45a2-b8ee-469362acdeb4_3https://umm.nordpoolgroup.com/#/messages/b771ea0e-943d-45a2-b8ee-469362acdeb4/3Planned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>24.11.2018 07:46:20</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Dismissed</td> </tr> <tr> <th>Cancellation reason:</th> <td>UMM period information under UMM: https://umm.nordpoolgroup.com/#/messages/1fc9b0e6-5675-4afd-b5e9-73be6634df15/22</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Limitations coordinated between Estonian TSO and Latvian TSO according to &quot;Terms, Conditions and Methodologies on Cross-Zonal Capacity Calculation, Provision and Allocation within the Baltic States and with the 3rd Countries.</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>879 MW</td> <td>121 MW</td> <td>24.11.2018 00:00</td> <td>25.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>779 MW</td> <td>221 MW</td> <td>25.11.2018 00:00</td> <td>01.12.2018 00:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>24.11.2018 00:00</td> <td>01.12.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Sat, 24 Nov 2018 06:46:20 Zfd3c4469-c91c-4be2-a2be-30edc2ff4f34_5https://umm.nordpoolgroup.com/#/messages/fd3c4469-c91c-4be2-a2be-30edc2ff4f34/5Unplanned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>23.11.2018 15:43:54</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Unplanned 330 kv line outage in Russian grid.</td> </tr> <tr> <th>Remarks:</th> <td>End of unplanned outage</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>750 MW</td> <td>250 MW</td> <td>19.11.2018 08:00</td> <td>21.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>679 MW</td> <td>321 MW</td> <td>21.11.2018 00:00</td> <td>23.11.2018 16:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>19.11.2018 08:00</td> <td>23.11.2018 16:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 23 Nov 2018 14:43:54 Z6add6b39-1076-49ff-a73c-cee39bd9c643_1https://umm.nordpoolgroup.com/#/messages/6add6b39-1076-49ff-a73c-cee39bd9c643/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>23.11.2018 09:52:31</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 3K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>25.11.2018 00:00</td> <td>26.11.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 23 Nov 2018 08:52:31 Zd940664e-9a40-47bd-8efe-636ef1557a38_1https://umm.nordpoolgroup.com/#/messages/d940664e-9a40-47bd-8efe-636ef1557a38/1Other market information <table> <tr> <th>Published:</th> <td>23.11.2018 08:39:29</td> </tr> <tr> <th>Publisher:</th> <td>AS &quot;Augstsprieguma tīkls&quot;</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Event start:</th> <td>21.11.2018 00:00</td> </tr> <tr> <th>Areas:</th> <td>EE, LT, LV, PL, SE4</td> </tr> <tr> <th>Remarks:</th> <td>Baltic CCR national NRAs have approved Baltic CCR capacity calculation methodology (CCM) on 16th of November 2018 and this information was received by Baltic CCR TSOs on 21st of November 2018. Subject to provisions for the implementation of the methodology as detailed within 15.1 section are fulfilled, this methodology should become effective in 2019.You can find Baltic CCR CCM on all Baltic CCR TSOs&#39; homepages.</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>LITGRID, AB</td> </tr> <tr> <td>Augstsprieguma tīkls AS</td> </tr> <tr> <td>Elering</td> </tr> <tr> <td>Aff&#228;rsverket svenska kraftn&#228;t</td> </tr> <tr> <td>Polskie Sieci Elektroenergetyczne Sp&#243;łka Akcyjna</td> </tr> </table> Fri, 23 Nov 2018 07:39:29 Z6bfefde6-f0da-4d92-bb2b-39ad2bd1e9c7_3https://umm.nordpoolgroup.com/#/messages/6bfefde6-f0da-4d92-bb2b-39ad2bd1e9c7/3Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>22.11.2018 13:09:03</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 5K-A and 5K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>23.11.2018 00:00</td> <td>25.11.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 22 Nov 2018 12:09:03 Zdb330458-03be-4eb9-a881-11df48b7fd4e_1https://umm.nordpoolgroup.com/#/messages/db330458-03be-4eb9-a881-11df48b7fd4e/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>22.11.2018 10:26:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 4K-A surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>25.11.2018 00:00</td> <td>26.11.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 22 Nov 2018 09:26:50 Z1a15a37f-2d4b-4e91-b12f-0b74f1664e25_3https://umm.nordpoolgroup.com/#/messages/1a15a37f-2d4b-4e91-b12f-0b74f1664e25/3Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>22.11.2018 10:24:42</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 3K-A water economizer</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>19.11.2018 23:00</td> <td>23.11.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 22 Nov 2018 09:24:42 Z371e6adb-afe9-4e82-9c4b-48877616984a_1https://umm.nordpoolgroup.com/#/messages/371e6adb-afe9-4e82-9c4b-48877616984a/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>19.11.2018 13:58:12</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Annual maintenance of the unit</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>0 MW</td> <td>173 MW</td> <td></td> <td></td> <td>01.04.2019 00:00</td> <td>01.08.2019 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 19 Nov 2018 12:58:12 Zf5d4c4ca-3dce-46d6-9b80-865887dff476_2https://umm.nordpoolgroup.com/#/messages/f5d4c4ca-3dce-46d6-9b80-865887dff476/2Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G7 <table> <tr> <th>Published:</th> <td>19.11.2018 02:33:36</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of the turbine armature</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G7</td> <td>38W-MT--EEJG7--Y</td> <td></td> <td>163 MW</td> <td>0 MW</td> <td>163 MW</td> <td></td> <td></td> <td>19.11.2018 00:00</td> <td>19.11.2018 04:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td></td> <td>55 MW</td> <td>108 MW</td> <td></td> <td></td> <td>19.11.2018 04:00</td> <td>19.11.2018 08:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 19 Nov 2018 01:33:36 Ze3755b52-91fb-44ed-a149-c8a3946819df_2https://umm.nordpoolgroup.com/#/messages/e3755b52-91fb-44ed-a149-c8a3946819df/2Unplanned, Unavailability of electricity facilities: Transmission, EE → LV, LV → EE <table> <tr> <th>Published:</th> <td>16.11.2018 17:23:09</td> </tr> <tr> <th>Publisher:</th> <td>Elering AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Failure in Russian 330 kV grid</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>EE → LV</td> <td>EE - LV</td> <td>1000 MW</td> <td>700 MW</td> <td>300 MW</td> <td>16.11.2018 19:00</td> <td>16.11.2018 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>16.11.2018 23:00</td> <td>17.11.2018 11:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>700 MW</td> <td>300 MW</td> <td>17.11.2018 11:00</td> <td>17.11.2018 23:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>17.11.2018 23:00</td> <td>18.11.2018 00:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>679 MW</td> <td>321 MW</td> <td>18.11.2018 00:00</td> <td>18.11.2018 22:00</td> </tr> <tr> <td></td> <td></td> <td></td> <td>750 MW</td> <td>250 MW</td> <td>18.11.2018 22:00</td> <td>18.11.2018 23:00</td> </tr> <tr> <td>LV → EE</td> <td>LV - EE</td> <td>879 MW</td> <td>879 MW</td> <td>0 MW</td> <td>16.11.2018 07:00</td> <td>18.11.2018 22:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Elering</td> </tr> </table> Fri, 16 Nov 2018 16:23:09 Z11901f62-d06a-4a51-85fb-e7f8571fa65b_2https://umm.nordpoolgroup.com/#/messages/11901f62-d06a-4a51-85fb-e7f8571fa65b/2Unplanned, Unavailability of electricity facilities: Production, EE, Balti - G12 <table> <tr> <th>Published:</th> <td>16.11.2018 13:32:26</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Leakage in the boiler 26 primary superheater</td> </tr> <tr> <th>Remarks:</th> <td>Capacity start-up time after 16.11.2018 14:00 is 12 - 16 hours.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Balti</td> <td>38W-MT--BEJ----R</td> <td>EE</td> <td>322 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G12</td> <td>38W-MT--BEJG1Q-1</td> <td></td> <td>130 MW</td> <td>50 MW</td> <td>80 MW</td> <td></td> <td></td> <td>15.11.2018 09:30</td> <td>16.11.2018 14:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 16 Nov 2018 12:32:26 Z0a434740-06ee-46ee-a06c-a97cbf423739_2https://umm.nordpoolgroup.com/#/messages/0a434740-06ee-46ee-a06c-a97cbf423739/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>16.11.2018 10:18:59</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Boilers 3K-A and 3K-B in turn surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>17.11.2018 00:00</td> <td>19.11.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 16 Nov 2018 09:18:59 Z467fbc2c-1e1a-4955-bee7-4cdb81cb3560_2https://umm.nordpoolgroup.com/#/messages/467fbc2c-1e1a-4955-bee7-4cdb81cb3560/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>16.11.2018 10:04:15</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>16.11.2018 22:00</td> <td>17.11.2018 22:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 16 Nov 2018 09:04:15 Zf4bb8810-03d8-4713-b4a0-093e85f91816_2https://umm.nordpoolgroup.com/#/messages/f4bb8810-03d8-4713-b4a0-093e85f91816/2Planned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>16.11.2018 10:03:20</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>17.11.2018 22:00</td> <td>18.11.2018 07:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Fri, 16 Nov 2018 09:03:20 Zad121abe-6793-4cae-9bf8-f3fa43d3fe60_1https://umm.nordpoolgroup.com/#/messages/ad121abe-6793-4cae-9bf8-f3fa43d3fe60/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G4 <table> <tr> <th>Published:</th> <td>15.11.2018 09:46:09</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Foreseen maintenance</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>The boiler 4K-B surfaces cleaning</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G4</td> <td>38W-MT--EEJG4--9</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>18.11.2018 00:00</td> <td>19.11.2018 00:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 15 Nov 2018 08:46:09 Zd900eb30-9a9b-4b6b-a602-c675805ca982_1https://umm.nordpoolgroup.com/#/messages/d900eb30-9a9b-4b6b-a602-c675805ca982/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>15.11.2018 09:26:00</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>15.11.2018 21:00</td> <td>16.11.2018 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Thu, 15 Nov 2018 08:26:00 Z4e8f10b4-54d2-4507-b9da-6f5caf8a1d5d_1https://umm.nordpoolgroup.com/#/messages/4e8f10b4-54d2-4507-b9da-6f5caf8a1d5d/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G5 <table> <tr> <th>Published:</th> <td>14.11.2018 09:21:41</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 5K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G5</td> <td>38W-MT--EEJG5--5</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>14.11.2018 21:00</td> <td>15.11.2018 03:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Wed, 14 Nov 2018 08:21:41 Z3942dd6a-9fc9-4b10-b2ce-3cde3a736028_1https://umm.nordpoolgroup.com/#/messages/3942dd6a-9fc9-4b10-b2ce-3cde3a736028/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>13.11.2018 10:13:39</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx plant of the boiler 6K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>60 MW</td> <td>113 MW</td> <td></td> <td></td> <td>13.11.2018 21:00</td> <td>14.11.2018 04:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Tue, 13 Nov 2018 09:13:39 Z85b51c11-2e5a-4cbc-b429-3c3c454ef397_5https://umm.nordpoolgroup.com/#/messages/85b51c11-2e5a-4cbc-b429-3c3c454ef397/5Unplanned, Unavailability of electricity facilities: Transmission, FI → EE, EE → FI <table> <tr> <th>Published:</th> <td>13.11.2018 08:27:50</td> </tr> <tr> <th>Publisher:</th> <td>Fingrid Oyj</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Estlink1 failure</td> </tr> </table> <h3>Transmission Units</h3> <table> <tr> <th>Unit Name</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>From</th> <th>To</th> </tr> <tr> <td>FI → EE</td> <td>FI - EE</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>04.11.2018 18:54</td> <td>26.11.2018 23:59</td> </tr> <tr> <td>EE → FI</td> <td>EE - FI</td> <td>1016 MW</td> <td>658 MW</td> <td>358 MW</td> <td>04.11.2018 18:54</td> <td>26.11.2018 23:59</td> </tr> </table> <h3>Assets</h3> <table> <tr> <td>10T-FI-EE-00001Q</td> <td>:</td> <td>Estlink</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Fingrid Oyj</td> </tr> <tr> <td>Elering</td> </tr> </table> Tue, 13 Nov 2018 07:27:50 Z7d6aefd9-ccaa-41dd-8456-1414418e4b59_1https://umm.nordpoolgroup.com/#/messages/7d6aefd9-ccaa-41dd-8456-1414418e4b59/1Unplanned, Unavailability of electricity facilities: Production, EE, Estonian - G6 <table> <tr> <th>Published:</th> <td>12.11.2018 19:02:44</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Unplanned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>Required maintenance of DeSOx plant of the boiler B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G6</td> <td>38W-MT--EEJG6--1</td> <td></td> <td>173 MW</td> <td>65 MW</td> <td>108 MW</td> <td></td> <td></td> <td>13.11.2018 00:00</td> <td>13.11.2018 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 12 Nov 2018 18:02:44 Z178cbd10-dcd8-425d-b9e9-d3af97042a40_1https://umm.nordpoolgroup.com/#/messages/178cbd10-dcd8-425d-b9e9-d3af97042a40/1Planned, Unavailability of electricity facilities: Production, EE, Estonian - G3 <table> <tr> <th>Published:</th> <td>12.11.2018 09:21:51</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of DeSOx of the boiler 3K-B</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Estonian</td> <td>38W-MT--EEJ----3</td> <td>EE</td> <td>1355 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G3</td> <td>38W-MT--EEJG3--D</td> <td></td> <td>163 MW</td> <td>65 MW</td> <td>98 MW</td> <td></td> <td></td> <td>13.11.2018 00:00</td> <td>13.11.2018 06:00</td> </tr> </table> <h3>Market participants</h3> <table> <tr> <td>Enefit Energiatootmine AS</td> </tr> </table> Mon, 12 Nov 2018 08:21:51 Z2851e5a2-23b1-4fb1-86e2-c0400bc88453_1https://umm.nordpoolgroup.com/#/messages/2851e5a2-23b1-4fb1-86e2-c0400bc88453/1Planned, Unavailability of electricity facilities: Production, EE, Auvere - G-1 <table> <tr> <th>Published:</th> <td>10.11.2018 16:11:50</td> </tr> <tr> <th>Publisher:</th> <td>Eesti Energia AS</td> </tr> <tr> <th>Status:</th> <td>Active</td> </tr> <tr> <th>Type of Unavailability:</th> <td>Planned</td> </tr> <tr> <th>Reason Code:</th> <td>Failure</td> </tr> <tr> <th>Reason for the Unavailability:</th> <td>. Required maintenance of the secondary equipment of the unit.</td> </tr> </table> <h3>Production Units</h3> <table> <tr> <th>Unit Name</th> <th>Unit EIC</th> <th>Area</th> <th>Installed Capacity</th> <th>Available Capacity</th> <th>Unavailable Capacity</th> <th>Fuel Type</th> <th>Power Feed-In</th> <th>From</th> <th>To</th> </tr> <tr> <td>Auvere</td> <td>38W-KTJ-AUVERE-Z</td> <td>EE</td> <td>274 MW</td> <td></td> <td></td> <td>Fossil Oil Shale</td> <td></td> <td></td> <td></td> </tr> <tr> <td>G-1</td> <td>38W-KTJ-AUV-G1-8</td> <td></td> <td>274 MW</td> <td>174 MW</td> <td>100 MW</td> <td></td> <td></td> <td>11.11.2018 07:00</td> <td>11.11.2018 19:00</td> </tr> </table> <h3>Market partic